Three families
84 UNION STREET
BROOKLYN · BIN 3004379
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
M1-1Zoning
2,460 sfGross Floor Area
3Units
Three families · 2,100 sf lot · 1.17 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 14 docs
Floor 3Under Construction6p · 1 filing · 14 docs
Floor 2Under Construction9p · 1 filing · 18 docs
Floor 1
Cellar2p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V & ROGER CNSTRCTN CORPGeneral Contractor308/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VILLA PEX CONSULTING ENGI8408207/21/2026
BLACK BOX ENGINEERING7196405/12/2026
Building Lifecycle
All (75)Filed (8)Permit Issued (3)Inspection (2)Objection (32)Special Inspection (30)
08/25/2026
Filed — Alteration CO
PROPOSE NEW ALT-CO APPLICATION TO INCLUDE THE FILING SCOPE OF THE ABANDONED ALT I #302008841. THE ORIGINAL PLAN TO CONVERT THE MIXED-USE BUILDING INTO A 3 FAMILY BUILDING WILL NOW BE REVISED TO A 2 FAMILY BUILDING PER ZR 52-44.
B01445049-I1
08/25/2026
Filed — Alteration CO
PROPOSE NEW ALT-CO APPLICATION TO INCLUDE THE FILING SCOPE OF THE ABANDONED ALT I #302008841. THE ORIGINAL PLAN TO CONVERT THE MIXED-USE BUILDING INTO A 3 FAMILY BUILDING WILL NOW BE REVISED TO A 2 FAMILY BUILDING PER ZR 52-44.
B01445049-S1
08/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — Interior lighting power
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Objection resolved — Addressed
08/04/2026
Permit issued — General Construction
B01386588-I1-GC
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
07/28/2026
Objection raised — Cost
07/28/2026
Objection raised — Scope
07/28/2026
Objection raised — Scope
07/28/2026
Objection raised — Zoning
07/28/2026
Objection raised — Cost
07/28/2026
Objection raised — Scope
07/28/2026
Objection raised — Admin
07/28/2026
Objection raised — Mechanical
07/28/2026
Objection raised — Scope
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2026
Filed — Alteration
FURNISH AND INSTALL A COMPLETE SPRINKLER SYSTEM AS SHOWN ON THE PLANS ANDREQUIRED BY THIS SPECIFICATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01428172-I1
07/21/2026
Filed — Alteration
B01428171-I1
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Marabi
07/13/2026
Special inspection requirement — Maintenance information
David Marabi
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Marabi
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Marabi
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Marabi
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
David Marabi
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Marabi
07/08/2026
Special inspection requirement — Sprinkler Systems
David Marabi
07/08/2026
Special inspection requirement — Mechanical Systems
David Marabi
07/08/2026
Special inspection requirement — Final
David Marabi
06/30/2026
Permit issued — Structural
B01246179-S1-ST
06/30/2026
Permit issued — General Construction
B01246179-I1-GC
06/23/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Cost
06/04/2026
Objection raised — Fire_Protection
05/22/2026
Objection raised — Scope
05/12/2026
Filed — Alteration
INTERIOR RENOVATION OF THE 2ND FLOOR OF AN EXISTING TWO-FAMILY RESIDENCE INCLUDING REMOVAL AND CONSTRUCTION OF NON-LOAD-BEARING PARTITIONS, BATHROOM RENOVATION, AND ASSOCIATED ARCHITECTURAL, PLUMBING, AND ELECTRICAL WORK.
B01386588-I1
05/12/2026
Filed — Alteration
INTERIOR RENOVATION OF THE 2ND FLOOR OF AN EXISTING TWO-FAMILY RESIDENCE INCLUDING REMOVAL AND CONSTRUCTION OF NON-LOAD-BEARING PARTITIONS, BATHROOM RENOVATION, AND ASSOCIATED ARCHITECTURAL, PLUMBING, AND ELECTRICAL WORK.
B01386588-S1
04/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Cunningham
04/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
David Cunningham
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedV & ROGER CNSTRCTN CORP08/04/2026
DOB NOWStructuralPermit IssuedV & ROGER CNSTRCTN CORP06/30/2026
DOB NOWGeneral ConstructionPermit IssuedV & ROGER CNSTRCTN CORP06/30/2026
BISOTISSUEDCENTURION SOLAR ENERGY05/19/2022
BISPLISSUEDWALTER J.GRANDE P & H INC02/23/2006
BIS—ISSUEDBAUEN CONST CORP01/24/2006
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026——44 heads
1 project · most recent 05/12/2026
Water/Sanitary
FiledStatusContractorScope
05/12/2026——Water/Sanitary
2 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedJAMPROBE ELECTRIC LLCGeneral Wiring
08/08/2022CompleteBERGER QUALITY ELEC'L CON—
1 project · most recent 07/25/2025
FiledStatusContractorScope
07/25/2025Permit IssuedV & ROGER CNSTRCTN CORP1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/20/2026Tenant Protection Plan Compliance—special
08/20/2026HVAC-R and service water piping design and insulation—energy_progress
08/20/2026Energy Code Compliance Inspections—progress
08/20/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Interior lighting power—energy_progress
08/12/2026Energy Code Compliance Inspections—progress
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Fenestration and door U-factor and product ratings—energy_progress
08/12/2026Tenant Protection Plan Compliance—special
07/13/2026HVAC-R and service water heating system controlsDavid Marabienergy_progress
07/13/2026Maintenance informationDavid Marabienergy_progress
07/13/2026HVAC-R and service water heating equipmentDavid Marabienergy_progress
07/13/2026HVAC-R and service water piping design and insulationDavid Marabienergy_progress
07/09/2026Fire-Resistant Penetrations and JointsDavid Marabispecial
07/09/2026Tenant Protection Plan Compliance—special
07/09/2026Tenant Protection Plan Compliance—special
07/09/2026Energy Code Compliance InspectionsDavid Marabiprogress
07/09/2026Fire-Resistant Penetrations and JointsDavid Marabispecial
07/08/2026Sprinkler SystemsDavid Marabispecial
07/08/2026Mechanical SystemsDavid Marabispecial
07/08/2026FinalDavid Marabiprogress
04/13/2026HVAC-R and service water piping design and insulationDavid Cunninghamenergy_progress
04/13/2026Fire-Resistance Rated ConstructionDavid Cunninghamprogress
04/13/2026Fenestration air leakageDavid Cunninghamenergy_progress
04/13/2026Lighting in dwelling unitsDavid Cunninghamenergy_progress
Latest 25 of 44.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B01445049-S1Request digital key ↗
08/26/2026B01445049-I1Request digital key ↗
08/21/2026B01246179-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/26/2022340841897Open ↗
▸BISWORK PERMIT APPLICATION1
05/19/2022340841897Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B01386588-I1Open ↗
09/01/2026B01386588-I1Open ↗
09/01/2026B01386588-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B01445049-S1Open ↗
08/26/2026B01445049-I1Open ↗
08/21/2026B01246179-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01386588-I1Open ↗
08/31/2026B01246179-I1Open ↗
08/27/2026B01428171-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/26/2022340841897Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2022340841897Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/19/2022340841897Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01246179-I1Open ↗
08/21/2026B01246179-S1Open ↗
08/17/2026B01386588-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/26/2022340841897Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/08/2023340841897Open ↗
05/19/2022340841897Open ↗
04/26/2022340841897Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/26/2022340841897Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/08/2023340841897Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/26/2022340841897Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/08/2023340841897Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/08/2023340841897Open ↗
05/19/2022340841897Open ↗
04/26/2022340841897Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/09/2023340841897Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023340841897Open ↗
▸BISCOST AFFIDAVIT1
04/26/2022340841897Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
05/18/2022340841897Open ↗
04/26/2022340841897Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2022340841897Open ↗
▸Other Documents3
▸BISTax Abatement Miscellaneous1
03/09/2023340841897Open ↗
▸DOB NOWProperty Ownership Certification1
08/26/2026B01445049-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01246179-I1Open ↗