Primarily 2 family with 1 store or office
284 FLATBUSH AVENUE
BROOKLYN · BIN 3018943
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R7AZoning
2,955 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: CHINOISERIE & ASSOCIATES LLC · 1,369 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INNOSPARK DESIGN509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT406/29/2026
FARHAD BASSIRI-TEHRANI105/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDWISE CONSTRUCTION GRGeneral Contractor107/08/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
W.R. PLBG AND HTG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AARON MCDONALD ARCHITECT5118406/29/2026
BASSIRI8394105/18/2026
Building Lifecycle
All (47)Filed (5)Permit Issued (3)Signed Off (3)Violation (4)Inspection (2)Special Inspection (30)
07/31/2026
Signed off — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-I1
07/31/2026
Signed off — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-S1
07/17/2026
Signed off — Alteration
INSTALL NEW AWNING WITH CANVAS COVER AT STOREFRONT READING "WE TWO NAIL SPA" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01402573-I1
07/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Aaron McDonald
07/08/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
07/08/2026
Special inspection requirement — Final
Aaron McDonald
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
07/08/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
07/08/2026
Special inspection requirement — Fenestration air leakage
Aaron McDonald
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
07/08/2026
Special inspection requirement — Insulation placement and R values
Aaron McDonald
07/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Aaron McDonald
07/08/2026
Special inspection requirement — Maintenance information
Aaron McDonald
07/08/2026
Special inspection requirement — Air barrier - visual inspection
Aaron McDonald
06/29/2026
Filed — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-P2
06/29/2026
Special inspection requirement — Air barrier - visual inspection
Aaron McDonald
06/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
06/29/2026
Special inspection requirement — Fenestration air leakage
Aaron McDonald
06/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
06/29/2026
Special inspection requirement — Insulation placement and R values
Aaron McDonald
06/29/2026
Special inspection requirement — Maintenance information
Aaron McDonald
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
06/29/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Aaron McDonald
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
06/29/2026
Special inspection requirement — Final
Aaron McDonald
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
06/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
Aaron McDonald
06/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
06/29/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
06/23/2026
Filed — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-P1
05/22/2026
Permit issued — General Construction
B01402573-I1-GC
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/18/2026
Filed — Alteration
INSTALL NEW AWNING WITH CANVAS COVER AT STOREFRONT READING "WE TWO NAIL SPA" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01402573-I1
04/28/2026
Permit issued — Mechanical Systems
B01392025-I1-GC-CX
04/28/2026
Permit issued — Plumbing
B01392025-S1-PL
04/24/2026
Filed — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-I1
04/24/2026
Filed — Alteration
RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01392025-S1
02/08/2011
Violation issued (ECB, closed)
Boilers
12/28/2005
Violation issued (ECB, closed)
Construction
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/22/2026
DOB NOWMechanical SystemsSigned-offBUILDWISE CONSTRUCTION GR04/28/2026
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP04/28/2026
1 project · most recent 06/29/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Signed-offBUILDWISE CONSTRUCTION GRAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-D36NA-1 36,000 BTU · Condensing Unit ×1
Gree MUL36HP230V1R32AO 36,000 BTU · Condensing Unit ×1
Ventilation
Greenheck CUE-095-DGE119XQD 1,049 CFM · Exhaust Fan ×2
1 project · most recent 06/29/2026
Water/Sanitary
FiledStatusContractorScope
06/29/2026Signed-offW.R. PLBG AND HTG CORPWater/Sanitary
1 project · most recent 05/07/2019
FiledStatusContractorScope
05/07/2019Permit IssuedSOUTH HEIGHTS ELECTRIC CO4 meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/08/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
07/08/2026Tenant Protection Plan ComplianceAaron McDonaldspecial
07/08/2026Mechanical SystemsAaron McDonaldspecial
07/08/2026FinalAaron McDonaldprogress
07/08/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
07/08/2026Energy Code Compliance InspectionsAaron McDonaldprogress
07/08/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
07/08/2026Interior lighting powerAaron McDonaldenergy_progress
07/08/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
07/08/2026Fenestration air leakageAaron McDonaldenergy_progress
07/08/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
07/08/2026Insulation placement and R valuesAaron McDonaldenergy_progress
07/08/2026Duct leakage testing, insulation and designAaron McDonaldenergy_progress
07/08/2026Maintenance informationAaron McDonaldenergy_progress
07/08/2026Air barrier - visual inspectionAaron McDonaldenergy_progress
06/29/2026Air barrier - visual inspectionAaron McDonaldenergy_progress
06/29/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
06/29/2026Fenestration air leakageAaron McDonaldenergy_progress
06/29/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
06/29/2026Insulation placement and R valuesAaron McDonaldenergy_progress
06/29/2026Maintenance informationAaron McDonaldenergy_progress
06/29/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
06/29/2026Mechanical SystemsAaron McDonaldspecial
06/29/2026Tenant Protection Plan ComplianceAaron McDonaldspecial
06/29/2026Energy Code Compliance InspectionsAaron McDonaldprogress
Latest 25 of 35.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B01392025-I1Request digital key ↗
09/03/2026B01392025-S1Request digital key ↗
09/03/2026B01392025-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B01392025-I1Open ↗
09/01/2026B01392025-I1Open ↗
09/01/2026B01392025-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B01392025-I1Open ↗
09/03/2026B01392025-S1Open ↗
09/03/2026B01392025-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01402573-I1Open ↗
09/01/2026B01392025-I1Open ↗
09/01/2026B01392025-S1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026B01392025-P2Open ↗
09/03/2026B01392025-I1Open ↗
09/03/2026B01392025-S1Open ↗
Showing 3 of 4 on file for this type