Primarily 3 family with 1 store or office
347 COURT STREET
BROOKLYN · BIN 3007222
💬 Discuss this project
1931Year Built
4Stories
S3Building Class
R6AZoning
3,600 sfGross Floor Area
4Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · 1,000 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS409/23/2025
KONOSKI ENGINEERING PLLC106/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE VENTURES TEAMGeneral Contractor507/08/2026
ANTHONY MATRONEElectrical103/21/2026
MATRONE ANTHONYElectrical103/21/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544409/23/2025
KONOSKI ENGINEERING PLLC9111106/08/2025
Building Lifecycle
All (72)Filed (5)Permit Issued (4)Signed Off (1)Violation (21)Inspection (5)Objection (8)Special Inspection (28)
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/23/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MAKEUP AIR SYSTEM FOR NEW COMMERCIAL KITCHEN AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01203318-I1
B01203318-P1
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/25/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION INCLUDING ONLY THE REMOVAL OF DECORATIVE FINISHES AND MILLWORK. NO DISTURBANCE OF EXISTING FIRE RATED ASSEMBLIES UNDER THIS APPLICATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01203248-I1
07/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2025
Permit issued — Mechanical Systems
B01203318-S2-MS
06/20/2025
Permit issued — Plumbing
B01203318-S1-PL
06/08/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MAKEUP AIR SYSTEM FOR NEW COMMERCIAL KITCHEN AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01203318-I1
B01203318-S2
06/03/2025
Permit issued — General Construction
B01203318-I1-GC
05/29/2025
Permit issued — General Construction
B01203248-I1-GC
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Other
05/22/2025
Objection raised — Other
05/22/2025
Objection raised — Other
05/22/2025
Objection raised — Other
05/19/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MAKEUP AIR SYSTEM FOR NEW COMMERCIAL KITCHEN AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01203318-I1
B01203318-S1
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
christopher konoski
05/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
christopher konoski
05/19/2025
Special inspection requirement — Ventilation and air distribution system
christopher konoski
05/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
christopher konoski
05/19/2025
Special inspection requirement — Shutoff dampers
christopher konoski
05/19/2025
Special inspection requirement — Maintenance information
christopher konoski
05/08/2025
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MAKEUP AIR SYSTEM FOR NEW COMMERCIAL KITCHEN AT THE 1ST FLOOR AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01203318-I1
B01203318-I1
04/23/2025
Special inspection requirement — Exterior lighting power
EUGENE BIFULCO
04/23/2025
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
04/23/2025
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
04/23/2025
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
04/04/2025
Filed — Alteration
MINOR INTERIOR RENOVATION INCLUDING ONLY THE REMOVAL OF DECORATIVE FINISHES AND MILLWORK. NO DISTURBANCE OF EXISTING FIRE RATED ASSEMBLIES UNDER THIS APPLICATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01203248-I1
03/31/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Mechanical Systems
christopher konoski
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
christopher konoski
03/31/2025
Special inspection requirement — Final
christopher konoski
03/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Final
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
03/31/2025
Special inspection requirement — Final
EUGENE BIFULCO
01/24/2024
Violation issued (ECB, closed)
Construction
11/14/2022
Violation issued (HPD, closed)
I
11/10/2020
Violation issued (FDNY_ORDER, closed)
11/10/2020
Violation issued (FDNY_ORDER, closed)
04/19/2018
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2018
Violation issued (ECB, closed)
Construction
03/06/2018
Violation issued (ECB, closed)
Construction
03/06/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedINNOVATIVE VENTURES TEAM07/01/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP06/20/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM06/03/2025
DOB NOWGeneral ConstructionSigned-offINNOVATIVE VENTURES TEAM05/29/2025
BISMHISSUEDJ. AND F. REFRIGERATION,*02/11/2009
BISPLISSUEDSTARLITE PLBG & HTG CORP08/07/2007
BISOTISSUEDGAB-CO DESIGN GROUP INC07/23/2007
BISMHISSUEDCAPEZZANO CONSTRUCTION01/30/2003
BISPLISSUEDJ.E.S. PLBG & HTG CORP04/11/2001
BISOTISSUEDAMERICAN WATERPROOFING COM.& GC03/01/2001
1 project · most recent 09/23/2025
Ventilation Systems
FiledStatusContractorScope
09/23/2025Permit IssuedINNOVATIVE VENTURES TEAMVentilation Systems
1 project · most recent 09/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/23/2025Signed-offARANDA PLBG & HTG CORPGas, Water/Sanitary
2 projects · most recent 04/17/2026
General Wiring
FiledStatusContractorScope
04/17/2026CompleteASSET ELECTRIC CORPGeneral Wiring
05/30/2025Permit IssuedOSTRAVA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/29/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/29/2025Tenant Protection Plan Compliance—special
09/09/2025Tenant Protection Plan Compliance—special
09/09/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/19/2025HVAC-R and service water piping design and insulationchristopher konoskienergy_progress
05/19/2025HVAC-R and service water heating equipmentchristopher konoskienergy_progress
05/19/2025Ventilation and air distribution systemchristopher konoskienergy_progress
05/19/2025HVAC-R and service water heating system controlschristopher konoskienergy_progress
05/19/2025Shutoff damperschristopher konoskienergy_progress
05/19/2025Maintenance informationchristopher konoskienergy_progress
04/23/2025Exterior lighting powerEUGENE BIFULCOenergy_progress
04/23/2025Fenestration areasEUGENE BIFULCOenergy_progress
04/23/2025Fenestration air leakageEUGENE BIFULCOenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
04/23/2025Insulation placement and R valuesEUGENE BIFULCOenergy_progress
03/31/2025Lighting controlsEUGENE BIFULCOenergy_progress
03/31/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
03/31/2025Interior lighting powerEUGENE BIFULCOenergy_progress
03/31/2025Mechanical Systemschristopher konoskispecial
03/31/2025Fire-Resistant Penetrations and Jointschristopher konoskispecial
03/31/2025Tenant Protection Plan Compliancechristopher konoskispecial
03/31/2025Finalchristopher konoskiprogress
03/31/2025Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/31/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/31/2025FinalEUGENE BIFULCOprogress
Latest 25 of 28.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01203318-P1Request digital key ↗
08/20/2026B01203318-S2Request digital key ↗
08/20/2026B01203318-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
02/11/2009310296202Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/30/2009310296202Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01203318-P2Open ↗
09/01/2026B01203318-S2Open ↗
09/01/2026B01203318-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01203318-P1Open ↗
08/20/2026B01203318-S2Open ↗
08/20/2026B01203318-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01203318-P2Open ↗
09/01/2026B01203318-S2Open ↗
08/25/2026B01203318-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/23/2009310296202Open ↗
02/11/2009310296202Open ↗
01/30/2009310296202Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/27/2009310296202Open ↗
▸BISEQUIPMENT USE PERMITS1
03/03/2009310296202Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/30/2009310296202Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B01203318-P1Open ↗
08/20/2026B01203318-S2Open ↗
08/20/2026B01203318-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/30/2009310296202Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/27/2009310296202Open ↗
02/23/2009310296202Open ↗
02/18/2009310296202Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/30/2009310296202Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/18/2009310296202Open ↗
01/30/2009310296202Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/30/2009310296202Open ↗