← Back
Primarily 3 family with 1 store or office
156 5 AVENUE
BROOKLYN · BIN 3019360
💬 Discuss this project
1920Year Built
4Stories
S3Building Class
R6AZoning
4,000 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 156 5 AVE, LLC · 1,800 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 16 docs
Floor 41p · 1 filing · 16 docs
Floor 31p · 1 filing · 16 docs
Floor 22p · 1 filing · 16 docs
Floor 1Under Construction4p · 1 filing · 6 docs
Cellar3p · 1 filing · 6 docs
1 job · most recent 08/16/2026
Ventilation Systems
FiledStatusContractorScope
08/16/2026Permit IssuedALMUNIR CORPVentilation Systems
2 jobs · most recent 08/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/16/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
04/21/2026——Gas, Water/Sanitary
3 jobs · most recent 02/27/2026
General Wiring
FiledStatusContractorScope
02/27/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
11/07/2025CompleteKJK ELECTRIC INCGeneral Wiring
04/24/2025CompleteKJK ELECTRIC INC—
Building Lifecycle
All (83)Filed (10)Permit Issued (9)Signed Off (3)Violation (15)Inspection (3)Objection (13)Special Inspection (30)
09/24/2026
Permit issued — Plumbing
B01432441-S1-PL
08/20/2026
Permit issued — General Construction
B01432441-I1-GC
08/16/2026
Filed — Alteration
The scope of work consists of installing a new ADA toilet, kitchen sinks, and floor drains. Make modifications to the existing gas lines to accommodate the new cooking equipment.
B01432441-S1
08/16/2026
Filed — Alteration
The scope of work consists of installing a new ADA toilet, kitchen sinks, and floor drains. Make modifications to the existing gas lines to accommodate the new cooking equipment.
B01432441-I1
07/16/2026
Special inspection requirement — Final
Mourad Kicha
07/16/2026
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Other
05/13/2026
Violation issued (HPD, closed)
B
04/27/2026
Objection raised — Scope
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Structural
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Admin
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Scope
04/27/2026
Objection resolved — Resolved
04/21/2026
Filed — Alteration
REARRANGEMENT OF TABLES AND SUBMISSION AT THE CELLAR AND FIRSTFLOOR OF AN EXISTING 4-STORY, 3-FAMILY, MIXED-USE BUILDING. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS.
B01378625-S1
04/21/2026
Filed — Alteration
REARRANGEMENT OF TABLES AND SUBMISSION AT THE CELLAR AND FIRSTFLOOR OF AN EXISTING 4-STORY, 3-FAMILY, MIXED-USE BUILDING. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS.
B01378625-I1
03/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/26/2026
Special inspection requirement — Final
12/01/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202971-I1
11/07/2025
Signed off — Alteration
INTERIOR APARTMENT RENOVATIONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202962-I1
11/07/2025
Signed off — Alteration
INSTALLATION OF ELECTRIC FIN-TUBE BASEBOARD HEATERS & ELECTRIC H.W. HEATERS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202968-I1
10/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
10/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
10/14/2025
Special inspection requirement — Maintenance information
AN MA
10/14/2025
Special inspection requirement — Shutoff dampers
AN MA
10/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
10/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
AN MA
10/14/2025
Special inspection requirement — Mechanical Systems
AN MA
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
10/14/2025
Special inspection requirement — Final
AN MA
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
10/14/2025
Special inspection requirement — Final
AN MA
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
10/14/2025
Special inspection requirement — Metering
AN MA
10/14/2025
Special inspection requirement — Lighting in dwelling units
AN MA
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
10/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
10/10/2025
Filed — Alteration
INSTALLATION OF ELECTRIC FIN-TUBE BASEBOARD HEATERS & ELECTRIC H.W. HEATERS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202968-P3
10/10/2025
Filed — Alteration
INTERIOR APARTMENT RENOVATIONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202962-P2
10/10/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01202971-P1
08/11/2025
Special inspection requirement — Lighting in dwelling units
AN MA
08/11/2025
Special inspection requirement — Metering
AN MA
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
08/07/2025
Special inspection requirement — Mechanical Systems
AN MA
08/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
08/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
08/07/2025
Special inspection requirement — Final
AN MA
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
07/14/2025
Permit issued — Mechanical Systems
B01202968-I1-MS
07/14/2025
Permit issued — General Construction
B01202962-I1-GC
07/11/2025
Permit issued — Mechanical Systems
B01202968-I1-MS
Latest 60 of 83 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS2009/25/2026
156 5 AVE203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2025$3.1M—Private party → 156 5 AVE, LLC$781/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK ARCHITECTURE208/16/2026
OAMS ARCHITECTURAL DESIGN P.L.L.C.204/21/2026
AN SHEN MA ARCHITECT610/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAIAN HONEST RENOVATIONGeneral Contractor404/09/2026
NTF MANAGEMENT INCGeneral Contractor204/09/2026
ALMUNIR CORPGeneral Contractor108/21/2026
PLBG P & H INCPlumbing109/25/2026
P.S.I. MECHANICALPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOHAIL HUMAYUN P E INC8457108/16/2026
AN SHEN MA ARCHITECT2968610/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC09/24/2026
DOB NOWGeneral ConstructionPermit IssuedALMUNIR CORP08/20/2026
DOB NOWMechanical SystemsSigned-offNTF MANAGEMENT INC07/14/2025
DOB NOWGeneral ConstructionSigned-offNTF MANAGEMENT INC07/14/2025
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION07/11/2025
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION07/11/2025
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION04/14/2025
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION04/14/2025
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL04/14/2025
BISEQISSUEDANGELO'S CONTRACTING, INC.04/25/1991
BISOTISSUEDANGELO'S CONTRACTING, INC.04/25/1991
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/16/2026FinalMourad Kichaprogress
07/16/2026Mechanical SystemsSOHAIL HUMAYUNspecial
03/27/2026Fire-Resistance Rated Construction—progress
03/26/2026Final—progress
10/14/2025HVAC-R and service water heating equipmentAN MAenergy_progress
10/14/2025HVAC-R and service water heating system controlsAN MAenergy_progress
10/14/2025Maintenance informationAN MAenergy_progress
10/14/2025Shutoff dampersAN MAenergy_progress
10/14/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
10/14/2025Fire-Resistance Rated ConstructionAN MAprogress
10/14/2025Mechanical SystemsAN MAspecial
10/14/2025Energy Code Compliance InspectionsAN MAprogress
10/14/2025FinalAN MAprogress
10/14/2025Fire-Resistant Penetrations and JointsAN MAspecial
10/14/2025Energy Code Compliance InspectionsAN MAprogress
10/14/2025FinalAN MAprogress
10/14/2025Fire-Resistant Penetrations and JointsAN MAspecial
10/14/2025MeteringAN MAenergy_progress
10/14/2025Lighting in dwelling unitsAN MAenergy_progress
10/14/2025Fire-Resistant Penetrations and JointsAN MAspecial
10/14/2025Energy Code Compliance InspectionsAN MAprogress
10/14/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
08/11/2025Lighting in dwelling unitsAN MAenergy_progress
08/11/2025MeteringAN MAenergy_progress
08/08/2025Fire-Resistant Penetrations and JointsAN MAspecial
Latest 25 of 37.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026B01202971-P1Request digital key ↗
08/20/2026B01202971-I1Request digital key ↗
08/20/2026B01202968-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026B01432441-I1Open ↗
08/25/2026B01202971-I1Open ↗
08/25/2026B01202971-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026B01202971-I1Open ↗
08/20/2026B01202971-P1Open ↗
08/20/2026B01202968-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B01432441-I1Open ↗
08/25/2026B01202971-I1Open ↗
08/25/2026B01202962-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B01202971-I1Open ↗
08/20/2026B01202971-P1Open ↗
08/20/2026B01202968-P3Open ↗
Showing 3 of 6 on file for this type