← Back
Miscellaneous warehouse
685 COLUMBIA STREET
BROOKLYN · BIN 3008877
💬 Discuss this project
1921Year Built
8Stories
E9Building Class
M3-1Zoning
38,122 sfGross Floor Area
1Units
11 Open Violations ▸
Miscellaneous warehouse · Owner of record: GOWANUS INDUSTRIAL PARK INC · 1,981,175 sf lot · 0.02 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOWANUS INDUSTRIAL PARK INC103/22/2026
OWNER OF 685 COLUMBIA ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNC ARCHITECTURE P.C408/27/2026
RR ENGINEERING PLLC507/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCE PRESENTS LLCGeneral Contractor303/21/2026
WINICK PRODUCTIONS, LLCGeneral Contractor109/15/2026
Building Lifecycle
All (79)Filed (9)Permit Issued (2)Signed Off (1)Violation (14)Objection (51)Special Inspection (2)
09/14/2026
Permit issued — General Construction
B01448096-I1-GC
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
08/27/2026
Filed — Alteration
Temporary structures for an outdoor concert in the parking lot, Stink & Dutty. Removed at the end of the programing. No changes to existing structures, use or egress.
B01448096-I1
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Other
08/20/2026
Filed — No Work
B01447972-I1
08/19/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
07/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARTY MOBILE STAGE AND TENT
B01431770-I1
07/16/2026
Special inspection requirement — Final
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/13/2026
Filed — No Work
B01428948-I1
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/20/2026
Objection resolved — Resolved
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Other
05/02/2026
Filed — No Work
B01395798-I1
08/27/2025
Signed off — Alteration
B01226835-I1
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/22/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/20/2025
Objection raised — Admin
08/20/2025
Objection raised — Mechanical
08/20/2025
Objection raised — Structural
08/20/2025
Objection raised — Mechanical
08/20/2025
Objection raised — Fire_Protection
08/20/2025
Objection raised — Scope
08/20/2025
Objection raised — Mechanical
08/20/2025
Objection raised — Fire_Protection
08/20/2025
Objection raised — Structural
08/20/2025
Objection raised — Inspections
08/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY MOBILE STAGE
B01274181-I1
08/19/2025
Filed — No Work
B01268612-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC09/14/2026
DOB NOWGeneral ConstructionSigned-offTCE PRESENTS LLC05/24/2025
BISCCISSUEDAMSTEL RECYCLING & CONCRETE CORP04/01/1998
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/19/2026FinalANDY ENGLER ROTHprogress
07/16/2026Final—progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Temporary Place of Assembly5
08/21/2026B01447972-I1Request digital key ↗
08/21/2026B01226534-I1Request digital key ↗
08/15/2026B01268612-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch4
09/02/2026B01448096-I1Request digital key ↗
08/21/2026B01226835-I1Request digital key ↗
08/20/2026B01274181-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B01448096-I1Open ↗
08/21/2026B01447972-I1Open ↗
08/21/2026B01226534-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B01448096-I1Open ↗