← Back
Three families
244 6 AVENUE
BROOKLYN · BIN 3020462
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,516 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,729 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERNST ARCHITECT PLLC301/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERNST ARCHITECT, PLLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERNST ARCHITECT, PLLC1005301/21/2022
Building Lifecycle
All (19)Filed (3)Permit Issued (1)Signed Off (1)Violation (11)Inspection (3)
03/20/2023
Violation issued (HPD, closed)
A
05/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2022
Signed off — Alteration
Installation of (1) new gas dryer and associated piping and venting. Meter in Cellar, and riser from Cellar to 1st Floor.
B00635449-I1
02/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2022
Violation issued (ECB, closed)
Plumbing
02/11/2022
Violation issued (ECB, closed)
Plumbing
01/21/2022
Filed — Alteration
Installation of (1) new gas dryer and associated piping and venting. Meter in Cellar, and riser from Cellar to 1st Floor.
B00635449-P2
01/11/2022
Filed — Alteration
Installation of (1) new gas dryer and associated piping and venting. Meter in Cellar, and riser from Cellar to 1st Floor.
B00635449-P1
01/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/04/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/15/2021
Permit issued — Plumbing
B00635449-I1-PL
11/30/2021
Filed — Alteration
Installation of (1) new gas dryer and associated piping and venting. Meter in Cellar, and riser from Cellar to 1st Floor.
B00635449-I1
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
09/23/2009
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC12/15/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/20/2022Fire-Resistant Penetrations and JointsTodd Ernstspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00635449-I1Request digital key ↗
08/15/2026B00635449-P2Request digital key ↗
08/14/2026B00635449-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00635449-P2Open ↗
08/31/2026B00635449-P1Open ↗
08/31/2026B00635449-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00635449-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00635449-I1Open ↗
08/15/2026B00635449-P2Open ↗
08/14/2026B00635449-P1Open ↗