← Back
General warehouse
228 51 STREET
BROOKLYN · BIN 3013466
💬 Discuss this project
1989Year Built
2Stories
E1Building Class
M1-2DZoning
8,910 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: 228 51 ST LLC · 4,958 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
Architecture
Floor 23p · 1 filing · 3 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.205/26/2026
RISE ARCHITECTURE208/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PISILI INCGeneral Contractor407/08/2026
PISILIGeneral Contractor203/22/2026
MVS HEATING & AIR CONDITGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738205/26/2026
MARCH CHADWICK, ARCHITECT2253108/10/2021
Building Lifecycle
All (18)Filed (4)Permit Issued (3)Signed Off (3)Violation (2)Inspection (3)Special Inspection (3)
06/10/2026
Signed off — Alteration
DIRECT REPLACEMENT OF (2) ROOFTOP HVAC SINGLE PACKAGE UNITS ONTO EXISTING ROOF CURBS.
B01377941-I1
05/28/2026
Special inspection requirement — Mechanical Systems
anthony santoro
05/28/2026
Special inspection requirement — Final
anthony santoro
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/26/2026
Filed — Alteration
DIRECT REPLACEMENT OF (2) ROOFTOP HVAC SINGLE PACKAGE UNITS ONTO EXISTING ROOF CURBS.
B01377941-P1
04/02/2026
Permit issued — Mechanical Systems
B01377941-I1-MS
03/30/2026
Filed — Alteration
DIRECT REPLACEMENT OF (2) ROOFTOP HVAC SINGLE PACKAGE UNITS ONTO EXISTING ROOF CURBS.
B01377941-I1
01/28/2022
Signed off — Alteration
B00563641-I1
01/27/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/14/2022
Signed off — Alteration
B00462248-I1
01/13/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/13/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/03/2021
Permit issued — Curb Cut
B00462248-I1-CC
11/03/2021
Permit issued — General Construction
B00563641-I1-GC
08/10/2021
Filed — Alteration
B00563641-I1
02/03/2021
Filed — Alteration
B00462248-I1
12/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT04/02/2026
DOB NOWCurb CutSigned-offPISILI INC11/03/2021
DOB NOWGeneral ConstructionSigned-offPISILI INC11/03/2021
BIS—ISSUEDPISILI INC11/04/2021
1 job · most recent 05/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Signed-offMVS HEATING & AIR CONDITHeating and Air Conditioning Systems
Heat / Cool
Trane TRANE, GDK036A3EMA0000* 3 tons · Packaged Unit ×1
TRANE, GDK048A3EMA0000* 4 tons · Packaged Unit ×1
TRANE, GDK036A3EMA0D00* 3 tons · Packaged Unit ×1
TRANE, GDK048A3EMA0D00* 4 tons · Packaged Unit ×1
Luxaire LUXAIRE, KJ078N18R2AAAAA1A1 78,000 CFM · Packaged Unit ×1
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/13/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/28/2026Mechanical Systemsanthony santorospecial
05/28/2026Finalanthony santoroprogress
05/28/2026Energy Code Compliance Inspectionsanthony santoroprogress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
09/01/2026B00563641-I1Request digital key ↗
08/17/2026B01377941-P1Request digital key ↗
08/17/2026B01377941-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00462248-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION12
01/25/2022322035481Open ↗
11/15/2021322035481Open ↗
11/10/2021322035481Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/10/2021322035481Open ↗
▸BISWORK PERMIT APPLICATION1
11/04/2021322035481Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/23/2021322035481Open ↗
▸BISVERIFY TAX LOT1
11/04/2021322035481Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/23/2021322035481Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/23/2021322035481Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00462248-I1Open ↗
09/01/2026B00563641-I1Open ↗
08/17/2026B01377941-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01377941-I1Open ↗
08/23/2026B01377941-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01377941-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
04/23/2021322035481Open ↗
02/08/2021322035481Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00563641-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE6
06/30/2021322035481Open ↗
06/29/2021322035481Open ↗
06/24/2021322035481Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/26/2021322035481Open ↗
07/23/2021322035481Open ↗
07/23/2021322035481Open ↗
▸BISCURB CUT B00462248-I1 & GC B00563641-I1REQUIRED SIGNED OFF PRIOR TO SIGN OFF1
03/16/2022322035481Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
02/09/2022322035481Open ↗
▸BISCOST AFFIDAVIT1
02/08/2021322035481Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
01/27/2022322035481Open ↗
11/16/2021322035481Open ↗
10/26/2021322035481Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
02/08/2021322035481Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/17/2021322035481Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/04/2021322035481Open ↗
▸BISPLOT DIAGRAM1
02/08/2021322035481Open ↗