← Back
General warehouse
53 SEABRING STREET
BROOKLYN · BIN 3008249
💬 Discuss this project
1939Year Built
1Stories
E1Building Class
M1-1Zoning
16,300 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
General warehouse · Owner of record: TOPCATCH 60 COMMERCE REALTY INC · 15,000 sf lot · 1.09 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Roof10p · 1 filing · 20 docs
Floor 114p · 2 filings · 20 docs
Mezzanine5p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPCATCH 60 COMMERCE REAL303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VILLA PEX CONSULTING ENGINEERING405/25/2023
MARTOS ENGINEERING106/14/2022
UNION STREET STUDIO, LLC106/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor407/08/2026
MILL BROOK FIRE PROTECTIONFire Protection207/08/2026
RAYMOND'S PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O'ROURKE ENGINEERING, LLC5873305/25/2023
STUDIO NYANDAK ARCHITECTU8378102/21/2023
SPECIAL TESTING & CONSULT1688206/14/2022
Building Lifecycle
All (54)Filed (6)Permit Issued (5)Signed Off (1)Violation (9)Inspection (9)Objection (24)
08/21/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/02/2026
Signed off — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-S2
11/03/2025
Violation issued (FDNY_NOV, closed)
10/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Permit issued — Sprinklers
B00711143-S2-EW-SP
10/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/08/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/17/2025
Violation issued (FDNY_NOV, closed)
07/17/2025
Violation issued (FDNY_NOV, closed)
12/24/2024
Violation issued (ECB, open)
Construction
11/16/2023
Violation issued (FDNY_NOV, closed)
11/16/2023
Violation issued (FDNY_NOV, closed)
09/11/2023
Permit issued — Sprinklers
B00711143-S2-EW-SP
06/22/2023
Objection raised — Other
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
05/25/2023
Filed — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-P2
05/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/12/2023
Objection raised — Other
04/12/2023
Objection resolved — Addressed
03/29/2023
Objection raised — Other
03/27/2023
Objection resolved — Addressed
02/25/2023
Objection raised — Structural
02/25/2023
Objection raised — Structural
02/25/2023
Objection raised — Structural
02/25/2023
Objection raised — Structural
02/21/2023
Filed — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-S2
02/06/2023
Objection resolved — Addressed
02/03/2023
Objection raised — Scope
02/01/2023
Filed — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-P1
01/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2022
Permit issued — Structural
B00711143-S1-ST
09/14/2022
Permit issued — General Construction
B00739651-I1-GC
07/25/2022
Objection resolved — Addressed
07/11/2022
Objection resolved — Addressed
06/23/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/21/2022
Objection resolved — Addressed
06/18/2022
Objection raised — Energy
06/18/2022
Objection raised — Inspections
06/14/2022
Filed — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-S1
06/14/2022
Permit issued — Plumbing
B00711143-I1-PL
06/10/2022
Objection raised — Zoning
06/02/2022
Filed — Alteration CO
CHANGE OF USE AND INTERIOR RENOVATION OF SPACE. ALL SUBSEQUENT APPLICATION WILL BE FILED SEPARATELY
B00739651-I1
05/31/2022
Objection resolved — Addressed
04/06/2022
Objection raised — Fire_Protection
04/04/2022
Filed — Alteration
Plumbing work associated with the tenant fit out for studio. No change in use, egress or occupancy
B00711143-I1
05/05/2021
Violation issued (ECB, closed)
Construction
05/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/03/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC10/08/2025
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC09/11/2023
DOB NOWStructuralPermit IssuedMKNK WASTE REMOVAL INC09/15/2022
DOB NOWGeneral ConstructionPermit IssuedMKNK WASTE REMOVAL INC09/14/2022
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC06/14/2022
BIS—ISSUEDJABCO CONSTRUCTION CORP06/17/1996
BISOTISSUEDLIQUID CARBONICS07/13/1995
BISPLRE-ISSUEDTHEODORE WAGNER PLUMBING & HEATI06/26/1995
BISPLISSUEDWADE PLG AND HTG03/02/1995
BIS—RE-ISSUEDJABCO CONSTRUCTION CORP02/21/1995
1 project · most recent 05/25/2023
FiledStatusContractorScope
05/25/2023Signed-offLEGUCI PIPING&HEATING LLC21 heads
1 project · most recent 05/25/2023
Water/Sanitary
FiledStatusContractorScope
05/25/2023Signed-offRAYMOND'S PLBG & HTG LLCWater/Sanitary
1 project · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023Permit IssuedPK ELECTRIC INCGeneral Wiring
1 project · most recent 05/25/2023
Steel Concrete Masonry Wood
FiledStatusContractorScope
05/25/2023Signed-offLEGUCI PIPING&HEATING LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/21/2026Fail-Final CND-Occupancy InspectionFailView ↗
10/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/31/2023HVAC-R and service water heating equipmentBRIAN O'ROURKEenergy_progress
05/31/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
05/24/2023HVAC-R and service water heating equipmentBRIAN O'ROURKEenergy_progress
05/24/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
01/30/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
01/30/2023HVAC-R and service water heating equipmentBRIAN O'ROURKEenergy_progress
06/21/2022Sprayed fire-resistant materialsSEBASTIAN SETTEDUCATE JR., P.Especial
06/14/2022Structural Wood FrameSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/14/2022Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/01/2022Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/01/2022Lighting controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/01/2022Mastic and Intumescent Fire-resistant CoatingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/01/2022Interior lighting powerSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/01/2022Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00711143-P2Request digital key ↗
08/15/2026B00711143-P1Request digital key ↗
08/15/2026B00711143-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00711143-I1Open ↗
08/27/2026B00711143-P1Open ↗
08/13/2026B00739651-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00711143-P1Open ↗
08/29/2026B00711143-I1Open ↗
08/28/2026B00739651-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00711143-P1Open ↗
08/29/2026B00711143-I1Open ↗
08/28/2026B00739651-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00739651-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00739651-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/15/2026B00711143-P1Open ↗
08/15/2026B00711143-I1Open ↗
08/13/2026B00739651-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B00739651-I1Open ↗