← Back
Primarily 5-6 family with 1 store or office
5623 5 AVENUE
BROOKLYN · BIN 3015368
💬 Discuss this project
1931Year Built
4Stories
S5Building Class
C4-3AZoning
5,200 sfGross Floor Area
7Units
Rent Stabilized33 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · 1,600 sf lot · 3.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI CITY CONSTRUCTION507/08/2026
NYC OPTICAL GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BFS ARCHITECT PC306/30/2022
GONY ARCHITECT & PLANNER PC108/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARKADY SHENDEROVICH PE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERGER CARLOSElectrical103/21/2026
TRI CITY CONSTRUCTION CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS ARCHITECT PC7477306/30/2022
Building Lifecycle
All (83)Filed (4)Permit Issued (1)Signed Off (1)Violation (59)Inspection (2)Special Inspection (16)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
07/06/2022
Signed off — Alteration
INTERIOR RENOVATION FOR FIRE DAMAGE THIRD FLOOR DWELLING UNIT IN EXISTING MIXED-USE BUILDING, NEW SHEETROCK, PAINT, FLOORING, FINISHES AND NEW PL FIXTURES ON EXISTING ROUGHING AS PER PLANS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00562159-I1
07/05/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2022
Filed — Alteration
INTERIOR RENOVATION FOR FIRE DAMAGE THIRD FLOOR DWELLING UNIT IN EXISTING MIXED-USE BUILDING, NEW SHEETROCK, PAINT, FLOORING, FINISHES AND NEW PL FIXTURES ON EXISTING ROUGHING AS PER PLANS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00562159-P2
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
06/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Belal Salim
06/22/2022
Special inspection requirement — Final
Belal Salim
06/22/2022
Special inspection requirement — Fenestration areas
Belal Salim
06/22/2022
Special inspection requirement — Lighting in dwelling units
Belal Salim
06/22/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
06/22/2022
Special inspection requirement — Interior lighting power
Belal Salim
06/22/2022
Special inspection requirement — Fenestration air leakage
Belal Salim
02/24/2022
Filed — Alteration
INTERIOR RENOVATION FOR FIRE DAMAGE THIRD FLOOR DWELLING UNIT IN EXISTING MIXED-USE BUILDING, NEW SHEETROCK, PAINT, FLOORING, FINISHES AND NEW PL FIXTURES ON EXISTING ROUGHING AS PER PLANS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00562159-P1
02/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
02/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Belal Salim
02/23/2022
Special inspection requirement — Final
Belal Salim
02/23/2022
Special inspection requirement — Interior lighting power
Belal Salim
02/23/2022
Special inspection requirement — Fenestration areas
Belal Salim
02/23/2022
Special inspection requirement — Fenestration air leakage
Belal Salim
02/23/2022
Special inspection requirement — Lighting in dwelling units
Belal Salim
02/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Belal Salim
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
12/28/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/23/2021
Permit issued — General Construction
B00562159-I1-GC
07/29/2021
Filed — Alteration
INTERIOR RENOVATION FOR FIRE DAMAGE THIRD FLOOR DWELLING UNIT IN EXISTING MIXED-USE BUILDING, NEW SHEETROCK, PAINT, FLOORING, FINISHES AND NEW PL FIXTURES ON EXISTING ROUGHING AS PER PLANS. NO CHANGE TO THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00562159-I1
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
08/30/2019
Filed — Alteration
B00204916-I1
06/17/2019
Violation issued (HPD, closed)
B
04/08/2019
Violation issued (FDNY_NOV, closed)
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
07/23/2010
Violation issued (HPD, open)
B
07/23/2010
Violation issued (HPD, open)
B
07/23/2010
Violation issued (HPD, open)
B
07/23/2010
Violation issued (HPD, open)
B
07/01/2010
Violation issued (HPD, open)
B
07/01/2010
Violation issued (HPD, open)
B
07/01/2010
Violation issued (HPD, open)
C
04/01/2010
Violation issued (HPD, open)
B
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/30/1996
Violation issued (FDNY_NOV, closed)
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/1986
Violation issued (HPD, open)
B
10/29/1986
Violation issued (HPD, open)
B
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRI CITY CONSTRUCTION COR08/23/2021
BISEQISSUEDRISE DEVELOPMENT PARTNERS09/20/2019
BISOTISSUEDRISE DEVELOPMENT PARTNERS09/20/2019
BISPLISSUEDORION PLUMBING & HTG CORP02/13/2009
BISOTISSUEDO.R.B. STAR CONSTRUCTION02/09/2009
BISPLISSUEDQMB PLUMBING & HEATING INC06/20/2008
BISBLISSUEDQMB PLUMBING & HEATING INC06/20/2008
BISOTISSUEDTHREE STAR CONST06/10/2008
BISEQISSUEDTHREE STAR CONST06/10/2008
BISOTISSUEDCITY KING DECORATIO INC04/11/1995
1 project · most recent 09/07/2021
General Wiring
FiledStatusContractorScope
09/07/2021Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/05/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/28/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/22/2022Fire-Resistant Penetrations and JointsBelal Salimspecial
06/22/2022Energy Code Compliance InspectionsBelal Salimprogress
06/22/2022FinalBelal Salimprogress
06/22/2022Fenestration areasBelal Salimenergy_progress
06/22/2022Lighting in dwelling unitsBelal Salimenergy_progress
06/22/2022Fenestration and door U-factor and product ratingsBelal Salimenergy_progress
06/22/2022Interior lighting powerBelal Salimenergy_progress
06/22/2022Fenestration air leakageBelal Salimenergy_progress
02/23/2022Fire-Resistant Penetrations and JointsBelal Salimspecial
02/23/2022Energy Code Compliance InspectionsBelal Salimprogress
02/23/2022FinalBelal Salimprogress
02/23/2022Interior lighting powerBelal Salimenergy_progress
02/23/2022Fenestration areasBelal Salimenergy_progress
02/23/2022Fenestration air leakageBelal Salimenergy_progress
02/23/2022Lighting in dwelling unitsBelal Salimenergy_progress
02/23/2022Fenestration and door U-factor and product ratingsBelal Salimenergy_progress
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/31/2026B00562159-I1Request digital key ↗
08/31/2026B00562159-P2Request digital key ↗
08/31/2026B00562159-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00204916-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
09/26/2019321982100Open ↗
09/26/2019321982100Open ↗
02/13/2009310294384Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/23/2019321982100Open ↗
07/01/2009320043010Open ↗
02/04/2009310294384Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/19/2019321982100Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/05/2020321982100Open ↗
08/23/2019321982100Open ↗
02/04/2009310294384Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00562159-P2Open ↗
09/01/2026B00562159-P2Open ↗
09/01/2026B00562159-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B00562159-P2Open ↗
08/13/2026B00562159-I1Open ↗
08/13/2026B00204916-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/23/2019321982100Open ↗
02/04/2009310294384Open ↗
06/09/2008310155658Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/04/2009310294384Open ↗
06/09/2008310155658Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00562159-P2Open ↗
08/25/2026B00562159-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/23/2019321982100Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
02/04/2009310294384Open ↗
06/09/2008310155658Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/25/2008310155658Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/12/2008310155658Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/04/2009310294384Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
06/09/2008310155658Open ↗
▸BISTenant Protection Plan and Notes1
08/23/2019321982100Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00204916-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00562159-P1Open ↗
08/13/2026B00562159-I1Open ↗
08/13/2026B00562159-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/04/2009310294384Open ↗
06/09/2008310155658Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/23/2019321982100Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/01/2009320043010Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/05/2020321982100Open ↗
08/23/2019321982100Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/05/2020321982100Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00562159-I1Open ↗
▸Inspections & Test Reports1
▸BISNOTIF-PROPOSED STEAM/HOT WATER INSPECTION1
09/12/2008310155658Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
07/01/2009320043010Open ↗
02/04/2009310294384Open ↗
06/09/2008310155658Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/05/2020321982100Open ↗
10/14/2008310155658Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
09/12/2008310155658Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/05/2020321982100Open ↗
08/23/2019321982100Open ↗
07/01/2009320043010Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
08/23/2019321982100Open ↗
07/01/2009320043010Open ↗
02/04/2009310294384Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
03/05/2020321982100Open ↗