← Back
BROOKLYN
281 3RD AVE
BROOKLYN · BIN 3007518
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸
Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
281 3RD AVE, LLC1907/08/2026
281 3RD AVE LLC LEPARC PR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.807/09/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing207/08/2026
SHUN SHENG CONSTRUCTIONGeneral Contractor107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669607/09/2022
Building Lifecycle
All (49)Filed (8)Permit Issued (5)Signed Off (5)Violation (6)Inspection (3)Special Inspection (22)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2022
Signed off — Alteration
REPLACE HOT WATER HEATER ON CELLAR. ADDRESS VIOLATION 39044502H.
B00592239-I1
07/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2022
Special inspection requirement — Maintenance information
ZHENHUAN XU
07/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
07/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
07/11/2022
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
07/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
07/09/2022
Filed — Alteration
REPLACE HOT WATER HEATER ON CELLAR. ADDRESS VIOLATION 39044502H.
B00592239-P2
05/31/2022
Signed off — Alteration
Register the existing boiler and address the violation 39044502H
B00601934-I1
05/12/2022
Filed — Alteration
Register the existing boiler and address the violation 39044502H
B00601934-P1
05/09/2022
Special inspection requirement — Maintenance information
ZHENHUAN XU
05/06/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/12/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/16/2022
Violation issued (HPD, closed)
I
02/09/2022
Signed off — Alteration
INTERIOR RENOVATION ON THE CELLAR. ADDRESS VIOLATION 39044502H. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00598066-I1
11/10/2021
Filed — Alteration
REPLACE HOT WATER HEATER ON CELLAR. ADDRESS VIOLATION 39044502H.
B00592239-P1
10/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
10/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
10/29/2021
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
10/29/2021
Special inspection requirement — Maintenance information
ZHENHUAN XU
10/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
10/14/2021
Permit issued — Plumbing
B00592239-I1-PL
10/13/2021
Permit issued — Boiler Equipment
B00601934-I1-BE
10/08/2021
Permit issued — General Construction
B00598066-I1-GC
10/04/2021
Filed — Alteration
Register the existing boiler and address the violation 39044502H
B00601934-I1
10/04/2021
Filed — Alteration
INTERIOR RENOVATION ON THE CELLAR. ADDRESS VIOLATION 39044502H. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00598066-I1
10/01/2021
Filed — Alteration
REPLACE HOT WATER HEATER ON CELLAR. ADDRESS VIOLATION 39044502H.
B00592239-I1
07/15/2021
Violation issued (ECB, closed)
Boilers
02/02/2021
Signed off — Alteration
ADD A VENTILATION SYSTEM FOR THE NAIL STORE
B00429932-I1
02/02/2021
Signed off — Alteration
ADD NEW SINKS AND A LAVA; REPLACE A LAVA AND A TOILET
B00428312-I1
01/15/2021
Permit issued — Mechanical Systems
B00429932-I1-MS
01/14/2021
Filed — Alteration
ADD A VENTILATION SYSTEM FOR THE NAIL STORE
B00429932-I1
01/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/12/2021
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
12/03/2020
Permit issued — Plumbing
B00428312-I1-PL
11/22/2020
Filed — Alteration
ADD NEW SINKS AND A LAVA; REPLACE A LAVA AND A TOILET
B00428312-I1
11/22/2020
Special inspection requirement — HVAC insulation and sealing
ZHENHUAN XU
11/22/2020
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
11/22/2020
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
11/22/2020
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
11/22/2020
Special inspection requirement — Duct leakage testing
ZHENHUAN XU
11/18/2020
Special inspection requirement — Final
ZHENHUAN XU
11/18/2020
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
11/14/2020
Special inspection requirement — Maintenance information
ZHENHUAN XU
11/14/2020
Special inspection requirement — High Temperature Hot Water Piping (Welding)
ZHENHUAN XU
07/08/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/14/2021
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC10/13/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC10/08/2021
DOB NOWMechanical SystemsSigned-offSHUN SHENG CONSTRUCTION01/15/2021
DOB NOWPlumbingSigned-offNICHOLAS SUIDA12/03/2020
BISOTISSUEDSHUN SHENG CONSTRUCTION11/20/2020
1 project · most recent 12/07/2025
FiledStatusContractorScope
12/07/2025CompleteMAR-KAM ELEC'L CONTR'G IN3 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/12/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/11/2022Maintenance informationZHENHUAN XUenergy_progress
07/11/2022HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
07/11/2022HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
07/11/2022Energy Code Compliance InspectionsZHENHUAN XUprogress
07/11/2022Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
05/09/2022Maintenance informationZHENHUAN XUenergy_progress
10/29/2021HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
10/29/2021Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/29/2021Energy Code Compliance InspectionsZHENHUAN XUprogress
10/29/2021Maintenance informationZHENHUAN XUenergy_progress
10/29/2021HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
01/12/2021Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/12/2021Fire-Resistance Rated ConstructionZHENHUAN XUprogress
11/22/2020HVAC insulation and sealing ZHENHUAN XUenergy_progress
11/22/2020Fire-Resistance Rated ConstructionZHENHUAN XUprogress
11/22/2020Energy Code Compliance InspectionsZHENHUAN XUprogress
11/22/2020Energy Code Compliance InspectionsZHENHUAN XUprogress
11/22/2020Duct leakage testing ZHENHUAN XUenergy_progress
11/18/2020FinalZHENHUAN XUprogress
11/18/2020Mechanical SystemsZHENHUAN XUspecial
11/14/2020Maintenance informationZHENHUAN XUenergy_progress
11/14/2020High Temperature Hot Water Piping (Welding)ZHENHUAN XUspecial
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/01/2026B00592239-I1Request digital key ↗
09/01/2026B00592239-P1Request digital key ↗
09/01/2026B00592239-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00429932-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00428312-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/18/2020340788026Open ↗
▸BISWORK PERMIT APPLICATION1
11/20/2020340788026Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature17
09/27/2026B00592239-I1Open ↗
09/27/2026B00592239-I1Open ↗
09/27/2026B00592239-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B00428312-I1Open ↗
08/13/2026B00601934-P1Open ↗
08/13/2026B00592239-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026B00592239-I1Open ↗
09/01/2026B00429932-I1Open ↗
09/01/2026B00429932-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2020340788026Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2020340788026Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2020340788026Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026B00429932-I1Open ↗
08/13/2026B00428312-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/18/2020340788026Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00428312-I1Open ↗
08/13/2026B00429932-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2020340788026Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026B00598066-I1Open ↗
08/13/2026B00429932-I1Open ↗
08/13/2026B00601934-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/06/2021340788026Open ↗
11/20/2020340788026Open ↗
11/18/2020340788026Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2020340788026Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/06/2021340788026Open ↗
▸BISNYCECC ANALYSIS1
11/18/2020340788026Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/06/2021340788026Open ↗
11/20/2020340788026Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/06/2021340788026Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/06/2021340788026Open ↗
11/18/2020340788026Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2020340788026Open ↗