← Back
Four families
634 PRESIDENT STREET
BROOKLYN · BIN 3020242
💬 Discuss this project
1920Year Built
4Stories
C3Building Class
R6BZoning
3,060 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · 1,387 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 45p · 1 filing · 8 docs
Floor 3
Floor 2
Floor 15p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY707/08/2026
NETDT807/08/2026
OWNER OF 634 PRESIDENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/16/2024$2.9M—634 PRESIDENT STREET BROOKLYN LLC → Private party$948/sf building
07/22/2021$2.0M—Private party → 634 PRESIDENT STREET BROOKLYN LLC$664/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP211/11/2024
NY BUILDING ASSOCIATES INC104/30/2024
MSM ENGINEERING SERVICES, PLLC203/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NETDT403/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES NY INCGeneral Contractor207/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
NAIM CONSTRUCTION LLCGeneral Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244104/30/2024
Building Lifecycle
All (82)Filed (5)Permit Issued (5)Signed Off (3)Violation (60)Inspection (3)Special Inspection (6)
02/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
05/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01037544-I1
04/03/2025
Permit issued — Plumbing
B01135664-S1-PL
03/18/2025
Signed off — Alteration
B01023816-I1
03/11/2025
Permit issued — General Construction
B01135664-I1-GC
03/10/2025
Signed off — Alteration
B01023807-I1
11/26/2024
Violation issued (HPD, closed)
I
11/11/2024
Filed — Alteration
1. REPLACE EXISTING BATHROOM FIXTURES, GAS STOVE AND KITCHEN SINK IN THE 1ST FLOOR. 2. REPLACE EXISTING BATHROOM FIXTURES, GAS STOVE IN THE 4TH FLOOR.
B01135664-I1
11/11/2024
Filed — Alteration
1. REPLACE EXISTING BATHROOM FIXTURES, GAS STOVE AND KITCHEN SINK IN THE 1ST FLOOR. 2. REPLACE EXISTING BATHROOM FIXTURES, GAS STOVE IN THE 4TH FLOOR.
B01135664-S1
10/31/2024
Special inspection requirement — Final
Eric Foster
10/09/2024
Violation issued (ECB, closed)
Construction
10/09/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Permit issued — Solar
B01037544-I1-SL
04/30/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01037544-I1
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/17/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/17/2024
Special inspection requirement — Final
NARESH MAHANGU
04/17/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/11/2024
Violation issued (HPD, closed)
A
03/22/2024
Filed — Alteration
B01023816-I1
03/22/2024
Filed — Alteration
B01023807-I1
03/22/2024
Permit issued — Sidewalk Shed
B01023807-I1-SH
03/22/2024
Permit issued — Supported Scaffold
B01023816-I1-SF
06/29/2023
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (HPD, closed)
C
06/29/2023
Violation issued (HPD, closed)
A
03/24/2023
Violation issued (HPD, closed)
A
09/05/2022
Violation issued (HPD, closed)
C
03/23/2022
Violation issued (HPD, closed)
A
03/23/2022
Violation issued (HPD, closed)
A
03/23/2022
Violation issued (HPD, closed)
A
03/23/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/28/2017
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
01/07/2008
Violation issued (HPD, closed)
B
12/31/2007
Violation issued (ECB, closed)
HPD
12/02/2007
Violation issued (HPD, closed)
C
12/02/2007
Violation issued (HPD, closed)
B
12/02/2007
Violation issued (HPD, closed)
C
12/02/2007
Violation issued (HPD, closed)
C
12/02/2007
Violation issued (HPD, closed)
B
12/02/2007
Violation issued (HPD, closed)
A
12/02/2007
Violation issued (HPD, closed)
A
05/02/2003
Violation issued (HPD, closed)
B
04/27/1998
Violation issued (ECB, open)
Construction
05/05/1994
Violation issued (HPD, closed)
B
05/05/1994
Violation issued (HPD, closed)
A
09/20/1989
Violation issued (HPD, closed)
B
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN04/03/2025
DOB NOWGeneral ConstructionPermit IssuedNAIM CONSTRUCTION LLC03/11/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC05/07/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC03/22/2024
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC03/22/2024
3 projects · most recent 09/26/2024
FiledStatusContractorScope
09/26/2024CompleteADAM ELECL CONTRNG LLC—
04/17/2024CompleteBROOKYLN SOLARWORKS, LLC—
03/22/2024Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/31/2024FinalEric Fosterprogress
04/17/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/17/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/17/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/17/2024FinalNARESH MAHANGUprogress
04/17/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01023807-I1Request digital key ↗
08/25/2026B01023816-I1Request digital key ↗
08/25/2026B01037544-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B01023807-I1Open ↗
08/23/2026B01135664-S1Open ↗
08/23/2026B01135664-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026B01135664-I1Open ↗
09/19/2026B01037544-I1Open ↗
09/19/2026B01037544-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/19/2026B01037544-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B01135664-S1Open ↗
08/23/2026B01135664-I1Open ↗
08/13/2026B01037544-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01037544-I1Open ↗