| Firm | Filings | Most Recent |
|---|---|---|
| BOWERBIRD ARCHITECT, PLLC | 2 | 06/26/2026 |
| GASBARRO STRUCTURAL ENGINEERING | 2 | 08/11/2025 |
| ALL CITY ENGINEERING, P.C. | 2 | 05/13/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| BMB BUILDING CONSULTING | 10 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/26/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM42NAMHZ2 42,000 BTU · Heat Pump Outdoor ×1 MXZ-SM48NAMHZ2 48,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/26/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/26/2026 | — | — | Steel, Masonry, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/28/2026 | Energy Code Compliance Inspections | — | progress |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/28/2026 | Maintenance information | — | energy_progress |
| 04/28/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 04/28/2026 | Air barrier - visual inspection | — | energy_progress |
| 04/28/2026 | Insulation placement and R values | — | energy_progress |
| 04/28/2026 | Fire-Resistance Rated Construction | — | progress |
| 04/28/2026 | Final | — | progress |
| 04/28/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/28/2026 | Fenestration areas | — | energy_progress |
| 04/28/2026 | Fenestration air leakage | — | energy_progress |
| 04/28/2026 | Permanent certificate | — | energy_progress |
| 04/28/2026 | Interior lighting power | — | energy_progress |
| 08/05/2025 | Wood – Seismic Resistance | — | special |
| 02/20/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 02/20/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 02/20/2025 | Maintenance information | — | energy_progress |
| 02/20/2025 | Energy Code Compliance Inspections | — | progress |
| 02/20/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 02/20/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 02/16/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 02/16/2025 | Masonry | — | special |
| 02/16/2025 | Structural Cold-Formed Steel | — | special |
| 02/16/2025 | Structural Steel - Details | — | special |
| 02/16/2025 | Construction Utilizing CLT or SCL, Type IV | — | special |