← Back
Primarily 2 family with 1 store or office
4114 5 AVENUE
BROOKLYN · BIN 3010751
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
3,000 sfGross Floor Area
3Units
8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHENKER ARCHITECT, PC602/04/2025
RONALD VILLANO ARCHITECT PC111/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES103/21/2026
Shenker Architects603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE CITY CONSTRUCTIONGeneral Contractor307/08/2026
BILLY SERVULUSElectrical103/21/2026
SERVULUS BILLYElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHENKER ARCHITECT, PC756502/04/2025
BUILDTECH ENGINEERING6369111/01/2023
Building Lifecycle
All (70)Filed (7)Permit Issued (5)Signed Off (3)Violation (19)Inspection (4)Objection (2)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2025
Signed off — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-I1
08/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/05/2025
Permit issued — General Construction
B00861216-I1-GC
02/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/04/2025
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-P4
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Lighting controls
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Metering
DMITRIY SHENKER
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
12/10/2024
Signed off — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-S1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Metering
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
07/23/2024
Special inspection requirement — Lighting controls
DMITRIY SHENKER
06/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2024
Permit issued — Plumbing
B00861216-S1-PL
02/05/2024
Signed off — Alteration
INSTALL (3) MINI SPLIT UNITS AT THE SIDE OF THE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00951532-I1
01/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DMITRIY SHENKER
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
01/17/2024
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-P2
01/17/2024
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-P3
01/08/2024
Permit issued — Plumbing
B00861216-S1-PL
01/05/2024
Special inspection requirement — Metering
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Lighting controls
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DMITRIY SHENKER
12/05/2023
Permit issued — Mechanical Systems
B00951532-I1-MS
11/09/2023
Objection resolved — Addressed
11/08/2023
Objection raised — Fire_Protection
11/01/2023
Filed — Alteration
INSTALL (3) MINI SPLIT UNITS AT THE SIDE OF THE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00951532-I1
10/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
10/21/2023
Special inspection requirement — Final
RONALD VILLANO
10/21/2023
Special inspection requirement — Mechanical Systems
Luis Pichardo
07/28/2023
Permit issued — General Construction
B00861216-I1-GC
07/20/2023
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-S1
07/20/2023
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-P1
07/19/2023
Special inspection requirement — Energy Code Compliance Inspections
07/19/2023
Special inspection requirement — Interior lighting power
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2023
Filed — Alteration
NO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT 1ST FLOOR PARTITIONS, CEILING, LIGHTS, FINISHES AND STOREFRONT REPAIR AS INDICATED ON PLANS. PLUMBING AND MECHANICAL TO BE FILED SUBSEQUENTLY.
B00861216-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/11/2021
Violation issued (FDNY_ORDER, closed)
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBLUE CITY CONSTRUCTION03/05/2025
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK05/22/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/08/2024
DOB NOWMechanical SystemsSigned-offBLUE CITY CONSTRUCTION12/05/2023
DOB NOWGeneral ConstructionSigned-offBLUE CITY CONSTRUCTION07/28/2023
BISPLISSUEDTHE PLBG COPMPANY INC03/02/2005
BISFPISSUEDCITY FIRE CONTROL01/28/1992
2 projects · most recent 04/11/2024
General Wiring
FiledStatusContractorScope
04/11/2024CompleteWCK ELECTRIC CORP.General Wiring
07/24/2023CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/04/2025Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
02/04/2025Fenestration air leakageDMITRIY SHENKERenergy_progress
02/04/2025Lighting controlsDMITRIY SHENKERenergy_progress
02/04/2025Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
02/04/2025Interior lighting powerDMITRIY SHENKERenergy_progress
02/04/2025MeteringDMITRIY SHENKERenergy_progress
02/04/2025Energy Code Compliance InspectionsDMITRIY SHENKERprogress
07/23/2024Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
07/23/2024Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
07/23/2024Energy Code Compliance InspectionsDMITRIY SHENKERprogress
07/23/2024MeteringDMITRIY SHENKERenergy_progress
07/23/2024Fenestration air leakageDMITRIY SHENKERenergy_progress
07/23/2024Interior lighting powerDMITRIY SHENKERenergy_progress
07/23/2024Lighting controlsDMITRIY SHENKERenergy_progress
01/19/2024HVAC-R and service water piping design and insulationDMITRIY SHENKERenergy_progress
01/19/2024Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
01/05/2024MeteringDMITRIY SHENKERenergy_progress
01/05/2024Fenestration air leakageDMITRIY SHENKERenergy_progress
01/05/2024Lighting controlsDMITRIY SHENKERenergy_progress
01/05/2024Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
01/05/2024Interior lighting powerDMITRIY SHENKERenergy_progress
01/05/2024Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
01/05/2024Energy Code Compliance InspectionsDMITRIY SHENKERprogress
12/15/2023Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
12/15/2023HVAC-R and service water piping design and insulationDMITRIY SHENKERenergy_progress
Latest 25 of 35.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00861216-I1Request digital key ↗
08/27/2026B00861216-S1Request digital key ↗
08/27/2026B00861216-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B00951532-I1Open ↗
08/27/2026B00861216-P3Open ↗
08/27/2026B00861216-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00861216-I1Open ↗
08/27/2026B00861216-S1Open ↗
08/27/2026B00861216-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00951532-I1Open ↗
09/01/2026B00951532-I1Open ↗
08/27/2026B00861216-P3Open ↗
Showing 3 of 7 on file for this type
▸BISPC FULL REPORT1
01/17/2008310071659Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/17/2008310071659Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/17/2008310071659Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/17/2008310071659Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00861216-I1Open ↗
08/27/2026B00861216-S1Open ↗
08/27/2026B00861216-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/17/2008310071659Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/17/2008310071659Open ↗