← Back
Four families
156 SUMMIT STREET
BROOKLYN · BIN 3005056
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R6BZoning
3,840 sfGross Floor Area
4Units
Rent Stabilized9 Open Violations ▸
Four families · Owner of record: 156 SUMMIT STREET LLC · 2,075 sf lot · 1.85 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCALI CONSTRUCTION2707/08/2026
156 SUMMIT STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2021$2.4M—Private party → 156 SUMMIT STREET LLC$625/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE809/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCALI CONSTRUCTION INCGeneral Contractor1107/08/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DEMERARA ENGINEERING, PLL4248609/19/2025
THINK DESIGN ARCHITECTURA683112/14/2021
Building Lifecycle
All (38)Filed (8)Permit Issued (8)Signed Off (2)Violation (13)Inspection (7)
05/06/2026
Violation issued (HPD, open)
A
02/10/2026
Signed off — Alteration
JOB DESCRIPTION APPLICATION IS FILED FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00648344-I1
11/20/2025
Violation issued (HPD, open)
I
09/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/19/2025
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-P4
09/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/04/2025
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-P3
07/08/2025
Permit issued — Mechanical Systems
B00643629-S1-GC-CX
06/11/2025
Violation issued (HPD, open)
A
04/29/2025
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-P2
11/29/2024
Violation issued (HPD, open)
I
11/21/2024
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-P1
05/24/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/24/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2024
Permit issued — Plumbing
B00643629-S2-PL
05/09/2024
Signed off — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-I1
05/09/2024
Permit issued — General Construction
B00643629-S1-GC-CX
05/02/2024
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-S2
05/02/2024
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-S1
04/12/2024
Violation issued (HPD, open)
A
04/02/2024
Permit issued — General Construction
B00643629-I1-GC
11/22/2023
Violation issued (HPD, open)
I
04/24/2023
Permit issued — Construction Fence
B00648344-I1-FN
03/29/2023
Permit issued — General Construction
B00643629-I1-GC
03/27/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
03/02/2022
Violation issued (HPD, open)
A
12/17/2021
Permit issued — Construction Fence
B00648344-I1-FN
12/17/2021
Permit issued — General Construction
B00643629-I1-GC
12/16/2021
Filed — Alteration
JOB DESCRIPTION APPLICATION IS FILED FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00648344-I1
12/14/2021
Filed — Alteration
THE INTERIOR ALTERATION OF AN EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00643629-I1
04/13/2021
Violation issued (HPD, closed)
A
10/22/2018
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
02/25/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSCALI CONSTRUCTION INC07/08/2025
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC05/13/2024
DOB NOWGeneral ConstructionSigned-offSCALI CONSTRUCTION INC05/09/2024
DOB NOWGeneral ConstructionSigned-offSCALI CONSTRUCTION INC04/02/2024
DOB NOWConstruction FenceSigned-offSCALI CONSTRUCTION INC04/24/2023
DOB NOWGeneral ConstructionSigned-offSCALI CONSTRUCTION INC03/29/2023
DOB NOWConstruction FenceSigned-offSCALI CONSTRUCTION INC12/17/2021
DOB NOWGeneral ConstructionSigned-offSCALI CONSTRUCTION INC12/17/2021
1 project · most recent 09/19/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/19/2025Signed-offSCALI CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KY069A 6,000 BTU · Split System ×20
MXZ-3C24AHZ4 30,000 BTU · Heat Pump Outdoor ×10
MLZ-KP18NA2 18,000 BTU · Split System ×20
MLZ-KP12NA 12,000 BTU · Vrf Indoor ×5
MLZ-KY06NA 6,000 BTU · Split System ×30
MXZ3C30NAHZ4 30,000 BTU · Heat Pump Outdoor ×9
MXZ-2C20NAHZ4 20,000 BTU · Heat Pump Outdoor ×3
MXZ-SM42NAMHZ4 42,000 BTU · Vrf Outdoor ×3
1 project · most recent 09/23/2025
General Wiring
FiledStatusContractorScope
09/23/2025CompleteACCURATE ELEC'L CONSTR &General Wiring
1 project · most recent 09/19/2025
Wood
FiledStatusContractorScope
09/19/2025Signed-offSCALI CONSTRUCTION INCWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
09/19/2025Maintenance informationOscar Walters Jrenergy_progress
09/19/2025HVAC-R and service water heating system controlsOscar Walters Jrenergy_progress
09/19/2025Fenestration air leakageOscar Walters Jrenergy_progress
09/19/2025Maintenance informationOscar Walters Jrenergy_progress
09/19/2025Interior lighting powerOscar Walters Jrenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsOscar Walters Jrenergy_progress
09/19/2025Permanent certificateOscar Walters Jrenergy_progress
09/19/2025Structural Stability – Alterations of existing buildingsOscar Walters Jrspecial
09/19/2025Wood – Seismic ResistanceOscar Walters Jrspecial
09/19/2025Mechanical SystemsOscar Walters Jrspecial
09/19/2025Energy Code Compliance InspectionsOscar Walters Jrprogress
09/19/2025Fire-Resistance Rated ConstructionOscar Walters Jrprogress
09/19/2025FinalOscar Walters Jrprogress
09/19/2025HVAC-R and service water piping design and insulationOscar Walters Jrenergy_progress
09/19/2025Fenestration areasOscar Walters Jrenergy_progress
09/19/2025HVAC-R and service water heating equipmentOscar Walters Jrenergy_progress
09/19/2025HVAC-R and service water piping design and insulationOscar Walters Jrenergy_progress
09/19/2025HVAC-R and service water heating system controlsOscar Walters Jrenergy_progress
09/19/2025Fenestration air leakageOscar Walters Jrenergy_progress
09/19/2025Permanent certificateOscar Walters Jrenergy_progress
09/19/2025HVAC-R and service water heating equipmentOscar Walters Jrenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsOscar Walters Jrenergy_progress
09/19/2025Interior lighting powerOscar Walters Jrenergy_progress
09/19/2025Wood – Seismic Resistance—special
09/19/2025Mechanical SystemsOscar Walters Jrspecial
Latest 25 of 67.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026B00643629-P4Request digital key ↗
08/31/2026B00643629-P3Request digital key ↗
08/31/2026B00643629-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B00643629-I1Open ↗
08/25/2026B00643629-P2Open ↗
08/25/2026B00643629-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00643629-P4Open ↗
08/31/2026B00643629-P3Open ↗
08/31/2026B00643629-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B00643629-I1Open ↗
08/25/2026B00643629-P2Open ↗
08/24/2026B00643629-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00643629-P3Open ↗
08/31/2026B00643629-P2Open ↗
08/31/2026B00643629-P1Open ↗
Showing 3 of 7 on file for this type