← Back
Predominantly retail with other uses
5422 5 AVENUE
BROOKLYN · BIN 3014612
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
C4-3AZoning
4,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: RUBINSTEIN ASSOCIATES L.P. · 1,600 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 17 docs
Floor 1
Cellar1p · 1 filing · 17 docs
2 jobs · most recent 06/20/2022
General Wiring
FiledStatusContractorScope
06/20/2022CompleteFIRST STAR ELECTRIC INCGeneral Wiring
11/23/2021CompleteELPO ELECTRICAL CONTG INC—
Building Lifecycle
All (52)Filed (7)Permit Issued (7)Signed Off (4)Violation (1)Inspection (3)Special Inspection (30)
04/11/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 2ND AND 3RD FLOOR 2 DWELLING UNITS. INSTALL NEW PLUMBING FIXTURES, INSTALL NEW AC SPLIT UNITS. PLUMBING AND MECHANICAL WILL BE FILED TO DOB NOW UNDER SEPARATE APPLICATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00563126-I1
04/11/2023
Signed off — Alteration
File plumbing work in conjunction with alternation type II job #B00563126, interior renovation of existing dwelling units. Install new plumbing fixtures as per plan. No change in use, egress or occupancy.
B00572315-I1
04/11/2023
Signed off — Alteration
B00579159-I1
07/12/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/11/2022
Permit issued — General Construction
B00563126-I1-GC
05/10/2022
Permit issued — Mechanical Systems
B00579159-I1-MS
03/03/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00639070-I1
01/06/2022
Special inspection requirement — Insulation placement and R values
DANIEL HOM
01/06/2022
Special inspection requirement — Fenestration air leakage
DANIEL HOM
01/06/2022
Special inspection requirement — Lighting controls
DANIEL HOM
01/06/2022
Special inspection requirement — Lighting in dwelling units
DANIEL HOM
01/06/2022
Special inspection requirement — Energy Code Compliance Inspections
DANIEL HOM
01/06/2022
Special inspection requirement — Interior lighting power
DANIEL HOM
01/06/2022
Special inspection requirement — Air barrier - visual inspection
DANIEL HOM
01/06/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DANIEL HOM
01/06/2022
Special inspection requirement — Final
DANIEL HOM
01/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
DANIEL HOM
01/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL HOM
01/05/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2ND AND 3RD FLOOR 2 DWELLING UNITS. INSTALL NEW PLUMBING FIXTURES, INSTALL NEW AC SPLIT UNITS. PLUMBING AND MECHANICAL WILL BE FILED TO DOB NOW UNDER SEPARATE APPLICATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00563126-P1
12/27/2021
Special inspection requirement — Final
Sunil Saigal
12/24/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00639070-P1
12/24/2021
Special inspection requirement — Air barrier - visual inspection
DANIEL HOM
12/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL HOM
12/24/2021
Special inspection requirement — Energy Code Compliance Inspections
DANIEL HOM
12/24/2021
Special inspection requirement — Final
DANIEL HOM
12/24/2021
Special inspection requirement — Fire-Resistance Rated Construction
DANIEL HOM
12/24/2021
Special inspection requirement — Fenestration air leakage
DANIEL HOM
12/24/2021
Special inspection requirement — Insulation placement and R values
DANIEL HOM
12/24/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DANIEL HOM
12/24/2021
Special inspection requirement — Interior lighting power
DANIEL HOM
12/24/2021
Special inspection requirement — Lighting controls
DANIEL HOM
12/24/2021
Special inspection requirement — Lighting in dwelling units
DANIEL HOM
12/14/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/01/2021
Permit issued — Plumbing
B00572315-I1-PL
11/30/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00639070-I1
11/30/2021
Permit issued — Supported Scaffold
B00639070-I1-SH
11/30/2021
Permit issued — Supported Scaffold
B00639070-I1-SF
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL HOM
09/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL HOM
09/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL HOM
09/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
DANIEL HOM
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
DANIEL HOM
09/24/2021
Filed — Alteration
File plumbing work in conjunction with alternation type II job #B00563126, interior renovation of existing dwelling units. Install new plumbing fixtures as per plan. No change in use, egress or occupancy.
B00572315-P1
09/21/2021
Special inspection requirement — Energy Code Compliance Inspections
DANIEL HOM
09/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL HOM
08/30/2021
Permit issued — Plumbing
B00572315-I1-PL
08/26/2021
Filed — Alteration
B00579159-I1
08/17/2021
Permit issued — General Construction
B00563126-I1-GC
08/09/2021
Filed — Alteration
File plumbing work in conjunction with alternation type II job #B00563126, interior renovation of existing dwelling units. Install new plumbing fixtures as per plan. No change in use, egress or occupancy.
B00572315-I1
07/30/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2ND AND 3RD FLOOR 2 DWELLING UNITS. INSTALL NEW PLUMBING FIXTURES, INSTALL NEW AC SPLIT UNITS. PLUMBING AND MECHANICAL WILL BE FILED TO DOB NOW UNDER SEPARATE APPLICATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00563126-I1
01/28/2021
Violation issued (FDNY_ORDER, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUBINSTEIN ASSOCIATES, L.P.1707/08/2026
PHOENIX SUTTON STR INC903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL HOM P.E.501/05/2022
ENTHINK ENGINEERS LLC212/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JJ WELL CONSTRUCTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
JJ WELL CONSTRUCTION INCGeneral Contractor307/08/2026
FLYTIGER P & H LTDPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DANIEL HOM7466501/05/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJJ WELL CONSTRUCTION INC05/11/2022
DOB NOWMechanical SystemsSigned-offJJ WELL CONSTRUCTION INC05/10/2022
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD12/01/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/30/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/30/2021
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD08/30/2021
DOB NOWGeneral ConstructionSigned-offJJ WELL CONSTRUCTION INC08/17/2021
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/14/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/06/2022Insulation placement and R valuesDANIEL HOMenergy_progress
01/06/2022Fenestration air leakageDANIEL HOMenergy_progress
01/06/2022Lighting controlsDANIEL HOMenergy_progress
01/06/2022Lighting in dwelling unitsDANIEL HOMenergy_progress
01/06/2022Energy Code Compliance InspectionsDANIEL HOMprogress
01/06/2022Interior lighting powerDANIEL HOMenergy_progress
01/06/2022Air barrier - visual inspectionDANIEL HOMenergy_progress
01/06/2022Fenestration and door U-factor and product ratingsDANIEL HOMenergy_progress
01/06/2022FinalDANIEL HOMprogress
01/06/2022Fire-Resistance Rated ConstructionDANIEL HOMprogress
01/06/2022Fire-Resistant Penetrations and JointsDANIEL HOMspecial
12/27/2021FinalSunil Saigalprogress
12/24/2021Air barrier - visual inspectionDANIEL HOMenergy_progress
12/24/2021Fire-Resistant Penetrations and JointsDANIEL HOMspecial
12/24/2021Energy Code Compliance InspectionsDANIEL HOMprogress
12/24/2021FinalDANIEL HOMprogress
12/24/2021Fire-Resistance Rated ConstructionDANIEL HOMprogress
12/24/2021Fenestration air leakageDANIEL HOMenergy_progress
12/24/2021Insulation placement and R valuesDANIEL HOMenergy_progress
12/24/2021Fenestration and door U-factor and product ratingsDANIEL HOMenergy_progress
12/24/2021Interior lighting powerDANIEL HOMenergy_progress
12/24/2021Lighting controlsDANIEL HOMenergy_progress
12/24/2021Lighting in dwelling unitsDANIEL HOMenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsDANIEL HOMspecial
09/29/2021HVAC-R and service water heating system controlsDANIEL HOMenergy_progress
Latest 25 of 33.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00563126-I1Request digital key ↗
09/01/2026B00563126-P1Request digital key ↗
09/01/2026B00572315-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026B00572315-I1Open ↗
09/27/2026B00572315-I1Open ↗
09/27/2026B00572315-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00563126-I1Open ↗
09/01/2026B00563126-P1Open ↗
09/01/2026B00572315-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00572315-I1Open ↗
09/01/2026B00572315-P1Open ↗
08/31/2026B00563126-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00563126-P1Open ↗
09/01/2026B00563126-I1Open ↗
09/01/2026B00572315-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00563126-I1Open ↗
09/01/2026B00572315-I1Open ↗
08/13/2026B00579159-I1Open ↗