Walk-up cooperative
299 6 AVENUE
BROOKLYN · BIN 3020866
💬 Discuss this project
1921Year Built
4Stories
C6Building Class
R6BZoning
4,800 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 299 SIXTH AVE HOUSING CO · 1,735 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
299 SIXTH AVE HOUSING CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSH GOLDSTEIN ARCHITECT308/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EAB ENGINEERING PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AUSTIN PLBG & HTG CO.INCPlumbing207/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
NY PLUMBING PROSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSH GOLDSTEIN ARCHITECT3814308/22/2022
Building Lifecycle
All (17)Filed (3)Permit Issued (2)Signed Off (1)Violation (3)Inspection (4)Objection (2)Special Inspection (2)
11/09/2022
Violation issued (HPD, closed)
I
11/01/2022
Signed off — Alteration
remove one w/m in 1st floor. install one shower and replace one lav in 1st floor, install one wc, one lav and one w/m in cellar
B00390309-I1
08/22/2022
Filed — Alteration
remove one w/m in 1st floor. install one shower and replace one lav in 1st floor, install one wc, one lav and one w/m in cellar
B00390309-P2
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSH GOLDSTEIN
08/16/2022
Special inspection requirement — HVAC insulation and sealing
JOSH GOLDSTEIN
08/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/19/2022
Permit issued — Plumbing
B00390309-I1-PL
05/18/2022
Objection resolved — Addressed
05/13/2022
Objection raised — Other
05/09/2022
Filed — Alteration
remove one w/m in 1st floor. install one shower and replace one lav in 1st floor, install one wc, one lav and one w/m in cellar
B00390309-P1
12/21/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/21/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2021
Permit issued — Plumbing
B00390309-I1-PL
07/21/2021
Filed — Alteration
remove one w/m in 1st floor. install one shower and replace one lav in 1st floor, install one wc, one lav and one w/m in cellar
B00390309-I1
04/05/2021
Violation issued (HPD, closed)
A
10/04/1996
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAUSTIN PLBG & HTG CO.INC07/19/2022
DOB NOWPlumbingSigned-offAUSTIN PLBG & HTG CO.INC10/22/2021
BISOTISSUEDTCS CONSTRUCTION CORP10/18/2021
BISBLISSUEDVIGILANTE CONTRACTING09/28/1995
BISPLISSUEDVIGILANTE CONTRACTING09/28/1995
1 project · most recent 07/21/2022
General Wiring
FiledStatusContractorScope
07/21/2022CompleteFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/21/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/16/2022Fire-Resistant Penetrations and JointsJOSH GOLDSTEINspecial
08/16/2022HVAC insulation and sealing JOSH GOLDSTEINenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00390309-P2Request digital key ↗
09/01/2026B00390309-I1Request digital key ↗
08/15/2026B00390309-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
02/08/2022340755338Open ↗
01/28/2021340755338Open ↗
01/25/2021340755338Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
10/18/2021340755338Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00390309-P2Open ↗
08/13/2026B00390309-P1Open ↗
08/13/2026B00390309-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/25/2021340755338Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00390309-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00390309-P2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026B00390309-P1Open ↗
08/13/2026B00390309-P2Open ↗
08/13/2026B00390309-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
07/20/2021340755338Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00390309-P1Open ↗
08/13/2026B00390309-P2Open ↗
08/13/2026B00390309-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/28/2020340755338Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/10/2022340755338Open ↗
11/10/2022340755338Open ↗
10/15/2021340755338Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/17/2022340755338Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00390309-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/10/2022340755338Open ↗
11/10/2022340755338Open ↗
10/15/2021340755338Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/14/2022340755338Open ↗
11/10/2022340755338Open ↗
07/08/2022340755338Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/18/2022340755338Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
11/10/2022340755338Open ↗
08/28/2020340755338Open ↗
▸BISEMERGENCY RESPONSE AGENCIES C/O NOTIFICATION AFFIDAVIT1
11/10/2022340755338Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
11/10/2022340755338Open ↗
07/08/2022340755338Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/25/2021340755338Open ↗