← Back
Four families
28 4 PLACE
BROOKLYN · BIN 3005464
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R6BZoning
2,646 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Four families · 2,100 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction6p · 2 filings · 15 docs
Floor 2Under Construction7p · 2 filings · 12 docs
Floor 1Under Construction8p · 2 filings · 16 docs
CellarUnder Construction7p · 2 filings · 16 docs
Sub-BasementUnder Construction4p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASUR MANAGEMENT MAINTENCE1309/16/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRASSO-MENZIUSO ARCHITECTS808/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CASUR CONTRACTING INCGeneral Contractor509/16/2026
INFINITI ESC PLUMBING CORPlumbing408/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRASSO-MENZIUSO ARCHITECT1279808/10/2026
ASE ENGINEERING PLLC5785106/10/2026
Building Lifecycle
All (54)Filed (8)Permit Issued (9)Violation (6)Objection (5)Special Inspection (26)
09/15/2026
Permit issued — General Construction
B01452358-I1-GC
08/19/2026
Permit issued — General Construction
B01443363-I1-GC
08/19/2026
Permit issued — General Construction
B01413669-I1-GC
08/18/2026
Permit issued — Plumbing
B01443363-S1-PL
08/18/2026
Permit issued — Plumbing
B01436651-S1-PL
08/10/2026
Filed — Alteration
relocate and new plumbing fixtures on the 3rd floor. No Change to use , egress or bulk
B01443363-I1
08/10/2026
Filed — Alteration
relocate and new plumbing fixtures on the 3rd floor. No Change to use , egress or bulk
B01443363-S1
08/10/2026
Permit issued — General Construction
B01436651-I1-GC
08/10/2026
Special inspection requirement — Final
Christopher Menziuso
08/10/2026
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
08/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
08/07/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Other
08/05/2026
Permit issued — Plumbing
B01413669-S1-PL
08/05/2026
Permit issued — Plumbing
B01414276-S1-PL
07/28/2026
Filed — Alteration
relocate and new plumbing fixtures on the 2nd floor. No Change to use , egress or bulk
B01436651-S1
07/27/2026
Filed — Alteration
relocate and new plumbing fixtures on the 2nd floor. No Change to use , egress or bulk
B01436651-I1
07/27/2026
Permit issued — Structural
B01414276-I1-GC-CX
07/26/2026
Objection resolved — Addressed
07/22/2026
Objection raised — Other
07/08/2026
Filed — Alteration
relocate and new plumbing fixtures on the 1st floor. No Change to use , egress or bulk
B01413669-I1
07/08/2026
Filed — Alteration
relocate and new plumbing fixtures on the 1st floor. No Change to use , egress or bulk
B01413669-S1
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
07/08/2026
Special inspection requirement — Fenestration air leakage
Christopher Menziuso
07/08/2026
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
07/08/2026
Special inspection requirement — Air barrier - visual inspection
Christopher Menziuso
07/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Menziuso
06/30/2026
Objection raised — Other
06/30/2026
Special inspection requirement — Final
Christopher Menziuso
06/11/2026
Filed — Alteration
MINOR PARTITION WORK WITH GENERAL CARPENTRY IN APT B IN CONNECTION WITH LOWER-LEVEL ACCESSORY USE ROOM. NO CHANGE TO USE OR BULK.
B01414276-S1
06/10/2026
Filed — Alteration
MINOR PARTITION WORK WITH GENERAL CARPENTRY IN APT B IN CONNECTION WITH LOWER-LEVEL ACCESSORY USE ROOM. NO CHANGE TO USE OR BULK.
B01414276-I1
06/10/2026
Special inspection requirement — Fenestration air leakage
Christopher Menziuso
06/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Menziuso
06/10/2026
Special inspection requirement — Fenestration areas
Christopher Menziuso
06/09/2026
Special inspection requirement — Wood – Seismic Resistance
alon egozi
06/09/2026
Special inspection requirement — Final
Christopher Menziuso
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Menziuso
06/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Menziuso
06/09/2026
Special inspection requirement — Interior lighting power
Christopher Menziuso
06/09/2026
Special inspection requirement — Lighting in dwelling units
Christopher Menziuso
06/09/2026
Special inspection requirement — Lighting controls
Christopher Menziuso
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Menziuso
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Menziuso
04/30/2026
Violation issued (HPD, open)
A
06/05/2025
Violation issued (HPD, open)
A
04/03/2024
Violation issued (HPD, open)
A
03/17/2023
Violation issued (HPD, open)
A
02/18/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCASUR CONTRACTING INC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedCASUR CONTRACTING INC08/19/2026
DOB NOWGeneral ConstructionPermit IssuedCASUR CONTRACTING INC08/19/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/18/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/18/2026
DOB NOWGeneral ConstructionPermit IssuedCASUR CONTRACTING INC08/10/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/05/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR08/05/2026
DOB NOWStructuralPermit IssuedCASUR CONTRACTING INC07/27/2026
4 projects · most recent 08/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/10/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
07/28/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
07/08/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
06/11/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 project · most recent 06/11/2026
Wood
FiledStatusContractorScope
06/11/2026Permit IssuedINFINITI ESC PLUMBING CORWood
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/10/2026FinalChristopher Menziusoprogress
08/10/2026Lighting in dwelling unitsChristopher Menziusoenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
08/10/2026Energy Code Compliance InspectionsChristopher Menziusoprogress
08/10/2026Fire-Resistance Rated ConstructionChristopher Menziusoprogress
07/08/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
07/08/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
07/08/2026Energy Code Compliance InspectionsChristopher Menziusoprogress
07/08/2026Fire-Resistance Rated ConstructionChristopher Menziusoprogress
07/08/2026Fenestration air leakageChristopher Menziusoenergy_progress
07/08/2026Lighting in dwelling unitsChristopher Menziusoenergy_progress
07/08/2026Air barrier - visual inspectionChristopher Menziusoenergy_progress
07/08/2026Fenestration and door U-factor and product ratingsChristopher Menziusoenergy_progress
06/30/2026FinalChristopher Menziusoprogress
06/10/2026Fenestration air leakageChristopher Menziusoenergy_progress
06/10/2026Fenestration and door U-factor and product ratingsChristopher Menziusoenergy_progress
06/10/2026Fenestration areasChristopher Menziusoenergy_progress
06/09/2026Wood – Seismic Resistancealon egozispecial
06/09/2026FinalChristopher Menziusoprogress
06/09/2026Energy Code Compliance InspectionsChristopher Menziusoprogress
06/09/2026Fire-Resistance Rated ConstructionChristopher Menziusoprogress
06/09/2026Interior lighting powerChristopher Menziusoenergy_progress
06/09/2026Lighting in dwelling unitsChristopher Menziusoenergy_progress
06/09/2026Lighting controlsChristopher Menziusoenergy_progress
06/09/2026Fire-Resistant Penetrations and JointsChristopher Menziusospecial
Latest 25 of 26.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/16/2026B01414276-S1Request digital key ↗
08/16/2026B01436651-S1Request digital key ↗
08/16/2026B01436651-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026B01414276-S1Open ↗
08/16/2026B01414276-I1Open ↗
08/16/2026B01413669-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01443363-I1Open ↗
08/31/2026B01414276-I1Open ↗
08/31/2026B01414276-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01443363-I1Open ↗
08/31/2026B01414276-I1Open ↗
08/31/2026B01414276-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/16/2026B01414276-S1Open ↗
08/16/2026B01436651-I1Open ↗
08/16/2026B01436651-S1Open ↗
Showing 3 of 8 on file for this type