Miscellaneous two family
28 3 PLACE
BROOKLYN · BIN 3005343
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
0 Open Violations
Miscellaneous two family · 1,900 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof15p · 1 filing · 20 docs
Floor 231p · 2 filings · 20 docs
Floor 126p · 2 filings · 20 docs
Cellar13p · 1 filing · 12 docs
Sub-Basement24p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2022$3.3M—— → —$1,381/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PORTERFANNA ARCHITECTURE602/03/2026
MURRAY ENGINEERING PC210/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACARA CONSTRUCTION INCGeneral Contractor607/08/2026
R.J.C. MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842402/03/2026
LJ PORTER3979502/03/2026
Building Lifecycle
All (68)Filed (8)Permit Issued (6)Signed Off (2)Violation (2)Objection (20)Special Inspection (30)
03/02/2026
Special inspection requirement — Insulation placement and R values
L J PORTER
03/02/2026
Special inspection requirement — Fenestration air leakage
L J PORTER
03/02/2026
Special inspection requirement — Interior lighting power
L J PORTER
03/02/2026
Special inspection requirement — Fenestration areas
L J PORTER
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
L J PORTER
03/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
L J PORTER
03/02/2026
Special inspection requirement — Final
L J PORTER
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
L J PORTER
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
L J PORTER
03/02/2026
Special inspection requirement — Air barrier - visual inspection
L J PORTER
02/03/2026
Filed — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-P2
02/03/2026
Objection raised — Cost
02/03/2026
Objection resolved — Addressed
11/18/2025
Signed off — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-S2
11/18/2025
Signed off — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-S1
08/05/2025
Permit issued — Plumbing
B00903733-I1-PL
05/01/2025
Permit issued — Foundation
B00903732-S2-FO
05/01/2025
Permit issued — Structural
B00903732-S1-ST
04/29/2025
Permit issued — General Construction
B00903732-I1-GC
04/15/2025
Violation issued (ECB, closed)
Construction
04/15/2025
Violation issued (ECB, closed)
Construction
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
L J PORTER
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
L J PORTER
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
L J PORTER
01/28/2025
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER ALTII #B00903732-I1. NO CHANGE IN USE , EGRESS, OR OCCUPANCY. REMOVAL OF GAS APPLICANCES AND BOILER.
B00903733-P2
10/18/2024
Filed — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-S2
10/18/2024
Filed — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-S1
10/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
10/11/2024
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
10/11/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
10/09/2024
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
10/09/2024
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
10/09/2024
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
10/03/2024
Special inspection requirement — Final
CONNIE PISANI
10/03/2024
Special inspection requirement — Footing and Foundation
CONNIE PISANI
10/03/2024
Special inspection requirement — Final
CONNIE PISANI
07/12/2024
Permit issued — General Construction
B00903732-I1-GC
07/10/2024
Permit issued — Plumbing
B00903733-I1-PL
06/27/2024
Filed — Alteration
PROPOSE REAR DECK RENOVATION IN CONJUNCTION WITH ARCH. DESIGN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00903732-P1
06/26/2024
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK FILED UNDER ALTII #B00903732-I1. NO CHANGE IN USE , EGRESS, OR OCCUPANCY. REMOVAL OF GAS APPLICANCES AND BOILER.
B00903733-P1
06/18/2024
Special inspection requirement — Energy Code Compliance Inspections
L J PORTER
06/18/2024
Special inspection requirement — Final
L J PORTER
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
L J PORTER
06/18/2024
Special inspection requirement — Fenestration areas
L J PORTER
06/18/2024
Special inspection requirement — Insulation placement and R values
L J PORTER
06/18/2024
Special inspection requirement — Fenestration air leakage
L J PORTER
02/01/2024
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/23/2023
Objection raised — Cost
10/18/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Admin
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection resolved — Addressed
09/11/2023
Objection raised — Energy
09/11/2023
Objection raised — Other
09/11/2023
Objection raised — Scope
09/07/2023
Objection resolved — Addressed
09/07/2023
Objection resolved — Addressed
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP08/05/2025
DOB NOWFoundationSigned-offACARA CONSTRUCTION INC05/01/2025
DOB NOWStructuralSigned-offACARA CONSTRUCTION INC05/01/2025
DOB NOWGeneral ConstructionPermit IssuedACARA CONSTRUCTION INC04/29/2025
DOB NOWGeneral ConstructionPermit IssuedACARA CONSTRUCTION INC07/12/2024
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP07/10/2024
1 project · most recent 01/28/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/28/2025Permit IssuedR.J.C. MECHANICAL CORPGas, Water/Sanitary
1 project · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026Permit IssuedHV ELECTRIC CORPGeneral Wiring
1 project · most recent 02/03/2026
Steel Wood
FiledStatusContractorScope
02/03/2026Signed-offACARA CONSTRUCTION INCSteel, Wood
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/02/2026Insulation placement and R valuesL J PORTERenergy_progress
03/02/2026Fenestration air leakageL J PORTERenergy_progress
03/02/2026Interior lighting powerL J PORTERenergy_progress
03/02/2026Fenestration areasL J PORTERenergy_progress
03/02/2026Fire-Resistant Penetrations and JointsL J PORTERspecial
03/02/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
03/02/2026Fire-Resistance Rated ConstructionL J PORTERprogress
03/02/2026FinalL J PORTERprogress
03/02/2026Energy Code Compliance InspectionsL J PORTERprogress
03/02/2026Fenestration and door U-factor and product ratingsL J PORTERenergy_progress
03/02/2026Air barrier - visual inspectionL J PORTERenergy_progress
02/03/2025HVAC-R and service water piping design and insulationL J PORTERenergy_progress
02/03/2025Energy Code Compliance InspectionsL J PORTERprogress
02/03/2025Fire-Resistant Penetrations and JointsL J PORTERspecial
10/11/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
10/11/2024Concrete - Cast-In-PlaceCONNIE PISANIspecial
10/11/2024Post-installed AnchorsCONNIE PISANIspecial
10/09/2024Structural Steel - DetailsCONNIE PISANIspecial
10/09/2024Structural Wood FrameCONNIE PISANIprogress
10/09/2024Post-installed AnchorsCONNIE PISANIspecial
10/09/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
10/03/2024FinalCONNIE PISANIprogress
10/03/2024Footing and FoundationCONNIE PISANIprogress
10/03/2024FinalCONNIE PISANIprogress
06/18/2024Energy Code Compliance InspectionsL J PORTERprogress
Latest 25 of 38.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026B00903732-P2Request digital key ↗
08/24/2026B00903732-S2Request digital key ↗
08/24/2026B00903732-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026B00903732-P1Open ↗
09/01/2026B00903732-P1Open ↗
09/01/2026B00903732-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B00903732-I1Open ↗
08/24/2026B00903732-P2Open ↗
08/24/2026B00903732-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00903732-S1Open ↗
08/28/2026B00903733-I1Open ↗
08/28/2026B00903732-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B00903732-P2Open ↗
08/24/2026B00903732-S2Open ↗
08/24/2026B00903732-S1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00903732-S2Open ↗