← Back
Two family converted from one family
452A 17 STREET
BROOKLYN · BIN 3016874
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R5BZoning
1,172 sfGross Floor Area
2Units
Two family converted from one family · 1,252 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMM DESIGN STUDIO111/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323111/17/2025
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
02/26/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01316949-I1
12/23/2025
Permit issued — Solar
B01316949-I1-SL
12/09/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Other
12/02/2025
Objection raised — Cost
11/17/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01316949-I1
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
11/10/2025
Special inspection requirement — Final
RICHARD MUESCH JR.
11/10/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC12/23/2025
1 project · most recent 11/11/2025
FiledStatusContractorScope
11/11/2025CompleteFLOW STATE ELECTRIC, LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/10/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
11/10/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/10/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
11/10/2025FinalRICHARD MUESCH JR.progress
11/10/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026B01316949-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B01316949-I1Open ↗
08/28/2026B01316949-I1Open ↗
08/28/2026B01316949-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026B01316949-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01316949-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026B01316949-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01316949-I1Open ↗