← Back
Four families
248 6 AVENUE
BROOKLYN · BIN 3020464
💬 Discuss this project
1930Year Built
3Stories
C3Building Class
R6BZoning
2,715 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Four families · 1,883 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB205/15/2026
E4P CONSULTING ENGINEERING PLLC205/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE CITY CONSTRUCTIONGeneral Contractor509/13/2026
PETRI PBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HT ENGINEERING, PLLC6274205/17/2024
Building Lifecycle
All (4)Filed (4)
05/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01402855-I1
04/21/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01387748-I1
05/17/2024
Filed — Alteration
Replacement of gas piping (gas meter to boiler and gas meter to 1str Flr. riser) along with replacement of boiler (gas combi- boiler) as per plans filed herewith. No change in use, egress or occupancy.
B00994607-P1
02/22/2024
Filed — Alteration
Replacement of gas piping (gas meter to boiler and gas meter to 1str Flr. riser) along with replacement of boiler (gas combi- boiler) as per plans filed herewith. No change in use, egress or occupancy.
B00994607-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION09/11/2026
DOB NOWSidewalk ShedPermit IssuedEMPIRE CITY CONSTRUCTION09/11/2026
DOB NOWSidewalk ShedSigned-offEMPIRE CITY CONSTRUCTION08/04/2026
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION05/18/2026
DOB NOWSidewalk ShedSigned-offEMPIRE CITY CONSTRUCTION04/22/2026
DOB NOWPlumbingSigned-offPETRI PBG & HTG INC03/06/2024
BISOTISSUEDS. DIGIACOMO & SONS12/30/1998
BISPLISSUEDBAY RIDGE MECHICAL CORP09/29/1998
BISOTISSUEDS. DIGIACOMO & SONS09/16/1998
1 project · most recent 05/17/2024
Gas
FiledStatusContractorScope
05/17/2024Signed-offPETRI PBG & HTG INCGas
1 project · most recent 04/15/2026
FiledStatusContractorScope
04/15/2026Permit IssuedRICHARD NEU—
2 projects · most recent 05/15/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/15/2026Signed-offEMPIRE CITY CONSTRUCTIONScaffold
04/21/2026Permit IssuedEMPIRE CITY CONSTRUCTIONSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/20/2024Fire-Resistant Penetrations and JointsHENRY TORRESspecial
05/20/2024Energy Code Compliance InspectionsHENRY TORRESprogress
05/20/2024HVAC-R and service water heating system controlsHENRY TORRESenergy_progress
05/20/2024HVAC-R and service water piping design and insulationHENRY TORRESenergy_progress
05/20/2024Maintenance informationHENRY TORRESenergy_progress
05/20/2024HVAC-R and service water heating equipmentHENRY TORRESenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B00994607-P1Request digital key ↗
08/25/2026B00994607-I1Request digital key ↗
08/17/2026B01387748-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B00994607-P1Open ↗
08/25/2026B00994607-I1Open ↗
08/17/2026B01387748-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00994607-I1Open ↗
09/01/2026B00994607-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00994607-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B00994607-P1Open ↗
08/25/2026B00994607-I1Open ↗