← Back
Miscellaneous two family
398 PROSPECT AVENUE
BROOKLYN · BIN 3016515
💬 Discuss this project
1915Year Built
2Stories
B9Building Class
R5BZoning
2,016 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 398 PROSPECT AVE LLC · 1,283 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 9 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 18 docs
Cellar2p · 2 filings · 20 docs
Sub-Basement1p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SINGH ENGINEERING401/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CJCP CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONWOOD CORPGeneral Contractor203/21/2026
H POWER ELECTRIC INCElectrical103/22/2026
BLAZE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496111/10/2023
Building Lifecycle
All (43)Filed (4)Permit Issued (2)Signed Off (1)Violation (1)Inspection (4)Objection (16)Special Inspection (15)
11/06/2025
Signed off — Alteration
REPLACE AND ADD NEW PLUMBING FIXTURES.
B00928832-I1
01/24/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Admin
01/09/2025
Filed — Alteration
REPLACE AND ADD NEW PLUMBING FIXTURES.
B00928832-P2
12/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/19/2024
Objection resolved — Addressed
09/03/2024
Objection raised — Scope
08/23/2024
Filed — Alteration
REPLACE AND ADD NEW PLUMBING FIXTURES.
B00928832-P1
05/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/19/2024
Permit issued — Plumbing
B00928832-I1-PL
01/03/2024
Objection resolved — Addressed
01/03/2024
Objection resolved — Addressed
12/20/2023
Objection resolved — Addressed
12/19/2023
Objection resolved — Addressed
12/19/2023
Objection resolved — Addressed
12/19/2023
Objection resolved — Addressed
12/11/2023
Objection raised — Scope
12/11/2023
Objection raised — Inspections
12/11/2023
Objection raised — Other
12/11/2023
Objection raised — Inspections
12/11/2023
Objection raised — Inspections
12/11/2023
Objection raised — Fire_Protection
12/04/2023
Filed — Alteration
REPLACE AND ADD NEW PLUMBING FIXTURES.
B00928832-I1
11/22/2023
Permit issued — General Construction
B00953662-I1-GC-CX
11/10/2023
Filed — Alteration
B00953662-I1
11/01/2023
Special inspection requirement — Interior lighting power
Jogendra Bagga
11/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jogendra Bagga
11/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jogendra Bagga
11/01/2023
Special inspection requirement — Fenestration air leakage
Jogendra Bagga
11/01/2023
Special inspection requirement — Fenestration areas
Jogendra Bagga
11/01/2023
Special inspection requirement — Insulation placement and R values
Jogendra Bagga
11/01/2023
Special inspection requirement — Lighting in dwelling units
Jogendra Bagga
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
10/25/2023
Special inspection requirement — Final
Jogendra Bagga
10/25/2023
Special inspection requirement — Heating Systems
ANTHONY UGBEBOR
10/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANTHONY UGBEBOR
10/25/2023
Special inspection requirement — Mechanical Systems
ANTHONY UGBEBOR
10/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Jogendra Bagga
10/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jogendra Bagga
10/25/2023
Special inspection requirement — Structural Wood Frame
Jogendra Bagga
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBLAZE PLUMBING & HEATING01/19/2024
DOB NOWGeneral ConstructionPermit IssuedCONWOOD11/22/2023
1 project · most recent 11/10/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/10/2023Permit IssuedCONWOOD CORPHeating Systems, Ventilation Systems
Heating
Rand And Reardon RRG SERIES RRG067E 134,000 BTU · Boiler ×1
Rheem RHEEM XG75T06ST76UO 76,000 BTU · Water Heater ×1
Ventilation
Broan Model # HB80RL 80 CFM · Exhaust Fan ×1
2 projects · most recent 01/29/2025
General Wiring
FiledStatusContractorScope
01/29/2025CompleteH POWER ELECTRIC INCGeneral Wiring
08/02/2023Permit IssuedGLENDALE ELECTL CONTNG IN—
1 project · most recent 11/10/2023
Wood
FiledStatusContractorScope
11/10/2023Permit IssuedCONWOOD CORPWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/01/2023Interior lighting powerJogendra Baggaenergy_progress
11/01/2023HVAC-R and service water heating equipmentJogendra Baggaenergy_progress
11/01/2023Fenestration and door U-factor and product ratingsJogendra Baggaenergy_progress
11/01/2023Fenestration air leakageJogendra Baggaenergy_progress
11/01/2023Fenestration areasJogendra Baggaenergy_progress
11/01/2023Insulation placement and R valuesJogendra Baggaenergy_progress
11/01/2023Lighting in dwelling unitsJogendra Baggaenergy_progress
10/25/2023Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
10/25/2023FinalJogendra Baggaprogress
10/25/2023Heating SystemsANTHONY UGBEBORspecial
10/25/2023Structural Stability – Alterations of existing buildingsANTHONY UGBEBORspecial
10/25/2023Mechanical SystemsANTHONY UGBEBORspecial
10/25/2023Energy Code Compliance InspectionsJogendra Baggaprogress
10/25/2023Fire-Resistance Rated ConstructionJogendra Baggaprogress
10/25/2023Structural Wood FrameJogendra Baggaprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00953662-I1Request digital key ↗
08/23/2026B00928832-P1Request digital key ↗
08/23/2026B00928832-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00953662-I1Open ↗
09/01/2026B00953662-I1Open ↗
09/01/2026B00953662-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B00928832-I1Open ↗
08/23/2026B00928832-P1Open ↗
08/13/2026B00953662-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00953662-I1Open ↗
09/01/2026B00953662-I1Open ↗
09/01/2026B00953662-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B00928832-P1Open ↗
08/23/2026B00928832-I1Open ↗
08/13/2026B00928832-P2Open ↗
Showing 3 of 4 on file for this type