← Back
Primarily 2 family with 1 store or office
5006 8 AVENUE
BROOKLYN · BIN 3013419
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6Zoning
3,084 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: SILVER RIVER REALTY · 1,813 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 25p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SILVER RIVER REALTY103/22/2026
BROOKLYN CHINESE AMERICA ASSOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP404/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor407/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371404/14/2025
Building Lifecycle
All (28)Filed (4)Permit Issued (3)Signed Off (2)Violation (4)Inspection (2)Special Inspection (13)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2025
Signed off — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-I1
04/22/2025
Signed off — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-S1
04/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2025
Filed — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-P2
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/26/2025
Special inspection requirement — Interior lighting power
Eric Sun
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
03/26/2025
Special inspection requirement — Final
Eric Sun
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/26/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
03/25/2025
Filed — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-P1
03/24/2025
Permit issued — General Construction
B01161644-I1-GC
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/24/2025
Special inspection requirement — Final
Eric Sun
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
03/24/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
03/24/2025
Special inspection requirement — Interior lighting power
Eric Sun
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2025
Filed — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-S1
01/15/2025
Permit issued — Plumbing
B01161644-S1-PL
01/09/2025
Permit issued — General Construction
B01161644-I1-GC
01/02/2025
Filed — Alteration
INTERIOR RENOVATION OF 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01161644-I1
08/17/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2010
Violation issued (ECB, open)
Boilers
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY03/24/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/15/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY01/09/2025
2 projects · most recent 06/09/2025
General Wiring
FiledStatusContractorScope
06/09/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
02/08/2025CompleteCL ELECTRICAL CORP4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/07/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/26/2025Interior lighting powerEric Sunenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/26/2025Fire-Resistance Rated ConstructionEric Sunprogress
03/26/2025FinalEric Sunprogress
03/26/2025Energy Code Compliance InspectionsEric Sunprogress
03/26/2025Insulation placement and R valuesEric Sunenergy_progress
03/24/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/24/2025Energy Code Compliance InspectionsEric Sunprogress
03/24/2025FinalEric Sunprogress
03/24/2025Fire-Resistance Rated ConstructionEric Sunprogress
03/24/2025Insulation placement and R valuesEric Sunenergy_progress
03/24/2025Interior lighting powerEric Sunenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01161644-P2Request digital key ↗
08/21/2026B01161644-P1Request digital key ↗
08/21/2026B01161644-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/10/2008310234902Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026B01161644-P1Open ↗
08/30/2026B01161644-P1Open ↗
08/30/2026B01161644-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01161644-I1Open ↗
08/21/2026B01161644-S1Open ↗
08/13/2026B01161644-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01161644-P2Open ↗
08/30/2026B01161644-P1Open ↗
08/26/2026B01161644-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/10/2008310234902Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
12/10/2008310234902Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01161644-S1Open ↗
08/21/2026B01161644-I1Open ↗
08/13/2026B01161644-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/10/2008310234902Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
12/10/2008310234902Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/10/2008310234902Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/10/2008310234902Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/10/2008310234902Open ↗