← Back
Three families
86 4 PLACE
BROOKLYN · BIN 3005510
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
Architecture
Cellar3p · 2 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAYMOND NERENBERG PE110/01/2023
KELLEY DESIGN201/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROGENY MANAGEMENT & EXPEDITING SER403/21/2026
KELLEY DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROGO BUILDERS INCGeneral Contractor303/21/2026
CURRENT MECHS ELEC CONTSElectrical103/22/2026
AIRCON HTNG & COOLING CORGeneral Contractor107/08/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMHAC4867110/01/2023
ERIK SUN, ARCHITECT, PLLC3010101/04/2023
Building Lifecycle
All (31)Filed (3)Permit Issued (3)Signed Off (3)Violation (7)Inspection (4)Objection (8)Special Inspection (3)
04/30/2026
Violation issued (HPD, closed)
A
06/11/2024
Signed off — Alteration
Installation of new split air conditioning unit with associated ductwork. No change of use, egress, or occupancy.
B08033372-I1
06/11/2024
Signed off — Alteration
Apt. 1: Relo of KIT and BR in basement, reno BR and add of washer on the first floor, Apt. 2: Install kitchen and add washer on the second floor. Cap (2) gas ranges, basement and third floor. CELLAR Rem 1 HWH and install 2 gas HWH. Rem 1 gas meter.
B08033376-I1
06/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2024
Signed off — Alteration
Installation of new split air conditioning unit with associated ductwork. No change of use, egress, or occupancy.
B08033372-S1
11/22/2023
Violation issued (HPD, closed)
I
11/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2023
Permit issued — Mechanical Systems
B08033372-S1-MS
10/01/2023
Filed — Alteration
Installation of new split air conditioning unit with associated ductwork. No change of use, egress, or occupancy.
B08033372-S1
09/15/2023
Permit issued — Plumbing
B08033376-I1-PL
08/30/2023
Permit issued — General Construction
B08033372-I1-GC
03/17/2023
Violation issued (HPD, closed)
A
01/30/2023
Objection resolved — Addressed
01/18/2023
Objection raised — Other
01/17/2023
Objection raised — Other
01/17/2023
Objection resolved — Addressed
01/13/2023
Objection resolved — Addressed
01/13/2023
Objection resolved — Addressed
01/11/2023
Objection raised — Other
01/11/2023
Objection raised — Other
01/04/2023
Filed — Alteration
Installation of new split air conditioning unit with associated ductwork. No change of use, egress, or occupancy.
B08033372-I1
01/04/2023
Filed — Alteration
Apt. 1: Relo of KIT and BR in basement, reno BR and add of washer on the first floor, Apt. 2: Install kitchen and add washer on the second floor. Cap (2) gas ranges, basement and third floor. CELLAR Rem 1 HWH and install 2 gas HWH. Rem 1 gas meter.
B08033376-I1
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK SUN
12/15/2022
Special inspection requirement — Lighting in dwelling units
Beth Kelley
12/07/2022
Special inspection requirement — Final
Beth Kelley
11/14/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/12/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAIRCON HTNG COOLING COR10/27/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC09/15/2023
DOB NOWGeneral ConstructionSigned-offROGO BUILDERS INC08/30/2023
1 project · most recent 05/24/2024
General Wiring
FiledStatusContractorScope
05/24/2024CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/03/2023Fire-Resistant Penetrations and JointsERIK SUNspecial
12/15/2022Lighting in dwelling unitsBeth Kelleyenergy_progress
12/07/2022FinalBeth Kelleyprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B08033372-S1Request digital key ↗
08/15/2026B08033372-I1Request digital key ↗
08/14/2026B08033376-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B08033376-I1Open ↗
08/26/2026B08033372-I1Open ↗
08/26/2026B08033372-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B08033372-I1Open ↗
09/01/2026B08033372-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B08033372-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B08033372-S1Open ↗
08/15/2026B08033372-I1Open ↗
08/14/2026B08033376-I1Open ↗