← Back
Four families
251 PRESIDENT STREET
BROOKLYN · BIN 3004585
💬 Discuss this project
1920Year Built
3Stories
C3Building Class
R6BZoning
2,862 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸
Four families · 1,908 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction2p · 1 filing · 3 docs
Floor 3Under Construction3p · 1 filing · 3 docs
Floor 2Under Construction3p · 1 filing · 3 docs
Floor 1
Basement2p · 1 filing · 14 docs
Sub-Basement4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ULTERIOR MODE104/23/2026
GRASSO-MENZIUSO ARCHITECTS305/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL DEMAROGeneral Contractor304/09/2026
CEL SVCS INC DBA CEL ELECElectrical103/22/2026
TECHCREW INCGeneral Contractor109/18/2026
BIG APPLE SEWER & DRAIN IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRASSO-MENZIUSO ARCHITECT1279305/08/2025
Building Lifecycle
All (48)Filed (4)Permit Issued (4)Signed Off (1)Violation (7)Inspection (6)Objection (20)Special Inspection (6)
09/17/2026
Permit issued — General Construction
B01376662-I1-GC
05/05/2026
Violation issued (HPD, open)
A
04/23/2026
Filed — Alteration
B01376662-I1
06/25/2025
Signed off — Alteration
Relocate 1 dw, 1 sink, 1 wc, , 1 lav , 1 tub and 1 gas range
B01094863-S1
06/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Violation issued (HPD, open)
A
05/08/2025
Filed — Alteration
Relocate 1 dw, 1 sink, 1 wc, , 1 lav , 1 tub and 1 gas range
B01094863-P1
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
04/07/2025
Permit issued — General Construction
B01094863-I1-GC
01/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Permit issued — Plumbing
B01094863-S1-PL
11/07/2024
Permit issued — General Construction
B01094863-I1-GC
10/11/2024
Objection raised — Mechanical
10/11/2024
Objection resolved — Addressed
10/07/2024
Filed — Alteration
Relocate 1 dw, 1 sink, 1 wc, , 1 lav , 1 tub and 1 gas range
B01094863-S1
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Objection resolved — Addressed
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
09/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
09/20/2024
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
09/17/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Other
09/05/2024
Objection raised — Inspections
09/05/2024
Objection raised — Other
09/05/2024
Objection raised — Other
09/05/2024
Objection raised — Fire_Protection
09/05/2024
Objection raised — Fire_Protection
09/05/2024
Objection raised — Other
09/05/2024
Objection raised — Accessibility
09/05/2024
Objection raised — Scope
08/29/2024
Filed — Alteration
Relocate 1 dw, 1 sink, 1 wc, , 1 lav , 1 tub and 1 gas range
B01094863-I1
08/12/2024
Special inspection requirement — Final
Christopher Menziuso
07/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2024
Violation issued (HPD, open)
A
12/19/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/24/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, open)
A
04/12/2021
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTECHCREW INC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedMICHAEL DEMARO04/07/2025
DOB NOWPlumbingSigned-offBIG APPLE SEWER & DRAIN I12/06/2024
DOB NOWGeneral ConstructionPermit IssuedMICHAEL DEMARO11/07/2024
1 project · most recent 05/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/08/2025Signed-offBIG APPLE SEWER & DRAIN IGas, Water/Sanitary
1 project · most recent 01/10/2025
General Wiring
FiledStatusContractorScope
01/10/2025CompleteCEL SVCS INC DBA CEL ELECGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/01/2025Fire-Resistant Penetrations and JointsChristopher Menziusospecial
09/20/2024Fire-Resistant Penetrations and JointsChristopher Menziusospecial
09/20/2024Energy Code Compliance InspectionsChristopher Menziusoprogress
09/20/2024Fire-Resistance Rated ConstructionChristopher Menziusoprogress
09/20/2024Lighting in dwelling unitsChristopher Menziusoenergy_progress
08/12/2024FinalChristopher Menziusoprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01094863-I1Request digital key ↗
08/21/2026B01094863-S1Request digital key ↗
08/21/2026B01094863-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01094863-S1Open ↗
08/21/2026B01094863-I1Open ↗
08/21/2026B01094863-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01094863-I1Open ↗
08/24/2026B01094863-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01094863-P1Open ↗
08/24/2026B01094863-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01094863-I1Open ↗
08/17/2026B01376662-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026B01094863-S1Open ↗