General warehouse
334 DOUGLASS STREET
BROOKLYN · BIN 3006804
💬 Discuss this project
1940Year Built
1Stories
E1Building Class
C4-4DZoning
2,520 sfGross Floor Area
2Units
General warehouse · Owner of record: CDP DOUGLASS LLC · 2,520 sf lot · 1 FAR built · Flood zone X
Locations of Work
Architecture
Bulkhead1p · 1 filing · 4 docs
Floor 81p · 1 filing · 4 docs
Floor 71p · 1 filing · 4 docs
Floor 61p · 1 filing · 4 docs
Floor 52p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 4 docs
1 job · most recent 09/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2026——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRUM060GSS0 67,000 BTU · Vrf Outdoor ×1
ZRUN024GSS0 27,000 BTU · Vrf Outdoor ×1
1 job · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026——Sprinkler System
1 job · most recent 09/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/10/2026——Gas, Storm, Water/Sanitary
1 job · most recent 09/10/2026
Concrete
FiledStatusContractorScope
09/10/2026——Concrete
Building Lifecycle
All (38)Filed (3)Permit Issued (2)Signed Off (1)Objection (3)Special Inspection (29)
09/10/2026
Filed — New Building
Underpinning of adjacent building in conjunction with New Building
B01450706-S4
09/08/2026
Special inspection requirement — Lighting in dwelling units
09/08/2026
Special inspection requirement — Mechanical Systems
09/08/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
09/08/2026
Special inspection requirement — Final
09/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
09/08/2026
Special inspection requirement — Lighting controls
09/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/08/2026
Special inspection requirement — Exterior lighting power
09/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/08/2026
Special inspection requirement — Interior lighting power
09/08/2026
Special inspection requirement — Maintenance information
09/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/08/2026
Special inspection requirement — Shutoff dampers
09/08/2026
Special inspection requirement — Metering
08/12/2026
Special inspection requirement — Protection of exposed foundation insulation
08/12/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/12/2026
Special inspection requirement — Fenestration air leakage
08/12/2026
Special inspection requirement — Air barrier — testing
08/12/2026
Special inspection requirement — Fenestration areas
08/12/2026
Special inspection requirement — Insulation placement and R values
08/12/2026
Special inspection requirement — Air barrier - visual inspection
05/05/2025
Signed off — Alteration
TEMPORARY STRAP BRACING FOR ONE STORY BUILDING.
B00965930-I1
12/09/2024
Permit issued — Structural
B00965930-I1-ST
03/14/2024
Objection raised — Other
02/27/2024
Filed — New Building
FILING FOR NEW BUILDING MIXED USE (RESIDENTIAL AND COMMERCIAL)
B01000695-I1
02/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/08/2023
Permit issued — Structural
B00965930-I1-ST
12/04/2023
Objection resolved — Addressed
11/28/2023
Objection raised — Other
11/22/2023
Filed — Alteration
TEMPORARY STRAP BRACING FOR ONE STORY BUILDING.
B00965930-I1
11/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
11/21/2023
Special inspection requirement — Final
Soorjbally Harilall
11/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHLAND STREET CAPITAL209/15/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2014$1.5M—GABA-SMITH HOLDING, LLC → CDP DOUGLASS LLC$595/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOROZOV109/10/2026
FUTURE MADE ARCHITECTURE, PLLC102/27/2024
YORK TOWER CONSULTING ENGINEERING111/22/2023
JOHN SUNWOO1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.203/21/2026
WILLIAM VITACCO ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARTIMUS LLCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168111/22/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offARTIMUS LLC12/09/2024
DOB NOWStructuralSigned-offARTIMUS LLC12/08/2023
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/08/2026Lighting in dwelling units—energy_progress
09/08/2026Mechanical Systems—special
09/08/2026Emergency and Standby Power Systems (Generator)—special
09/08/2026Final—progress
09/08/2026Duct leakage testing, insulation and design—energy_progress
09/08/2026Lighting controls—energy_progress
09/08/2026HVAC-R and service water heating equipment—energy_progress
09/08/2026Exterior lighting power—energy_progress
09/08/2026HVAC-R and service water heating system controls—energy_progress
09/08/2026Interior lighting power—energy_progress
09/08/2026Maintenance information—energy_progress
09/08/2026HVAC-R and service water piping design and insulation—energy_progress
09/08/2026Shutoff dampers—energy_progress
09/08/2026Metering—energy_progress
08/12/2026Protection of exposed foundation insulation—energy_progress
08/12/2026Exterior Insulation and Finish Systems (EIFS)—special
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Fire-Resistance Rated Construction—progress
08/12/2026Fenestration and door U-factor and product ratings—energy_progress
08/12/2026Fenestration air leakage—energy_progress
08/12/2026Air barrier — testing —energy_progress
08/12/2026Fenestration areas—energy_progress
08/12/2026Insulation placement and R values—energy_progress
08/12/2026Air barrier - visual inspection—energy_progress
02/21/2024Fire-Resistance Rated Construction—progress
Latest 25 of 29.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/15/2026B01450706-S4Request digital key ↗
09/15/2026B01450706-S5Request digital key ↗
09/15/2026B01450706-S6Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
09/15/2026B01450706-I1Open ↗
08/13/2026B01000695-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/15/2026B01450706-S6Open ↗
09/15/2026B01450706-S4Open ↗
09/15/2026B01450706-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00965930-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00965930-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
09/15/2026B01450706-I1Open ↗
09/03/2026B01444498-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00965930-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial3
09/15/2026B01450706-I1Open ↗
09/03/2026B01444498-I1Open ↗
08/13/2026B01000695-I1Open ↗
▸DOB NOWProperty Ownership Certification2
09/15/2026B01450706-I1Open ↗
09/03/2026B01444498-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
09/15/2026B01450706-I1Open ↗
09/03/2026B01444498-I1Open ↗