← Back
Five to six families
47 2 PLACE
BROOKLYN · BIN 3005178
💬 Discuss this project
1900Year Built
2Stories
C2Building Class
R6BZoning
3,834 sfGross Floor Area
5Units
Rent Stabilized0 Open Violations
Five to six families · Owner of record: 461 CLINTON, LLC · 1,277 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 18 docs
Floor 3Under Construction2p · 1 filing · 18 docs
Floor 2
Floor 1
CellarUnder Construction1 filing · 18 docs
Sub-BasementUnder Construction1 filing · 18 docs
1 job · most recent 12/04/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Permit IssuedTIGER GENERAL CONTRACTORHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOUH36KWAS4 36,000 BTU · Heat Pump Outdoor ×2
1 job · most recent 12/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/04/2025Signed-offABOUT THE FINISH LLCGas, Water/Sanitary
2 jobs · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedPAPPAS & FODERA ELECT'LGeneral Wiring
08/19/2019Permit IssuedPAPPAS & FODERA ELECT'LGeneral Wiring
1 job · most recent 12/04/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/04/2025Permit IssuedTIGER GENERAL CONTRACTORTenant Protection Plan 72 Hour
Building Lifecycle
All (61)Filed (4)Permit Issued (5)Violation (9)Inspection (7)Objection (14)Special Inspection (22)
04/30/2026
Violation issued (HPD, closed)
A
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/02/2026
Permit issued — General Construction
B01252896-I1-GC-CX
02/05/2026
Permit issued — Mechanical Systems
B01252896-I1-GC-CX
12/18/2025
Special inspection requirement — Fenestration areas
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Final
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Maintenance information
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
12/18/2025
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
12/04/2025
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION IN CELLAR AND COMBINING OF APARTMENTS 1A AND 1B IN THE BASEMENT OF EXISTING 2 STORY APARTMENT BUILDING AS PER TPPN #3/97. NO CHANGE IN BULK, USE OR OCCUPANCY. ALL WORK IS AS PER PLANS SUBMITTED HEREWIT
B01252896-P2
12/01/2025
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION IN CELLAR AND COMBINING OF APARTMENTS 1A AND 1B IN THE BASEMENT OF EXISTING 2 STORY APARTMENT BUILDING AS PER TPPN #3/97. NO CHANGE IN BULK, USE OR OCCUPANCY. ALL WORK IS AS PER PLANS SUBMITTED HEREWIT
B01252896-P1
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Final
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Fenestration areas
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
11/26/2025
Special inspection requirement — Maintenance information
JOHN SEMIOLI
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
11/12/2025
Permit issued — Plumbing
B01252896-S1-PL
08/28/2025
Permit issued — Plumbing
B01252896-S1-PL
08/25/2025
Permit issued — Mechanical Systems
B01252896-I1-GC-CX
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
08/04/2025
Objection raised — Plumbing
07/24/2025
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION IN CELLAR AND COMBINING OF APARTMENTS 1A AND 1B IN THE BASEMENT OF EXISTING 2 STORY APARTMENT BUILDING AS PER TPPN #3/97. NO CHANGE IN BULK, USE OR OCCUPANCY. ALL WORK IS AS PER PLANS SUBMITTED HEREWIT
B01252896-S1
07/22/2025
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION IN CELLAR AND COMBINING OF APARTMENTS 1A AND 1B IN THE BASEMENT OF EXISTING 2 STORY APARTMENT BUILDING AS PER TPPN #3/97. NO CHANGE IN BULK, USE OR OCCUPANCY. ALL WORK IS AS PER PLANS SUBMITTED HEREWIT
B01252896-I1
07/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2023
Violation issued (HPD, closed)
A
02/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
215 REALTY1407/08/2026
461 CLINTON, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VALENTINO POMPEO ARCHITECT, P.C.412/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TIGER GENERAL CONTRACTORGeneral Contractor304/09/2026
ABOUT THE FINISH LLCPlumbing207/08/2026
CHIARAMONTE, SALVATOREElectrical103/21/2026
FELIZ, GABRIELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352212/01/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTIGER GENERAL CONTRACTOR03/02/2026
DOB NOWMechanical SystemsPermit IssuedTIGER GENERAL CONTRACTOR02/05/2026
DOB NOWPlumbingSigned-offABOUT THE FINISH LLC11/12/2025
DOB NOWPlumbingSigned-offABOUT THE FINISH LLC08/28/2025
DOB NOWMechanical SystemsPermit IssuedTIGER GENERAL CONTRACTOR08/25/2025
BISPLISSUEDA PLUS PLUMBING CORP06/24/2019
BISMHISSUEDTIGER GENERAL CONTRACTOR08/13/2016
BISPLISSUEDA PLUS PLUMBING CORP08/13/2016
BISOTISSUEDTIGER GENERAL CONTRACTOR08/03/2016
BISOTISSUEDTIGER GENERAL CONTRACTOR08/10/2012
BIS—ISSUEDMODERN CONCEPT RENOV INC08/21/2009
BISPLISSUEDJOHN SALLUSTIO PLUMBING03/18/2009
BISPLISSUEDJOHN SALLUSTIO PLUMBING03/12/2008
BIS—ISSUEDMODERN CONCEPTS RENOVATION INC.02/06/2008
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/18/2025Fenestration areasJOHN SEMIOLIenergy_progress
12/18/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
12/18/2025Mechanical SystemsJOHN SEMIOLIspecial
12/18/2025Energy Code Compliance InspectionsJOHN SEMIOLIprogress
12/18/2025FinalJOHN SEMIOLIprogress
12/18/2025Maintenance informationJOHN SEMIOLIenergy_progress
12/18/2025Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
12/18/2025Fenestration air leakageJOHN SEMIOLIenergy_progress
12/18/2025HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
12/18/2025HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
12/18/2025HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
11/26/2025Mechanical SystemsJOHN SEMIOLIspecial
11/26/2025Energy Code Compliance InspectionsJOHN SEMIOLIprogress
11/26/2025FinalJOHN SEMIOLIprogress
11/26/2025Fenestration air leakageJOHN SEMIOLIenergy_progress
11/26/2025Fenestration areasJOHN SEMIOLIenergy_progress
11/26/2025Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
11/26/2025HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
11/26/2025HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
11/26/2025Maintenance informationJOHN SEMIOLIenergy_progress
11/26/2025HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01252896-I1Request digital key ↗
08/19/2026B01252896-S1Request digital key ↗
08/19/2026B01252896-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION14
06/25/2019340667941Open ↗
03/25/2019340667941Open ↗
03/25/2019340667941Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
12/27/2019340655552Open ↗
12/19/2019340667941Open ↗
04/29/2019340667941Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
05/13/2020340667941Open ↗
12/09/2019340667941Open ↗
01/25/2019340655552Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/14/2009310013669Open ↗
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/03/2020340667941Open ↗
12/19/2019340667941Open ↗
10/23/2017340408142Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01252896-P1Open ↗
08/19/2026B01252896-S1Open ↗
08/19/2026B01252896-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01252896-I1Open ↗
09/23/2026B01252896-I1Open ↗
08/23/2026B01252896-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01252896-I1Open ↗
08/23/2026B01252896-P1Open ↗
▸BISPC FULL REPORT1
01/07/2008310013669Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING7
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
11/10/2009310013669Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
04/18/2019340667941Open ↗
▸BISSTREET TREE CHECKLIST1
06/14/2012320492365Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01252896-S1Open ↗
08/19/2026B01252896-I1Open ↗
08/19/2026B01252896-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/27/2007310013669Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/02/2019340667941Open ↗
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/03/2020340667941Open ↗
10/23/2017340408142Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/03/2020340667941Open ↗
10/26/2017340408142Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/13/2020340667941Open ↗
05/13/2020340667941Open ↗
05/12/2020340667941Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
05/13/2020340667941Open ↗
03/03/2020340667941Open ↗
10/26/2017340408142Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/13/2020340667941Open ↗
10/23/2017340408142Open ↗
10/23/2017340408142Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/14/2012320492365Open ↗
08/27/2007310013669Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
03/03/2020340667941Open ↗
04/02/2019340667941Open ↗
03/25/2019340667941Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION9
05/13/2020340667941Open ↗
03/03/2020340667941Open ↗
12/19/2019340667941Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
03/03/2020340667941Open ↗
12/27/2019340655552Open ↗
10/26/2017340408142Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/25/2019340667941Open ↗
01/16/2019340655552Open ↗
08/02/2016340408142Open ↗
▸BISEFILING COVER SHEET1
06/14/2012320492365Open ↗