← Back
Five to six families
64 1 PLACE
BROOKLYN · BIN 3005140
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
R6AZoning
4,100 sfGross Floor Area
5Units
Rent Stabilized9 Open Violations ▸
Five to six families · Owner of record: 64 1ST PLACE LLC · 2,050 sf lot · 2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
64 1ST PLACE203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2025$5.3M—Private party → 64 1ST PLACE LLC$1,293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES106/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES103/21/2026
Building Lifecycle
All (98)Filed (1)Violation (16)Objection (62)Special Inspection (19)
05/21/2026
Objection resolved — Resolved
05/21/2026
Objection resolved — Resolved
05/21/2026
Objection resolved — Resolved
05/14/2026
Objection raised — Other
04/30/2026
Violation issued (HPD, open)
A
04/06/2026
Objection resolved — Resolved
04/02/2026
Objection raised — Other
04/02/2026
Objection raised — Admin
04/02/2026
Objection raised — Zoning
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Cost
03/18/2026
Objection raised — Zoning
03/18/2026
Objection raised — Admin
02/26/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/12/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Fire_Protection
01/02/2026
Objection raised — Mechanical
12/22/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/01/2025
Objection raised — Zoning
12/01/2025
Objection raised — Zoning
12/01/2025
Objection raised — Structural
12/01/2025
Objection raised — Zoning
12/01/2025
Objection raised — Fire_Protection
12/01/2025
Objection raised — Mechanical
12/01/2025
Objection raised — Fire_Protection
12/01/2025
Objection raised — Fire_Protection
12/01/2025
Objection raised — Fire_Protection
12/01/2025
Objection raised — Zoning
11/20/2025
Violation issued (HPD, open)
I
11/20/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/05/2025
Objection raised — Structural
11/05/2025
Objection raised — Structural
11/03/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Structural
10/06/2025
Objection raised — Structural
10/06/2025
Objection raised — Structural
10/06/2025
Objection raised — Energy
10/06/2025
Objection raised — Zoning
10/06/2025
Objection raised — Fire_Protection
10/06/2025
Objection raised — Scope
09/11/2025
Objection resolved — Addressed
Latest 60 of 98 events.
Nothing on file for this building.
1 project · most recent 08/15/2025
General Wiring
FiledStatusContractorScope
08/15/2025Permit IssuedNAPSTAR ELECTRIC INCGeneral Wiring
1 project · most recent 06/27/2025
Steel Wood
FiledStatusContractorScope
06/27/2025——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/26/2025Exterior Insulation and Finish Systems (EIFS)—special
06/26/2025Fire-Resistant Penetrations and Joints—special
06/26/2025Masonry—special
06/26/2025Structural Stability – Alterations of existing buildings—special
06/26/2025Energy Code Compliance Inspections—progress
06/26/2025Fire-Resistance Rated Construction—progress
06/26/2025Insulation placement and R values—energy_progress
06/26/2025Air barrier — testing —energy_progress
06/26/2025Fenestration air leakage—energy_progress
06/26/2025Lighting in dwelling units—energy_progress
06/26/2025Interior lighting power—energy_progress
06/26/2025Lighting controls—energy_progress
06/26/2025Maintenance information—energy_progress
06/26/2025Protection of exposed foundation insulation—energy_progress
06/26/2025Metering—energy_progress
06/26/2025Exterior lighting power—energy_progress
06/26/2025Fenestration and door U-factor and product ratings—energy_progress
06/26/2025Air barrier - visual inspection—energy_progress
06/26/2025Fenestration areas—energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B01245376-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01245376-I1Open ↗
08/21/2026B01245376-S3Open ↗
08/21/2026B01245376-S4Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026B01245376-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/21/2026B01245376-S3Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/21/2026B01245376-S3Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01245376-I1Open ↗