← Back
Single or multiple dwelling with stores or offices
5507 5 AVENUE
BROOKLYN · BIN 3015006
💬 Discuss this project
1931Year Built
4Stories
S9Building Class
C4-3AZoning
6,212 sfGross Floor Area
8Units
Rent Stabilized32 Open Violations 31 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 5TH AVE BRICKS LLC · 2,600 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
MechanicalGeneral
Roof2p · 1 filing · 7 docs
Floor 14p · 2 filings · 10 docs
2 jobs · most recent 03/13/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2025——Heating and Air Conditioning Systems
Heat / Cool
Ct-Morley MOU-A550H-2 18,000 BTU · Split System ×1
12/06/2022Permit IssuedSUPERIOR FIRE CONTROL INCVentilation Systems
Ventilation
Pen Vent USBI18DD 3,900 CFM · Kitchen Exhaust ×1
Building Lifecycle
All (76)Filed (2)Permit Issued (1)Violation (58)Objection (3)Special Inspection (12)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
03/28/2025
Objection resolved — Resolved
03/20/2025
Objection raised — Scope
03/20/2025
Objection raised — Scope
03/13/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE, INCLUDING: INSTALL CERAMIC FLOOR, INTERIOR PARTITION WALLS, CEILING, MECHANICAL WORK AS PER PLANS. THE PLUMBING APPLICATION IS TO BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE. USE AGREESOR OCCUPANCY IN THIS APP
B01193599-I1
03/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
IRVING PRUS
03/12/2025
Special inspection requirement — Lighting controls
IRVING PRUS
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IRVING PRUS
03/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IRVING PRUS
03/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
IRVING PRUS
03/12/2025
Special inspection requirement — Interior lighting power
IRVING PRUS
03/11/2025
Special inspection requirement — Mechanical Systems
IRVING PRUS
03/11/2025
Special inspection requirement — Final
IRVING PRUS
10/17/2024
Violation issued (FDNY_ORDER, closed)
10/17/2024
Violation issued (FDNY_ORDER, closed)
10/17/2024
Violation issued (FDNY_ORDER, closed)
10/17/2024
Violation issued (FDNY_ORDER, closed)
10/17/2024
Violation issued (FDNY_ORDER, closed)
04/03/2024
Violation issued (HPD, closed)
A
03/07/2024
Violation issued (ECB, closed)
Construction
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2023
Permit issued — Mechanical Systems
B08040486-I1-MS
12/06/2022
Filed — Alteration
INSTALL NEW KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR EXISTING STORE AS PER PLANS.
B08040486-I1
11/15/2022
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
11/15/2022
Special inspection requirement — Mechanical Systems
Jay Kavi
11/15/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
11/15/2022
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
11/10/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
04/24/2018
Violation issued (HPD, open)
B
04/24/2018
Violation issued (HPD, closed)
C
04/24/2018
Violation issued (HPD, open)
B
04/24/2018
Violation issued (HPD, open)
C
04/24/2018
Violation issued (HPD, open)
A
04/24/2018
Violation issued (HPD, open)
A
04/24/2018
Violation issued (HPD, open)
B
04/24/2018
Violation issued (HPD, open)
B
04/24/2018
Violation issued (HPD, open)
B
04/24/2018
Violation issued (HPD, open)
A
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2015
Violation issued (HPD, open)
B
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2010
Violation issued (ECB, closed)
Unknown
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2003
Violation issued (ECB, open)
HPD
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 76 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAPILANDIA407/08/2026
5TH AVE BRICKS LLC303/22/2026
KWON103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2022$1.7M—5507 ASSOCIATES LLC → 5TH AVE BRICKS LLC$269/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DD DESIGN GROUP INC.103/13/2025
ASHRAF CORP112/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERIOR FIRE CONTROL103/21/2026
EB STUDIO EXP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YOUNG CHOEElectrical103/21/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IRVING B. PRUS6993103/13/2025
JAY KAVI CORPORATION8500112/06/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC01/06/2023
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/22/2014
BISBLISSUEDBELL FUEL OIL, LLC10/30/2013
BISFPISSUEDIDEAL FIRE CONTROL INC01/09/2004
BISFPISSUEDIDEAL FIRE CONTROL INC06/23/1998
BISFPISSUEDMASTER FIRE PREVENTION SYS INC03/19/1993
BISOTISSUEDSEUNG YUNG03/15/1993
BISEQISSUEDSEUNG YUNG03/15/1993
BISPLISSUEDADCO PL & HEATING12/03/1992
BISMHISSUEDSALVATORE PARLANTI & CATHARINE10/30/1992
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/12/2025HVAC-R and service water heating equipmentIRVING PRUSenergy_progress
03/12/2025Lighting controlsIRVING PRUSenergy_progress
03/12/2025Structural Stability – Alterations of existing buildingsIRVING PRUSspecial
03/12/2025HVAC-R and service water piping design and insulationIRVING PRUSenergy_progress
03/12/2025HVAC-R and service water heating system controlsIRVING PRUSenergy_progress
03/12/2025Interior lighting powerIRVING PRUSenergy_progress
03/11/2025Mechanical SystemsIRVING PRUSspecial
03/11/2025FinalIRVING PRUSprogress
11/15/2022Tenant Protection Plan ComplianceJay Kavispecial
11/15/2022Mechanical SystemsJay Kavispecial
11/15/2022FinalBRIAN MCCAFFREYprogress
11/15/2022Duct leakage testing, insulation and designAKM HOQUEenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08040486-I1Request digital key ↗
08/22/2026B01193599-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/10/2014320879448Open ↗
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗
▸BISWORK PERMIT APPLICATION2
10/10/2014320879448Open ↗
07/17/2014320966479Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/29/2014320966479Open ↗
07/17/2014320966479Open ↗
06/05/2014320966479Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026B01193599-I1Open ↗
08/13/2026B08040486-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B08040486-I1Open ↗
08/30/2026B08040486-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B08040486-I1Open ↗
08/30/2026B08040486-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
10/10/2014320879448Open ↗
10/24/2013320879448Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/23/2015320879448Open ↗
11/06/2014320879448Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/24/2013320879448Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/29/2014320966479Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/10/2014320879448Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01193599-I1Open ↗
08/13/2026B08040486-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2013320879448Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2013320879448Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
07/29/2014320966479Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/29/2014320966479Open ↗
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
06/05/2014320966479Open ↗
10/24/2013320879448Open ↗