373 DOUGLASS STREET
BROOKLYN · BIN 3019179
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
2,700 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 20 docs
Floor 3Under Construction1p · 1 filing · 20 docs
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOODPOINT CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN H HATHEWAY JR., ARCHITECT406/19/2024
NONE606/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WOODPOINT CONSTRUCTION SEGeneral Contractor507/08/2026
ACCRETE CONSTRUCTION GROUPGeneral Contractor404/09/2026
EJ HOMES 45 LLCGeneral Contractor304/09/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOHN H HATHEWAY JR., ARCH4175406/19/2024
JUST CONSULTING ENGINEERI5865906/14/2024
Building Lifecycle
All (142)Filed (9)Permit Issued (10)Signed Off (3)Violation (10)Objection (80)Special Inspection (30)
08/24/2026
Permit issued — Plumbing
B08012991-S1-PL
11/11/2025
Signed off — Alteration
Propose foundation work type in conjunction with GC application number B08012991-I1.
B08012991-S4
11/10/2025
Signed off — Alteration
Propose foundation work type in conjunction with GC application number B08012991-I1.
B08012991-S2
11/10/2025
Permit issued — Support of Excavation
B08012991-S4-SE
11/07/2025
Permit issued — Foundation
B08012991-S2-FO
11/06/2025
Signed off — Alteration
Propose foundation work type in conjunction with GC application number B08012991-I1.
B08012991-S3
10/14/2025
Permit issued — General Construction
B08012991-I1-GC
06/09/2025
Violation issued (HPD, closed)
A
01/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Hatheway
01/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
John Hatheway
01/16/2025
Special inspection requirement — Subgrade Inspections
XIAOJUN WANG
01/16/2025
Special inspection requirement — Masonry
John Hatheway
01/16/2025
Special inspection requirement — Lighting in dwelling units
John Hatheway
01/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
John Hatheway
01/16/2025
Special inspection requirement — Air barrier - visual inspection
John Hatheway
01/16/2025
Special inspection requirement — Final
John Hatheway
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
John Hatheway
01/16/2025
Special inspection requirement — Protection of exposed foundation insulation
John Hatheway
01/16/2025
Special inspection requirement — Fenestration areas
John Hatheway
01/16/2025
Special inspection requirement — Fenestration air leakage
John Hatheway
01/16/2025
Special inspection requirement — Lighting controls
John Hatheway
01/16/2025
Special inspection requirement — Insulation placement and R values
John Hatheway
01/16/2025
Special inspection requirement — Concrete - Cast-In-Place
John Hatheway
11/27/2024
Violation issued (HPD, closed)
I
10/07/2024
Permit issued — General Construction
B08012991-I1-GC
10/03/2024
Permit issued — Structural
B08012991-S3-ST
08/12/2024
Objection resolved — Addressed
08/12/2024
Objection resolved — Addressed
08/12/2024
Objection resolved — Addressed
07/16/2024
Objection raised — Scope
07/16/2024
Objection raised — Inspections
07/16/2024
Objection raised — Energy
07/12/2024
Objection resolved — Addressed
07/12/2024
Objection resolved — Addressed
06/28/2024
Objection raised — Other
06/28/2024
Objection raised — Scope
06/28/2024
Special inspection requirement — Footing and Foundation
XIAOJUN WANG
06/28/2024
Special inspection requirement — Final
Nathaniel Bergan
06/28/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
JONATHAN BILOW
06/28/2024
Special inspection requirement — Subgrade Inspections
XIAOJUN WANG
06/28/2024
Special inspection requirement — Underpinning
XIAOJUN WANG
06/28/2024
Special inspection requirement — Post-installed Anchors
XIAOJUN WANG
06/28/2024
Special inspection requirement — Concrete - Cast-In-Place
XIAOJUN WANG
06/24/2024
Objection resolved — Addressed
06/24/2024
Special inspection requirement — Underpinning
06/20/2024
Objection raised — Structural
06/19/2024
Filed — Alteration
Propose foundation work type in conjunction with GC application number B08012991-I1.
B08012991-S1
06/14/2024
Filed — Alteration
Propose foundation work type in conjunction with GC application number B08012991-I1.
B08012991-P4
06/03/2024
Permit issued — Structural
B08012991-S3-ST
05/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
John Hatheway
05/29/2024
Special inspection requirement — Fenestration air leakage
John Hatheway
05/29/2024
Special inspection requirement — Lighting controls
John Hatheway
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
John Hatheway
05/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
John Hatheway
05/29/2024
Special inspection requirement — Fenestration areas
John Hatheway
05/24/2024
Objection resolved — Addressed
05/24/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC08/24/2026
DOB NOWSupport of ExcavationSigned-offEJ HOMES 4511/10/2025
DOB NOWFoundationSigned-offEJ HOMES 4511/07/2025
DOB NOWGeneral ConstructionPermit IssuedWOODPOINT CONSTRUCTION SE10/14/2025
DOB NOWGeneral ConstructionPermit IssuedWOODPOINT CONSTRUCTION SE10/07/2024
DOB NOWStructuralSigned-offWOODPOINT CONSTRUCTION SE10/03/2024
DOB NOWStructuralSigned-offWOODPOINT CONSTRUCTION SE06/03/2024
DOB NOWGeneral ConstructionPermit IssuedWOODPOINT CONSTRUCTION SE12/29/2023
DOB NOWFoundationSigned-offACCRETE CONSTRUCTION GROU10/31/2023
DOB NOWSupport of ExcavationSigned-offACCRETE CONSTRUCTION GROU10/18/2023
1 project · most recent 06/19/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/19/2024Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
1 project · most recent 08/06/2025
General Wiring
FiledStatusContractorScope
08/06/2025Permit IssuedAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 06/19/2024
Steel Concrete Masonry
FiledStatusContractorScope
06/19/2024Permit IssuedROCK E SMALL PLBG&HTG INCSteel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
01/16/2025Air barrier - visual inspectionJohn Hathewayenergy_progress
01/16/2025Fenestration areasJohn Hathewayenergy_progress
01/16/2025Lighting in dwelling unitsJohn Hathewayenergy_progress
01/16/2025Lighting controlsJohn Hathewayenergy_progress
01/16/2025Fenestration air leakageJohn Hathewayenergy_progress
01/16/2025Protection of exposed foundation insulationJohn Hathewayenergy_progress
01/16/2025Insulation placement and R valuesJohn Hathewayenergy_progress
01/16/2025Fenestration and door U-factor and product ratingsJohn Hathewayenergy_progress
01/16/2025Concrete - Cast-In-PlaceJohn Hathewayspecial
01/16/2025Fire-Resistant Penetrations and JointsJohn Hathewayspecial
01/16/2025MasonryJohn Hathewayspecial
01/16/2025Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
01/16/2025Subgrade InspectionsXIAOJUN WANGspecial
01/16/2025Energy Code Compliance InspectionsJohn Hathewayprogress
01/16/2025FinalJohn Hathewayprogress
01/16/2025Fire-Resistance Rated ConstructionJohn Hathewayprogress
06/28/2024Post-installed AnchorsXIAOJUN WANGspecial
06/28/2024Footing and FoundationXIAOJUN WANGprogress
06/28/2024FinalNathaniel Berganprogress
06/28/2024Concrete - Cast-In-PlaceXIAOJUN WANGspecial
06/28/2024UnderpinningXIAOJUN WANGspecial
06/28/2024Subsurface Investigations (Borings/Test Pits)JONATHAN BILOWspecial
06/28/2024Subgrade InspectionsXIAOJUN WANGspecial
06/24/2024Underpinning—special
05/29/2024Protection of exposed foundation insulationJohn Hathewayenergy_progress
Latest 25 of 64.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026B08012991-P5Request digital key ↗
08/15/2026B08012991-S1Request digital key ↗
08/15/2026B08012991-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/27/2026B08012991-P5Open ↗
08/15/2026B08012991-I1Open ↗
08/14/2026B08012991-P1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature37
09/01/2026B08012991-I1Open ↗
09/01/2026B08012991-I1Open ↗
09/01/2026B08012991-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/01/2026B08012991-I1Open ↗
09/01/2026B08012991-I1Open ↗
09/01/2026B08012991-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B08012991-I1Open ↗
08/27/2026B08012991-S1Open ↗
08/27/2026B08012991-S2Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B08012991-P5Open ↗
08/15/2026B08012991-S1Open ↗
08/15/2026B08012991-I1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026B08012991-P4Open ↗
08/14/2026B08012991-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B08012991-S2Open ↗
▸Other Documents14
▸DOB NOWPlot Diagram7
08/27/2026B08012991-P5Open ↗
08/15/2026B08012991-I1Open ↗
08/15/2026B08012991-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/27/2026B08012991-P5Open ↗
08/15/2026B08012991-I1Open ↗
08/14/2026B08012991-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/27/2026B08012991-P5Open ↗
08/15/2026B08012991-I1Open ↗
08/14/2026B08012991-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B08012991-S4Open ↗