240 24 STREET
BROOKLYN · BIN 3009576
💬 Discuss this project
1930Year Built
1Stories
G1Building Class
M1-2DZoning
1,140 sfGross Floor Area
1Units
0 Open Violations
All parking garages · Owner of record: 750 4TH AVENUE LLC · 1,142 sf lot · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 11/28/2023
FiledStatusContractorScope
11/28/2023CompleteQ.Y. ELECTRIC, INC1 meters, 1 new_meters
12/16/2020CompleteHIGH QUALITY ELECTRIC OF—
Building Lifecycle
All (56)Filed (7)Permit Issued (5)Signed Off (4)Violation (2)Inspection (5)Objection (22)Special Inspection (11)
04/08/2024
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-I1
02/21/2024
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-S2
12/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-P4
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
11/22/2023
Special inspection requirement — Final
JOHN MALVASIO
11/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
11/22/2023
Special inspection requirement — Metering
Mohammad Baalbaki
11/22/2023
Special inspection requirement — Interior lighting power
Mohammad Baalbaki
11/21/2023
Objection resolved — Addressed
11/21/2023
Objection resolved — Addressed
11/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2023
Objection raised — Other
11/20/2023
Objection raised — Other
11/17/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-P2
11/17/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-P1
11/17/2023
Special inspection requirement — Metering
Mohammad Baalbaki
11/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
11/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
11/17/2023
Special inspection requirement — Final
JOHN MALVASIO
11/17/2023
Special inspection requirement — Interior lighting power
Mohammad Baalbaki
11/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2023
Permit issued — General Construction
B00805218-I1-GC
08/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2023
Permit issued — Plumbing
B00805218-S2-PL
02/07/2023
Permit issued — General Construction
B00805218-I1-GC
01/02/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-S2
12/30/2022
Objection raised — Other
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Scope
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Other
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Zoning
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Admin
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Inspections
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Accessibility
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Energy
12/30/2022
Objection resolved — Addressed
12/30/2022
Objection raised — Accessibility
12/30/2022
Objection resolved — Addressed
12/28/2022
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00805218-I1
12/08/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00435397-I1
10/18/2021
Signed off — Alteration
B00550302-I1
09/09/2021
Permit issued — Structural
B00550302-I1-ST
07/13/2021
Filed — Alteration
B00550302-I1
12/03/2020
Permit issued — Sidewalk Shed
B00435397-I1-SH
12/02/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00435397-I1
12/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2020
Special inspection requirement — Final
FADY HABEEL
12/01/2020
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H L GENERAL CONTRACTORS1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2021$300K—— → —$263/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP103/21/2026
B A INSPECTIONS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC INSTALLATION CORP.General Contractor303/21/2026
H.L. GENERAL CONTRACTORSGeneral Contractor307/08/2026
UNITY CONSTRUCTION GROUPGeneral Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAALBAKI&ASSOCIATES ENGIN1858211/17/2023
PSI AGENCY INC.254107/13/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS10/11/2023
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP07/21/2023
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS02/07/2023
DOB NOWStructuralSigned-offUNITY CONSTRUCTION GROUP09/09/2021
DOB NOWSidewalk ShedSigned-offDYNAMIC INSTALLATION CORP12/03/2020
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/22/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
11/22/2023FinalJOHN MALVASIOprogress
11/22/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
11/22/2023MeteringMohammad Baalbakienergy_progress
11/22/2023Interior lighting powerMohammad Baalbakienergy_progress
11/17/2023MeteringMohammad Baalbakienergy_progress
11/17/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
11/17/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
11/17/2023FinalJOHN MALVASIOprogress
11/17/2023Interior lighting powerMohammad Baalbakienergy_progress
12/02/2020FinalFADY HABEELprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/01/2026B00550302-I1Request digital key ↗
08/28/2026B00805218-P4Request digital key ↗
08/28/2026B00805218-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00435397-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026B00805218-P1Open ↗
08/27/2026B00805218-P1Open ↗
08/27/2026B00805218-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00550302-I1Open ↗
08/28/2026B00805218-P1Open ↗
08/28/2026B00805218-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00805218-P1Open ↗
08/24/2026B00805218-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00550302-I1Open ↗
08/28/2026B00805218-S2Open ↗
08/28/2026B00805218-P4Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00550302-I1Open ↗