← Back
General warehouse
62 DELAVAN STREET
BROOKLYN · BIN 3008314
💬 Discuss this project
1920Year Built
1Stories
E1Building Class
M1-1Zoning
4,485 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: THE HOOK R.H.C., INC. · 10,000 sf lot · 0.45 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/20/2026
Sprinkler System
FiledStatusContractorScope
07/20/2026——Sprinkler System
2 jobs · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026——1 scope_items
04/17/2026——1 scope_items
Building Lifecycle
All (43)Filed (5)Violation (1)Objection (24)Special Inspection (13)
07/31/2026
Objection raised — Other
07/31/2026
Objection raised — Inspections
07/31/2026
Objection raised — Scope
07/20/2026
Filed — Alteration CO
Foundation work as shown on plans filed herewith. No change in use egress or occupancy.
B00979459-S5
05/08/2026
Objection raised — Other
05/05/2026
Objection raised — Other
05/05/2026
Objection raised — Other
05/05/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/17/2026
Filed — Alteration
BESS installation as shown on plans filed herewith. No change in use, egress, or occupancy. ALT GC-EESE filed in conjunction with ALT-CO application #B00979459-I1
B01294077-I1
01/22/2026
Objection resolved — Resolved
09/26/2025
Special inspection requirement — Final
11/21/2024
Violation issued (ECB, closed)
Construction
10/31/2024
Objection resolved — Resolved
10/17/2024
Objection resolved — Addressed
10/11/2024
Filed — Alteration CO
Foundation work as shown on plans filed herewith. No change in use egress or occupancy.
B00979459-S1
10/11/2024
Filed — Alteration CO
Foundation work as shown on plans filed herewith. No change in use egress or occupancy.
B00979459-S3
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
07/29/2024
Objection raised — Other
04/16/2024
Objection raised — Scope
04/03/2024
Filed — Alteration CO
Foundation work as shown on plans filed herewith. No change in use egress or occupancy.
B00979459-I1
02/29/2024
Special inspection requirement — Subgrade Inspections
02/29/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/29/2024
Special inspection requirement — Deep Foundation Elements
02/29/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/29/2024
Special inspection requirement — Final
02/29/2024
Special inspection requirement — Footing and Foundation
02/29/2024
Special inspection requirement — Concrete - Cast-In-Place
02/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
02/13/2024
Special inspection requirement — Structural Steel - Welding
02/13/2024
Special inspection requirement — Structural Steel - Details
02/13/2024
Special inspection requirement — Post-installed Anchors
12/19/2023
Special inspection requirement — Final
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUMMIT RIDGE ENERGY509/01/2026
THE HOOK R. H. C., INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECTONIC ENGINEERING107/20/2026
Tectonic Engineering Consultants, G404/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES603/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/26/2025Final—progress
02/29/2024Subgrade Inspections—special
02/29/2024Subsurface Conditions – Fill Placement & In-Place Density—special
02/29/2024Deep Foundation Elements—special
02/29/2024Subsurface Investigations (Borings/Test Pits)—special
02/29/2024Final—progress
02/29/2024Footing and Foundation—progress
02/29/2024Concrete - Cast-In-Place—special
02/13/2024Structural Steel - High Strength Bolting—special
02/13/2024Structural Steel - Welding—special
02/13/2024Structural Steel - Details—special
02/13/2024Post-installed Anchors—special
12/19/2023Final—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00979459-S4Request digital key ↗
08/25/2026B00979459-S1Request digital key ↗
08/25/2026B00979459-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B00979459-S3Open ↗
08/25/2026B00979459-I1Open ↗
08/25/2026B00979459-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00979459-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00979459-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00979459-S3Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026B00979459-I1Open ↗