← Back
Miscellaneous two family
302 18 STREET
BROOKLYN · BIN 3017102
💬 Discuss this project
1899Year Built
2Stories
B9Building Class
R6BZoning
1,992 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,283 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 20 docs
Floor 2Under Construction1p · 1 filing · 6 docs
Floor 1Under Construction1p · 1 filing · 6 docs
Cellar3p · 1 filing · 15 docs
Basement1p · 1 filing · 15 docs
Sub-BasementUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B2C REALTY MGMT209/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOSCHEN DESIGN ARCHITECTURE306/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MY BEAUTIFUL HOME DESIGNGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BOSCHEN DESIGN, ARCHITECT2477306/16/2026
Building Lifecycle
All (42)Filed (3)Permit Issued (1)Violation (3)Objection (26)Special Inspection (9)
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
07/30/2026
Objection resolved — Resolved
07/20/2026
Objection raised — Other
07/10/2026
Objection raised — Other
07/10/2026
Objection raised — Cost
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
06/25/2026
Permit issued — General Construction
B01392646-I1-GC
06/16/2026
Filed — Alteration CO
Modification to exist. plumbing system as per plans filed. No change in use, occupancy, egress or floor area.
B01398816-S2
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Boschen
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Richard Boschen
06/10/2026
Special inspection requirement — Maintenance information
Richard Boschen
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Richard Boschen
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Boschen
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Richard Boschen
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Cost
05/13/2026
Filed — Alteration CO
Modification to exist. plumbing system as per plans filed. No change in use, occupancy, egress or floor area.
B01398816-I1
04/28/2026
Filed — Alteration
Bldg. has been abandoned & has had squatters causing damage. Filing removal of non-structural partitions & cabinetry damaged by water & squatters, preliminary to Alt-CO B01398816. No change in use, egress, occupancy, or floor area under this application.
B01392646-I1
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Boschen
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Richard Boschen
04/24/2026
Special inspection requirement — Final
Richard Boschen
12/27/2021
Violation issued (HPD, closed)
I
12/24/2021
Violation issued (HPD, closed)
C
12/24/2021
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMY BEAUTIFUL HOME DESIGN06/25/2026
1 project · most recent 06/16/2026
Water/Sanitary
FiledStatusContractorScope
06/16/2026——Water/Sanitary
1 project · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedKRISCORP ELECL CONTNG INCGeneral Wiring
1 project · most recent 06/16/2026
Wood
FiledStatusContractorScope
06/16/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/10/2026Fire-Resistant Penetrations and JointsRichard Boschenspecial
06/10/2026Energy Code Compliance InspectionsRichard Boschenprogress
06/10/2026Maintenance informationRichard Boschenenergy_progress
06/10/2026HVAC-R and service water heating system controlsRichard Boschenenergy_progress
06/10/2026HVAC-R and service water piping design and insulationRichard Boschenenergy_progress
06/10/2026HVAC-R and service water heating equipmentRichard Boschenenergy_progress
04/28/2026Fire-Resistant Penetrations and JointsRichard Boschenspecial
04/28/2026Fire-Resistance Rated ConstructionRichard Boschenprogress
04/24/2026FinalRichard Boschenprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/15/2026B01398816-S2Request digital key ↗
08/15/2026B01398816-I1Request digital key ↗
08/14/2026B01392646-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026B01398816-S2Open ↗
08/31/2026B01398816-S2Open ↗
08/31/2026B01398816-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01392646-I1Open ↗
08/17/2026B01398816-S2Open ↗
08/17/2026B01398816-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01398816-S2Open ↗
08/25/2026B01392646-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01398816-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026B01398816-S2Open ↗
08/15/2026B01398816-I1Open ↗
08/14/2026B01392646-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/15/2026B01398816-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B01398816-I1Open ↗