← Back
Two family converted from one family
649 DEGRAW STREET
BROOKLYN · BIN 3019390
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
2,040 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: 649 DEGRAW 123 LLC · 1,609 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 2 filings · 20 docs
Floor 2Under Construction10p · 2 filings · 20 docs
Floor 1Under Construction11p · 2 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
Sub-BasementUnder Construction10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS1207/08/2026
ACE GROUP NY104/09/2026
649 DEGRAW 123 LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2025$1.9M—Private party → 649 DEGRAW 123 LLC$907/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING406/11/2026
VOLUME SPACE CONSULTING INC.103/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor407/08/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252306/11/2026
Building Lifecycle
All (61)Filed (5)Permit Issued (5)Violation (13)Inspection (7)Objection (22)Special Inspection (9)
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
07/29/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
07/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2026
Objection resolved — Addressed
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Other
06/11/2026
Filed — Alteration
LEGALIZE EXISTING EXTENSION AT REAR OF 2-STORY W/BASEMENT & CELLAR 1-FAMILY BUILDING. INTERIOR RENOVATION WITH PARTITIONS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01266034-P1
06/09/2026
Permit issued — Construction Fence
B01361591-I1-FN
06/09/2026
Permit issued — General Construction
B01266034-I1-GC
06/03/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2026
Permit issued — Plumbing
B01344127-I1-PL
04/01/2026
Permit issued — Sidewalk Shed
B01374688-I1-SH
03/25/2026
Violation issued (ECB, closed)
Construction
03/25/2026
Violation issued (ECB, closed)
Construction
03/25/2026
Violation issued (ECB, closed)
Unknown
03/25/2026
Violation issued (ECB, closed)
Unknown
03/25/2026
Violation issued (ECB, closed)
Unknown
03/19/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01374688-I1
02/26/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Structural
02/19/2026
Objection resolved — Addressed
02/18/2026
Filed — Alteration
B01361591-I1
02/12/2026
Permit issued — General Construction
B01266034-I1-GC
02/03/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Plumbing
01/29/2026
Objection raised — Cost
01/12/2026
Filed — Alteration
PLUMBING WORK IN EXISTING 2-STORY WITH BASEMENT AND CELLAR, 1 FAMILY BUILDING IN CONJUNCTION WITH ALT 2 APPLICATION # B01266034. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01344127-I1
01/08/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Energy
08/19/2025
Objection raised — Fire_Protection
08/19/2025
Objection raised — Cost
08/19/2025
Objection raised — Plumbing
08/07/2025
Filed — Alteration
LEGALIZE EXISTING EXTENSION AT REAR OF 2-STORY W/BASEMENT & CELLAR 1-FAMILY BUILDING. INTERIOR RENOVATION WITH PARTITIONS. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
B01266034-I1
06/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
03/11/2024
Violation issued (ECB, closed)
Construction
04/01/2019
Violation issued (HPD, closed)
I
03/28/2019
Violation issued (HPD, closed)
C
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPRECISION HOME DEV INC06/09/2026
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC06/09/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR05/13/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP04/01/2026
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC02/12/2026
1 project · most recent 01/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/12/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
2 projects · most recent 06/17/2026
General Wiring
FiledStatusContractorScope
06/17/2026Permit IssuedSKY ELECTRIC LLCGeneral Wiring
03/18/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 03/19/2026
Sidewalk Shed
FiledStatusContractorScope
03/19/2026Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/03/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/29/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/29/2026Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
07/29/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
07/29/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
01/08/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
01/08/2026Energy Code Compliance InspectionsJICHEN SUNprogress
01/08/2026HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
01/08/2026HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
01/08/2026HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01266034-I1Request digital key ↗
08/19/2026B01344127-I1Request digital key ↗
08/18/2026B01361591-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01266034-I1Open ↗
08/13/2026B01266034-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/21/2026B01266034-I1Open ↗
08/14/2026B01266034-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01266034-P1Open ↗
08/21/2026B01266034-I1Open ↗
08/19/2026B01344127-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01344127-I1Open ↗
08/26/2026B01266034-I1Open ↗
08/26/2026B01266034-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01344127-I1Open ↗
09/02/2026B01344127-I1Open ↗
08/26/2026B01266034-I1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01266034-I1Open ↗
08/13/2026B01266034-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01266034-I1Open ↗
08/19/2026B01344127-I1Open ↗
08/14/2026B01266034-P1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026B01266034-P1Open ↗
08/13/2026B01266034-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01266034-I1Open ↗
08/13/2026B01266034-P1Open ↗