← Back
Two family converted from one family
430 5 STREET
BROOKLYN · BIN 3021485
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
2,355 sfGross Floor Area
2Units
Two family converted from one family · 1,775 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 3 filings · 15 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar2p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2016$2.2M—Private party → Private party$955/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUDRA MANZANO ARCHITECT PLLC305/17/2023
KCE CONSULTING ENGINEERING PLLC111/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNCHRON EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NO LIMIT CONTRACTING INCGeneral Contractor807/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712111/17/2021
Building Lifecycle
All (19)Filed (4)Permit Issued (5)Signed Off (3)Inspection (3)Special Inspection (4)
07/20/2023
Signed off — Alteration
Plumbing work related to the renovation of an existing duplex apartment on the 1st and 2nd floors in an existing two-family residence.
B00578518-I1
07/20/2023
Signed off — Alteration
General construction related to the renovation of an existing duplex apartment on the 1st and 2nd floors in an existing two-family residence. Work to include creating a new configuration for the 1st and 2nd floor rear windows as well as relocating/new sky
B00578493-I1
05/17/2023
Filed — Alteration
Plumbing work related to the renovation of an existing duplex apartment on the 1st and 2nd floors in an existing two-family residence.
B00578518-P1
05/01/2023
Permit issued — General Construction
B00578493-I1-GC
10/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2022
Signed off — Alteration
B00578521-I1
07/18/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/14/2022
Permit issued — General Construction
B00578493-I1-GC
03/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2022
Permit issued — Plumbing
B00578518-I1-PL
11/26/2021
Permit issued — Structural
B00578521-I1-ST
11/19/2021
Permit issued — General Construction
B00578493-I1-GC
11/17/2021
Filed — Alteration
B00578521-I1
11/10/2021
Filed — Alteration
Plumbing work related to the renovation of an existing duplex apartment on the 1st and 2nd floors in an existing two-family residence.
B00578518-I1
09/22/2021
Filed — Alteration
General construction related to the renovation of an existing duplex apartment on the 1st and 2nd floors in an existing two-family residence. Work to include creating a new configuration for the 1st and 2nd floor rear windows as well as relocating/new sky
B00578493-I1
09/14/2021
Special inspection requirement — Lighting controls
AUDRA MANZANO
09/14/2021
Special inspection requirement — Interior lighting power
AUDRA MANZANO
09/14/2021
Special inspection requirement — Energy Code Compliance Inspections
AUDRA MANZANO
09/14/2021
Special inspection requirement — Final
AUDRA MANZANO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNO LIMIT CONTRACTING INC05/01/2023
DOB NOWGeneral ConstructionSigned-offNO LIMIT CONTRACTING INC04/14/2022
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC03/22/2022
DOB NOWStructuralSigned-offNO LIMIT CONTRACTING INC11/26/2021
DOB NOWGeneral ConstructionSigned-offNO LIMIT CONTRACTING INC11/19/2021
1 project · most recent 04/20/2023
General Wiring
FiledStatusContractorScope
04/20/2023CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/14/2021Lighting controlsAUDRA MANZANOenergy_progress
09/14/2021Interior lighting powerAUDRA MANZANOenergy_progress
09/14/2021Energy Code Compliance InspectionsAUDRA MANZANOprogress
09/14/2021FinalAUDRA MANZANOprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00578493-I1Request digital key ↗
08/31/2026B00578521-I1Request digital key ↗
08/27/2026B00578518-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00578493-I1Open ↗
08/31/2026B00578521-I1Open ↗
08/27/2026B00578518-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B00578493-I1Open ↗
08/22/2026B00578493-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00578493-I1Open ↗
08/31/2026B00578521-I1Open ↗
08/27/2026B00578518-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00578493-I1Open ↗