← Back
Primarily 2 family with 1 store or office
311 COURT STREET
BROOKLYN · BIN 3006818
💬 Discuss this project
1900Year Built
3Stories
S2Building Class
R6AZoning
3,370 sfGross Floor Area
3Units
2 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: 311 COURT LLC · 1,544 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof2p · 1 filing · 12 docs
Floor 21p · 1 filing · 12 docs
Floor 13p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2023$2.5M—— → —$742/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OPERA STUDIO ARCHITECTURE, LLC411/02/2023
S M TAM ARCHITECT, PLLC305/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HENRYSMITH PROPERTY MGMTGeneral Contractor403/21/2026
EAST COAST ENVIRONMENTALGeneral Contractor207/08/2026
GS CONSTRUCTION GROUP INCGeneral Contractor104/09/2026
ADAM ELECL CONTRNG LLCElectrical103/22/2026
ALTAIR PLUMBING AND HEATPlumbing107/08/2026
CONTROL PLBG & HTG INCPlumbing107/08/2026
MMI PLUMBING & HEATING INC.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827111/02/2023
GLOBAL ARCH DESIGN & BUIL3397305/01/2023
OPERA STUDIO ARCHITECTURE5970202/23/2023
Building Lifecycle
All (68)Filed (7)Permit Issued (8)Signed Off (7)Violation (4)Inspection (5)Objection (18)Special Inspection (19)
03/02/2026
Signed off — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-I1
03/02/2026
Signed off — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-S2
12/12/2025
Signed off — Alteration
B00953466-I1
01/27/2025
Permit issued — General Construction
B00953466-I1-GC-CX
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2024
Signed off — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-S1
06/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2024
Permit issued — Plumbing
B00825590-S1-PL
11/02/2023
Filed — Alteration
B00953466-I1
09/15/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-S1
09/15/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-I1
08/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-S2
07/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/01/2023
Permit issued — Plumbing
B00825590-S1-PL
05/23/2023
Permit issued — General Construction
B00825590-I1-GC
05/18/2023
Permit issued — Mechanical Systems
B00825590-S2-MS
05/18/2023
Permit issued — Plumbing
B00861424-S2-PL
05/17/2023
Permit issued — Mechanical Systems
B00861424-S1-MS
05/08/2023
Special inspection requirement — Ventilation and air distribution system
NITHIN JOHN
05/06/2023
Permit issued — General Construction
B00861424-I1-GC
05/05/2023
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
NITHIN JOHN
05/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
05/05/2023
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
NITHIN JOHN
05/04/2023
Objection raised — Mechanical
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Inspections
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Energy
05/04/2023
Objection resolved — Addressed
05/04/2023
Objection raised — Scope
05/04/2023
Objection resolved — Addressed
05/01/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-S1
05/01/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-S2
04/28/2023
Objection resolved — Addressed
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection resolved — Addressed
04/26/2023
Objection raised — Other
04/26/2023
Objection raised — Other
04/26/2023
Objection raised — Other
04/26/2023
Objection raised — Other
04/26/2023
Objection raised — Other
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
04/24/2023
Special inspection requirement — Final
NITHIN JOHN
04/24/2023
Special inspection requirement — Maintenance information
NITHIN JOHN
04/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
NITHIN JOHN
04/24/2023
Special inspection requirement — Mechanical Systems
NITHIN JOHN
04/21/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL 1ST FLOOR WITH MINOR PARTITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00861424-I1
02/23/2023
Filed — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-S2
02/23/2023
Filed — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-S1
02/21/2023
Filed — Alteration
Subsequent mechanical application to Install AC units, associated equip & Condensers for 2nd & 3rd floor units. No change to egress, occupancy or use.
B00825590-I1
02/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
02/08/2023
Special inspection requirement — Permanent certificate
Thomas Barry
02/08/2023
Special inspection requirement — Metering
Thomas Barry
02/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
02/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGS CONSTRUCTION GROUP INC01/27/2025
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH06/20/2024
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT06/01/2023
DOB NOWGeneral ConstructionSigned-offEAST COAST ENVIRONMENTAL05/23/2023
DOB NOWMechanical SystemsSigned-offEAST COAST ENVIRONMENTAL05/18/2023
DOB NOWPlumbingSigned-offCONTROL PLBG & HTG INC05/18/2023
DOB NOWMechanical SystemsSigned-offHENRYSMITH PROPERTY MGMT05/17/2023
DOB NOWGeneral ConstructionSigned-offHENRYSMITH PROPERTY MGMT05/06/2023
3 projects · most recent 02/24/2024
General Wiring
FiledStatusContractorScope
02/24/2024CompleteADAM ELECL CONTRNG LLC—
10/16/2023CompleteADAM ELECL CONTRNG LLC—
05/16/2023CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/08/2023Ventilation and air distribution systemNITHIN JOHNenergy_progress
05/05/2023Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsNITHIN JOHNspecial
05/05/2023Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
05/05/2023Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsNITHIN JOHNspecial
04/24/2023Energy Code Compliance InspectionsNITHIN JOHNprogress
04/24/2023FinalNITHIN JOHNprogress
04/24/2023Maintenance informationNITHIN JOHNenergy_progress
04/24/2023Duct leakage testing, insulation and designNITHIN JOHNenergy_progress
04/24/2023Mechanical SystemsNITHIN JOHNspecial
02/08/2023Fenestration and door U-factor and product ratingsThomas Barryenergy_progress
02/08/2023Permanent certificateThomas Barryenergy_progress
02/08/2023MeteringThomas Barryenergy_progress
02/08/2023Fire-Resistant Penetrations and JointsThomas Barryspecial
02/08/2023Energy Code Compliance InspectionsThomas Barryprogress
02/08/2023FinalThomas Barryprogress
02/08/2023Fire-Resistance Rated ConstructionThomas Barryprogress
02/08/2023Insulation placement and R valuesThomas Barryenergy_progress
02/08/2023Fenestration areasThomas Barryenergy_progress
02/08/2023Fenestration air leakageThomas Barryenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00825590-S2Request digital key ↗
08/27/2026B00825590-I1Request digital key ↗
08/27/2026B00825590-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00861424-S1Open ↗
08/27/2026B00861424-S2Open ↗
08/27/2026B00861424-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026B00825590-I1Open ↗
08/23/2026B00825590-I1Open ↗
08/23/2026B00861424-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00861424-S2Open ↗
08/23/2026B00825590-I1Open ↗
08/23/2026B00861424-S1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00861424-S2Open ↗
08/27/2026B00861424-I1Open ↗
08/26/2026B00953466-I1Open ↗
Showing 3 of 7 on file for this type