← Back
Primarily 2 family with 1 store or office
4505 8 AVENUE
BROOKLYN · BIN 3011762
💬 Discuss this project
1932Year Built
2Stories
S2Building Class
R6Zoning
2,534 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: QUAN DONG REALTY, LLC · 1,385 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 15p · 3 filings · 12 docs
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUAN DONG REALTY1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI411/14/2025
BRIAN ILL DEVELOPMENT LLC206/25/2024
ASHRAF CORP112/02/2023
ABC ENGINEERING PLLC108/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MILETO ARCH ASSOCAITE DPC403/21/2026
ABC ENGINEERING PLLC203/21/2026
AN TONG FAN203/21/2026
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor404/09/2026
XH&RC PLBG AND HTG INCPlumbing307/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
GREEN CITY BOX TRANS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394311/12/2025
BRIAN ILL DEVELOPMENT LLC1402206/25/2024
Building Lifecycle
All (50)Filed (8)Permit Issued (5)Signed Off (4)Violation (11)Inspection (8)Special Inspection (14)
04/13/2026
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01299581-I1
12/04/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01299638-I1
12/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/03/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
11/14/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01299581-P1
11/12/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01299638-P1
11/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2025
Permit issued — General Construction
B01299638-I1-GC
10/22/2025
Permit issued — Plumbing
B01299581-I1-PL
10/22/2025
Permit issued — General Construction
B01299638-I1-MS
10/17/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01299581-I1
10/17/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
B01299638-I1
03/11/2025
Signed off — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALLATION OF NEW PARTITIONS, FLOOR/WALL FINISHES, AND CEILING TITLES. EXISTING PARTITIONS TO BE PAINTED. INSTALL NEW TOILET EXHAUST FAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01072212-I1
03/11/2025
Signed off — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON THE FIRST FLOOR ONLY, NO CHANGE IN USE, EGRESS AND OCCUPANCY. INSTALLATION OF PREP SINKS. INSTALL NEW TOILET ROOM FIXTURES.
B01063621-I1
12/16/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2024
Permit issued — Plumbing
B01063621-I1-PL
06/28/2024
Permit issued — General Construction
B01072212-I1-GC
06/25/2024
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALLATION OF NEW PARTITIONS, FLOOR/WALL FINISHES, AND CEILING TITLES. EXISTING PARTITIONS TO BE PAINTED. INSTALL NEW TOILET EXHAUST FAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01072212-I1
06/25/2024
Filed — Alteration
INTERIOR RENOVATION OF COMMERCIAL SPACE ON THE FIRST FLOOR ONLY, NO CHANGE IN USE, EGRESS AND OCCUPANCY. INSTALLATION OF PREP SINKS. INSTALL NEW TOILET ROOM FIXTURES.
B01063621-I1
06/25/2024
Special inspection requirement — Lighting controls
BRIAN ILL
06/25/2024
Special inspection requirement — Interior lighting power
BRIAN ILL
06/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
06/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
06/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN ILL
06/25/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
06/25/2024
Special inspection requirement — Final
BRIAN ILL
06/21/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
06/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN ILL
12/02/2023
Filed — Alteration
FILING FOR THE EXISTING COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00960988-I1
11/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/10/2023
Special inspection requirement — Mechanical Systems
11/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/10/2023
Special inspection requirement — Final
08/17/2018
Filed — Alteration
B00068078-I1
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC10/22/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG10/22/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC10/22/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC07/08/2024
DOB NOWGeneral ConstructionSigned-offGREEN CITY BOX TRANS INC06/28/2024
BISMHISSUEDYONGXIN INT CONTRACTOR I*03/02/2022
BISOTISSUEDMBC CONSTRUCTION CORP06/26/2019
BISMHISSUEDMIN FA CONSTRUCTION CORP11/18/2018
BISBLISSUEDFLYTIGER P & H LTD08/31/2018
BISPLISSUEDFLYTIGER P & H LTD08/28/2018
BISOTISSUEDMIN FA CONSTRUCTION CORP08/17/2018
1 project · most recent 12/02/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2023——Ventilation Systems
Ventilation
Captiveaire BI24 9,600 CFM · Exhaust Fan ×1
5 projects · most recent 01/31/2020
General Wiring HVAC Wiring Boiler Controls
FiledStatusContractorScope
01/31/2020Permit IssuedA ELECTRICAL MAIN SVC INCHVAC Wiring
12/09/2019Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
07/22/2019CompleteA ELECTRICAL MAIN SVC INC3 meters, 1 new_meters
06/27/2019CompleteHI-RITE ELECTRIC CORPBoiler Controls
10/23/2018CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/03/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/16/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/17/2025Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
06/25/2024Lighting controlsBRIAN ILLenergy_progress
06/25/2024Interior lighting powerBRIAN ILLenergy_progress
06/25/2024Fire-Resistance Rated ConstructionBRIAN ILLprogress
06/25/2024Fire-Resistant Penetrations and JointsBRIAN ILLspecial
06/25/2024Tenant Protection Plan ComplianceBRIAN ILLspecial
06/25/2024Energy Code Compliance InspectionsBRIAN ILLprogress
06/25/2024FinalBRIAN ILLprogress
06/21/2024Energy Code Compliance InspectionsBRIAN ILLprogress
06/21/2024Tenant Protection Plan ComplianceBRIAN ILLspecial
11/21/2023Tenant Protection Plan Compliance—special
11/10/2023Mechanical Systems—special
11/10/2023Fire-Resistant Penetrations and Joints—special
11/10/2023Final—progress
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026B00068078-I1Request digital key ↗
08/26/2026B00960988-I1Request digital key ↗
08/24/2026B01063621-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION7
03/10/2022321968117Open ↗
03/10/2022321968117Open ↗
06/28/2019321968117Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
12/20/2019321968117Open ↗
02/26/2019321748329Open ↗
01/08/2019321748329Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/18/2022321968117Open ↗
03/07/2022321968117Open ↗
06/26/2019321968117Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00068078-I1Open ↗
08/26/2026B00960988-I1Open ↗
08/24/2026B01063621-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/28/2019321968117Open ↗
06/26/2019321968117Open ↗
05/13/2019321748329Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01072212-I1Open ↗
09/01/2026B01072212-I1Open ↗
09/01/2026B01072212-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01072212-I1Open ↗
09/01/2026B01072212-I1Open ↗
08/28/2026B01063621-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/26/2019321968117Open ↗
07/24/2018321748329Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/24/2022321968117Open ↗
▸BISPLUMBING (PL) SIGNOFF1
08/24/2022321968117Open ↗
▸BISHEATING SYSTEMS1
08/24/2022321968117Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/20/2019321748329Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/24/2022321968117Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
06/28/2019321968117Open ↗
06/26/2019321968117Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00960988-I1Open ↗
08/24/2026B01063621-I1Open ↗
08/24/2026B01072212-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/28/2019321968117Open ↗
08/22/2018321748329Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/28/2019321968117Open ↗
06/26/2019321968117Open ↗
05/13/2019321748329Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/24/2022321968117Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/24/2022321968117Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/24/2022321968117Open ↗
▸BISLIGHTING CONTROLS1
08/24/2022321968117Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/24/2022321968117Open ↗
▸BISINTERIOR LIGHTING POWER1
08/24/2022321968117Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/13/2019321748329Open ↗
▸Inspections & Test Reports6
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/24/2022321968117Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/24/2022321968117Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/24/2022321968117Open ↗
▸BISMECHANICAL SYSTEMS1
08/24/2022321968117Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/13/2019321748329Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/24/2022321968117Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/25/2022321968117Open ↗
05/13/2019321748329Open ↗
05/13/2019321748329Open ↗
▸BISFINAL1
08/24/2022321968117Open ↗
▸BISSUPERSEDING LETTER1
03/10/2022321968117Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
08/24/2022321968117Open ↗
06/28/2019321968117Open ↗
06/26/2019321968117Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/24/2022321968117Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION10
07/22/2022321968117Open ↗
04/21/2022321968117Open ↗
01/10/2020321968117Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM3
03/10/2022321968117Open ↗
05/13/2019321748329Open ↗
05/13/2019321748329Open ↗
▸BISEFILING COVER SHEET2
06/26/2019321968117Open ↗
07/24/2018321748329Open ↗
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
08/24/2022321968117Open ↗