← Back
Over six families without stores
484 3 AVENUE
BROOKLYN · BIN 3022434
💬 Discuss this project
1940Year Built
4Stories
C1Building Class
M2-1Zoning
6,400 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: BHAWAN 484 REALTY LLC · 2,267 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BHAWAN REALTY507/08/2026
BHAWAN 484 REALTY LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2021$1.4M—— → —$219/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G R RESTIVO AIA205/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARC HI TECT ASSOCIATE INCGeneral Contractor303/21/2026
MARIO TIRROElectrical103/21/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MELDAN GROUP LLC8100205/03/2022
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Signed Off (2)Violation (13)Inspection (4)Objection (2)Special Inspection (1)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
B
04/03/2024
Violation issued (HPD, closed)
A
03/19/2024
Violation issued (HPD, open)
A
03/19/2024
Violation issued (HPD, closed)
C
03/19/2024
Violation issued (HPD, closed)
B
03/19/2024
Violation issued (HPD, open)
A
03/19/2024
Violation issued (HPD, open)
A
06/09/2023
Signed off — Alteration
B00725459-I1
06/09/2023
Signed off — Alteration
New 3-piece bathroom, relocate kitchen from the rear to the middle of apartment and renovate existing bathroom at the rear of the building.
B00725465-I1
05/31/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2023
Violation issued (HPD, closed)
A
12/20/2022
Permit issued — Plumbing
B00725465-I1-PL
12/08/2022
Permit issued — Mechanical Systems
B00725459-I1-GC-CX
05/10/2022
Objection raised — Admin
05/10/2022
Objection resolved — Addressed
05/03/2022
Filed — Alteration
B00725459-I1
05/03/2022
Filed — Alteration
New 3-piece bathroom, relocate kitchen from the rear to the middle of apartment and renovate existing bathroom at the rear of the building.
B00725465-I1
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Reid
03/18/2022
Violation issued (ECB, closed)
Unknown
03/18/2022
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN12/20/2022
DOB NOWMechanical SystemsSigned-offARC HI TECT ASSOCIATE INC12/08/2022
BISFBISSUEDAPPROVED OIL OF BKLYN,INC11/15/2007
2 projects · most recent 08/29/2023
General Wiring
FiledStatusContractorScope
08/29/2023CompleteGREEN POWER ELECTRIC CORP9 meters, 9 new_meters
03/22/2022CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/27/2022Fire-Resistant Penetrations and JointsJeffrey Reidspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026B00725465-I1Request digital key ↗
08/14/2026B00725459-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
11/15/2007310058068Open ↗
11/15/2007310058068Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/29/2026B00725459-I1Open ↗
08/13/2026B00725465-I1Open ↗
▸BISPC FULL REPORT1
11/15/2007310058068Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/15/2007310058068Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/15/2007310058068Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/15/2007310058068Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00725465-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/15/2007310058068Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026B00725459-I1Open ↗
08/13/2026B00725465-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/15/2007310058068Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
11/15/2007310058068Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
11/15/2007310058068Open ↗