← Back
Walk-up cooperative
430 CLINTON STREET
BROOKLYN · BIN 3004778
💬 Discuss this project
1900Year Built
4Stories
C6Building Class
R6AZoning
5,568 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · Owner of record: 430 CLINTON HOUSE INC. · 2,533 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 7 docs
Floor 3Under Construction9p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC607/08/2026
E-Z PERMIT NY, LLC1303/22/2026
430 CLINTON HOUSE INC.103/22/2026
EXO INDUSTRIES403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CUONO ENGINEERING PLLC112/05/2025
NICHOLAS STANOS ARCHITECT, PLLC212/02/2025
P.A. COLLINS PE212/02/2025
MJE PROFESSIONAL SERVICES512/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC503/21/2026
QUICK FILING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXO INDUSTRIES CORPGeneral Contractor707/08/2026
APC RENOVATION INCGeneral Contractor207/03/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor207/08/2026
RICHARD NEUElectrical103/22/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/01/2026
DYNAMIC BLUE WATER MECHPlumbing107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962412/05/2025
RAD DESIGN & ARCHITECTURE2082101/19/2023
STRUCT. ENGINEERING INTEG4174101/19/2023
Building Lifecycle
All (72)Filed (10)Permit Issued (9)Signed Off (3)Violation (10)Inspection (2)Objection (8)Special Inspection (30)
07/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2026
Permit issued — Structural
B01320250-S3-ST
06/29/2026
Permit issued — Plumbing
B01320250-S1-PL
06/29/2026
Permit issued — Plumbing
B01320250-S1-PL
06/24/2026
Permit issued — General Construction
B01320250-I1-GC
12/17/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/09/2025
Objection raised — Other
12/05/2025
Filed — Alteration
Combination of 2 Apartments into 1 - 2nd and 3rd Fl units- No new C of O as per TECHNICALPOLICY AND PROCEDURE NOTICE #3/97- PLUMBING WORK IN CONJUNCTION WITH THE OT#B01320250-I1
B01320250-S3
12/05/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
GUNJAN KHANDWALA
12/04/2025
Objection raised — Other
12/04/2025
Objection raised — Other
12/04/2025
Objection raised — Other
12/03/2025
Special inspection requirement — Structural Steel - Welding
GUNJAN KHANDWALA
12/03/2025
Special inspection requirement — Structural Steel - Details
GUNJAN KHANDWALA
12/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GUNJAN KHANDWALA
12/03/2025
Special inspection requirement — Structural Wood Frame
GUNJAN KHANDWALA
12/02/2025
Filed — Alteration
Combination of 2 Apartments into 1 - 2nd and 3rd Fl units- No new C of O as per TECHNICALPOLICY AND PROCEDURE NOTICE #3/97- PLUMBING WORK IN CONJUNCTION WITH THE OT#B01320250-I1
B01320250-S1
12/02/2025
Filed — Alteration
Combination of 2 Apartments into 1 - 2nd and 3rd Fl units- No new C of O as per TECHNICALPOLICY AND PROCEDURE NOTICE #3/97- PLUMBING WORK IN CONJUNCTION WITH THE OT#B01320250-I1
B01320250-S2
12/02/2025
Filed — Alteration
Combination of 2 Apartments into 1 - 2nd and 3rd Fl units- No new C of O as per TECHNICALPOLICY AND PROCEDURE NOTICE #3/97- PLUMBING WORK IN CONJUNCTION WITH THE OT#B01320250-I1
B01320250-I1
11/26/2025
Special inspection requirement — Heating Systems
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — Maintenance information
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — Shutoff dampers
GUNJAN KHANDWALA
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Interior lighting power
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Final
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Mechanical Systems
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Final
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Final
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Lighting in dwelling units
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Lighting controls
GUNJAN KHANDWALA
11/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
GUNJAN KHANDWALA
06/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00812683-I1
01/31/2025
Signed off — Alteration
B08014561-I1
11/29/2024
Violation issued (HPD, closed)
I
07/02/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B08012127-I1
03/12/2024
Permit issued — Supported Scaffold
B00812683-I1-SF
12/04/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00812683-P3
11/22/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00812683-P2
10/23/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00812683-P1
10/13/2023
Permit issued — Sidewalk Shed
B08012127-I1-SH
09/15/2023
Violation issued (ECB, closed)
Construction
09/15/2023
Violation issued (ECB, closed)
Construction
09/15/2023
Violation issued (ECB, closed)
Construction
09/14/2023
Violation issued (ECB, closed)
Construction
08/02/2023
Permit issued — General Construction
B08014561-I1-GC
03/22/2023
Violation issued (HPD, closed)
A
01/24/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00812683-I1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedAPC RENOVATION INC07/01/2026
DOB NOWPlumbingPermit IssuedDYNAMIC BLUE WATER MECH06/29/2026
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC06/29/2026
DOB NOWGeneral ConstructionPermit IssuedAPC RENOVATION INC06/24/2026
DOB NOWSupported ScaffoldSigned-offEXO INDUSTRIES CORP03/12/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION10/13/2023
DOB NOWGeneral ConstructionSigned-offEXO INDUSTRIES CORP08/02/2023
DOB NOWSupported ScaffoldSigned-offEXO INDUSTRIES CORP01/24/2023
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION09/30/2022
1 project · most recent 12/05/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/05/2025Permit IssuedAPC RENOVATION INCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric mxz-sm60nl 60,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric mxz-sm60nl 66,000 BTU · Condensing Unit ×1
1 project · most recent 12/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/05/2025Permit IssuedDYNAMIC BLUE WATER MECHGas, Water/Sanitary
2 projects · most recent 06/28/2026
General Wiring
FiledStatusContractorScope
06/28/2026Permit IssuedEIS ELECTRIC NYC CORPGeneral Wiring
09/30/2022CompleteRICHARD NEU—
1 project · most recent 12/05/2025
Steel Wood
FiledStatusContractorScope
12/05/2025Permit IssuedAPC RENOVATION INCSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
12/05/2025Construction Utilizing CLT or SCL, Type IVGUNJAN KHANDWALAspecial
12/03/2025Structural Steel - WeldingGUNJAN KHANDWALAspecial
12/03/2025Structural Steel - DetailsGUNJAN KHANDWALAspecial
12/03/2025Structural Steel - High Strength BoltingGUNJAN KHANDWALAspecial
12/03/2025Structural Wood FrameGUNJAN KHANDWALAprogress
11/26/2025Heating SystemsGUNJAN KHANDWALAspecial
11/26/2025HVAC-R and service water heating equipmentGUNJAN KHANDWALAenergy_progress
11/26/2025Maintenance informationGUNJAN KHANDWALAenergy_progress
11/26/2025HVAC-R and service water heating system controlsGUNJAN KHANDWALAenergy_progress
11/26/2025HVAC-R and service water piping design and insulationGUNJAN KHANDWALAenergy_progress
11/26/2025Shutoff dampersGUNJAN KHANDWALAenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
11/17/2025Interior lighting powerGUNJAN KHANDWALAenergy_progress
11/17/2025Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
11/17/2025Structural Stability – Alterations of existing buildingsGUNJAN KHANDWALAspecial
11/17/2025FinalGUNJAN KHANDWALAprogress
11/17/2025Mechanical SystemsGUNJAN KHANDWALAspecial
11/17/2025FinalGUNJAN KHANDWALAprogress
11/17/2025Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
11/17/2025Structural Stability – Alterations of existing buildingsGUNJAN KHANDWALAspecial
11/17/2025Tenant Protection Plan ComplianceGUNJAN KHANDWALAspecial
11/17/2025Energy Code Compliance InspectionsGUNJAN KHANDWALAprogress
11/17/2025FinalGUNJAN KHANDWALAprogress
11/17/2025Lighting in dwelling unitsGUNJAN KHANDWALAenergy_progress
11/17/2025Lighting controlsGUNJAN KHANDWALAenergy_progress
Latest 25 of 30.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08012127-I1Request digital key ↗
08/27/2026B08014561-I1Request digital key ↗
08/26/2026B00812683-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026B08014561-I1Open ↗
09/01/2026B08014561-I1Open ↗
09/01/2026B08014561-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B08014561-I1Open ↗
08/31/2026B01320250-I1Open ↗
08/31/2026B01320250-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00812683-P2Open ↗
08/26/2026B00812683-P3Open ↗
08/26/2026B00812683-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01320250-S1Open ↗
08/19/2026B01320250-S2Open ↗
08/15/2026B01320250-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026B01320250-S3Open ↗
08/13/2026B08014561-I1Open ↗