HPD04/30/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB01/24/2024FAIL2COMPLY,AS OF 1/24/24 ITEMS REQUESTD ON 1/8/24 WEREN'T REC'D.OWNER REQ2OBTAIN NYS PE 2:REVW INSP RPTS/LOCAT INSUFCNTLY DOCMTD AREAS,MEANS TO OBTAIN MISNG DATA,AS-BUILT DRWGS,FULL LIST OF INDIVIDUAL ITEMS THAT DON'T COMPLY W CODE,PROVIDE MEANS 2 CORRECT DEFICIENCIES,PROVIDE CALCS DWGS4REMEDIAL MEASURES4CEU RVW.REMEDY:PROVIDE AL AS PREVIOUS BY 2/2/24
DOB11/14/2023REQUEST FOR INFORMATION.AT INSPCTION,CONSTRUCTION DID NOT MATCH PLANS CEU AUDIT FOUND IMPROPER DESIGN AND INCOMPLETE INSPECTION/RPORTS.REQ'D CORRECTIONS WERE NOT COMPLETE AS OF TIME OF THE VIOLATION.OWNER IS TO HIRE QUALIFIED P.E TO REVIEW INSPECTION REPORTS,FIND AREAS NOT OR IMPROPERLY INSPCTD&PROPOSE MEANS OF OBTNIN
ECB11/22/2022TIME OF INSPECTION AT 5 STORY ALTERATION SITE, I OBSERVED JOB SITE CONSTRUCTION FENCE NOT MAINTAINED TO CODE/ SUBSECTION, LARGE AMOUNT OF GRAFFITI ALL OVER FENCE AND PLYWOOD & VIEWING PANEL NOT MAINTAINED & OPE$1K due
DOB04/04/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321565668 ON 3/31/22 DUE TO CONTRACTOR WITHDRAWAL.
DOB04/04/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321565668 ON 3/31/22 DUE TO CONTRACTOR WITHDRAWAL
DOB04/04/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321837973 ON 3/31/22 DUE TO CONTRACTOR WITHDRAWAL.
DOB04/04/2022BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #321837973 ON 3/31/22 DUE TO CONTRACTOR WITHDRAWAL.
DOB02/13/2020STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMMISSIONERS OFFICE AT 718 802-3677
HPD11/29/2002§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED
ECB09/23/2021FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF PREVIOUS INSPECTION AT ACTIVE CONSTRUCTION SITE 09/01/21 OBSERVED AT EXP #4 ADJACENT PROPERTY'S WALKWAY ABOVE THIS WNothing owed — awaiting certificate of correction
ECB09/01/2021SEC. BC 3301.7 FAILURE TO PROVIDDE APPROVED P.E. CONSTRUCTION DOCUMENTS AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE. OBSERVED ON ROOF HSS POST SUPPORTING STEEL BEAMS. UPON REQUEST OF APPROVED DETAILSNothing owed — awaiting certificate of correction
ECB08/24/2021BC3314.1 INADEQUATE SUPPORTED SCF ATOI OF ACTIVE JOBSITE OBSERVED,@ROOF LEVEL BRICKWORK OPERATION IN PROGRESS ON SUPPORTED SCF&SUPPORTED SCFWAS MISSING GUARDRAIL SYSTEM,BASEPLATES,SCREWJACK,INADEQUATE SUPPORTEDNothing owed — awaiting certificate of correction
ECB08/24/2021FAILURE TO PROVIDE APPROVED CONST DOCS ATOI OF ACTIVE JOBSITE OBSERVED,@ROOF LEVEL CONST OPERATION IN PROGRESS,@EXP4 THERE WAS DIAGONAL BRACING AS OVERHEAD PROTECTION FOR ADJOINING PROPERTY UPON REQUEST TO REVNothing owed — awaiting certificate of correction
ECB08/24/2021FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SEC REQUIREMENTS ATOI OFACTIVE JOBSITE OBSERVED,@GRND LEVEL THERE WAS INADEQUATE HOUSEKEEPING,LARGE AMT OF PLASTIC BAGS,BLDG DEBRIS SCATTERED@FRONT OF FL,CREATING UNothing owed — awaiting certificate of correction