← Back
Four families
751 PRESIDENT STREET
BROOKLYN · BIN 3020212
💬 Discuss this project
1920Year Built
4Stories
C3Building Class
R6BZoning
5,986 sfGross Floor Area
4Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 751 PRESIDENT LLC · 1,940 sf lot · 3.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 2 filings · 20 docs
Floor 4Under Construction5p · 2 filings · 20 docs
Floor 3Under Construction11p · 1 filing · 20 docs
Floor 2Under Construction5p · 1 filing · 15 docs
Floor 1Under Construction6p · 1 filing · 15 docs
CellarUnder Construction18p · 5 filings · 20 docs
1 job · most recent 03/05/2026
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026——Heating and Air Conditioning Systems, Others
Heat / Cool
Mitsubishi Electric PEFY-L48NMAU-A 48,000 BTU · Vrf Indoor ×4
Other
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Condensing Unit ×4
1 job · most recent 07/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/21/2025Signed-offWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
1 job · most recent 07/10/2025
General Wiring
FiledStatusContractorScope
07/10/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
Building Lifecycle
All (132)Filed (8)Permit Issued (8)Signed Off (1)Violation (36)Inspection (1)Objection (48)Special Inspection (30)
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
C
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
A
08/12/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
C
06/08/2026
Violation issued (HPD, open)
C
06/08/2026
Violation issued (HPD, closed)
C
06/08/2026
Violation issued (HPD, open)
C
04/15/2026
Signed off — Alteration
Mechanical ventilation work as shown on plans filed herewith.
B01193078-I1
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Fire_Protection
03/18/2026
Objection raised — Zoning
03/05/2026
Filed — Alteration
Installation of mechanical units as shown on plans filed herewith.
B01367128-I1
03/04/2026
Special inspection requirement — Mechanical Systems
Jeff Akerman
03/04/2026
Special inspection requirement — Maintenance information
Jeff Akerman
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jeff Akerman
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeff Akerman
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jeff Akerman
03/04/2026
Special inspection requirement — Final
Rachel Paskesz
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeff Akerman
03/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
03/02/2026
Special inspection requirement — Final
Jeff Akerman
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeff Akerman
03/02/2026
Special inspection requirement — Air barrier - visual inspection
Jeff Akerman
03/02/2026
Special inspection requirement — Lighting in dwelling units
Jeff Akerman
03/02/2026
Special inspection requirement — Insulation placement and R values
Jeff Akerman
03/02/2026
Special inspection requirement — Fenestration air leakage
Jeff Akerman
02/25/2026
Filed — Alteration
Interior renovation as shown on plans filed herewith.
B01253799-P2
02/25/2026
Special inspection requirement — Fenestration air leakage
Jeff Akerman
02/25/2026
Special inspection requirement — Final
Jeff Akerman
02/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeff Akerman
02/25/2026
Special inspection requirement — Air barrier - visual inspection
Jeff Akerman
02/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeff Akerman
02/25/2026
Special inspection requirement — Lighting in dwelling units
Jeff Akerman
02/25/2026
Special inspection requirement — Insulation placement and R values
Jeff Akerman
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
02/18/2026
Special inspection requirement — Final
Jeff Akerman
02/09/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
12/30/2025
Permit issued — General Construction
B01163043-I1-GC
11/25/2025
Permit issued — General Construction
B01253799-I1-GC
11/24/2025
Permit issued — Mechanical Systems
B01193078-I1-MS
11/24/2025
Permit issued — General Construction
B01253799-I1-GC
11/24/2025
Violation issued (ECB, closed)
Construction
11/19/2025
Violation issued (HPD, closed)
I
11/18/2025
Objection resolved — Addressed
Latest 60 of 132 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
751 PRESIDENT LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/26/2025$3.2M—751 PRESIDENT STREET LLC → 751 PRESIDENT LLC$535/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE803/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEE CONSTRUCTIONS LLCGeneral Contractor907/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312803/05/2026
AZ PROFESSIONAL ENGINEERI766502/25/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC12/30/2025
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC11/25/2025
DOB NOWMechanical SystemsSigned-offBEE CONSTRUCTIONS LLC11/24/2025
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC11/24/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/11/2025
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC08/06/2025
DOB NOWMechanical SystemsSigned-offBEE CONSTRUCTIONS LLC07/22/2025
DOB NOWGeneral ConstructionPermit IssuedBEE CONSTRUCTIONS LLC07/08/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
03/04/2026Mechanical SystemsJeff Akermanspecial
03/04/2026Maintenance informationJeff Akermanenergy_progress
03/04/2026HVAC-R and service water heating system controlsJeff Akermanenergy_progress
03/04/2026HVAC-R and service water piping design and insulationJeff Akermanenergy_progress
03/04/2026HVAC-R and service water heating equipmentJeff Akermanenergy_progress
03/04/2026FinalRachel Paskeszprogress
03/04/2026Energy Code Compliance InspectionsJeff Akermanprogress
03/02/2026Fenestration and door U-factor and product ratingsJeff Akermanenergy_progress
03/02/2026Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
03/02/2026Fire-Resistant Penetrations and JointsJeff Akermanspecial
03/02/2026FinalJeff Akermanprogress
03/02/2026Energy Code Compliance InspectionsJeff Akermanprogress
03/02/2026Fire-Resistance Rated ConstructionJeff Akermanprogress
03/02/2026Air barrier - visual inspectionJeff Akermanenergy_progress
03/02/2026Lighting in dwelling unitsJeff Akermanenergy_progress
03/02/2026Insulation placement and R valuesJeff Akermanenergy_progress
03/02/2026Fenestration air leakageJeff Akermanenergy_progress
02/25/2026Fenestration air leakageJeff Akermanenergy_progress
02/25/2026FinalJeff Akermanprogress
02/25/2026Fire-Resistance Rated ConstructionJeff Akermanprogress
02/25/2026Air barrier - visual inspectionJeff Akermanenergy_progress
02/25/2026Fenestration and door U-factor and product ratingsJeff Akermanenergy_progress
02/25/2026Lighting in dwelling unitsJeff Akermanenergy_progress
02/25/2026Insulation placement and R valuesJeff Akermanenergy_progress
02/25/2026Fire-Resistant Penetrations and JointsJeff Akermanspecial
Latest 25 of 54.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026B01193078-I1Request digital key ↗
08/21/2026B01255445-I1Request digital key ↗
08/20/2026B01163043-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature16
09/29/2026B01367128-I1Open ↗
09/29/2026B01367128-I1Open ↗
09/29/2026B01367128-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026B01367128-I1Open ↗
09/02/2026B01163043-P1Open ↗
09/02/2026B01163043-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026B01193078-I1Open ↗
08/20/2026B01163043-P1Open ↗
08/20/2026B01163043-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026B01193078-I1Open ↗
08/20/2026B01163043-I1Open ↗
08/20/2026B01163043-P1Open ↗
Showing 3 of 8 on file for this type