General warehouse
63 15 STREET
BROOKLYN · BIN 3023589
💬 Discuss this project
1931Year Built
1Stories
E1Building Class
M2-1Zoning
2,750 sfGross Floor Area
1Units
General warehouse · Owner of record: SPB 15TH ST REALTY LLC · 2,750 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
2 jobs · most recent 10/19/2023
General Wiring
FiledStatusContractorScope
10/19/2023CompleteBROOKYLN SOLARWORKS, LLC—
01/25/2023CompletePRO ELECTRIC CORP.General Wiring
Building Lifecycle
All (49)Filed (5)Permit Issued (6)Signed Off (4)Inspection (4)Special Inspection (30)
07/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2024
Signed off — Alteration
REINFORCE/REPAIR FRONT WALL. RELOCATE TOILET. RAISE ROOF WITH STEEL BEAMS AND CONCRETE SLAB ON METAL DECK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00820687-I1
01/11/2024
Permit issued — Structural
B00820687-I1-FO
01/11/2024
Permit issued — Structural
B00820687-I1-ST
01/10/2024
Filed — Alteration
REINFORCE/REPAIR FRONT WALL. RELOCATE TOILET. RAISE ROOF WITH STEEL BEAMS AND CONCRETE SLAB ON METAL DECK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00820687-P2
01/10/2024
Special inspection requirement — Fenestration air leakage
Harry Hong
01/10/2024
Special inspection requirement — Concrete - Cast-In-Place
Harry Hong
01/10/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Harry Hong
01/10/2024
Special inspection requirement — Structural Steel - Welding
Harry Hong
01/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Harry Hong
01/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
01/10/2024
Special inspection requirement — Structural Cold-Formed Steel
Harry Hong
01/10/2024
Special inspection requirement — Structural Steel - Details
Harry Hong
01/10/2024
Special inspection requirement — Subgrade Inspections
Harry Hong
01/10/2024
Special inspection requirement — Masonry
Harry Hong
01/10/2024
Special inspection requirement — Footing and Foundation
Harry Hong
01/10/2024
Special inspection requirement — Final
Harry Hong
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Harry Hong
01/10/2024
Special inspection requirement — Insulation placement and R values
Harry Hong
01/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Harry Hong
01/10/2024
Special inspection requirement — Metering
Harry Hong
01/10/2024
Special inspection requirement — Fenestration areas
Harry Hong
01/10/2024
Special inspection requirement — Lighting controls
Harry Hong
01/10/2024
Special inspection requirement — Interior lighting power
Harry Hong
01/09/2024
Signed off — Alteration
RELOCATE TOILET, INSTALL FLOOR DRAINS, ROOF DRAINS FOR AN EXISTING MANUFACTURER. NO CHANGE IN USE AND OCCUPANCY.
B00820632-I1
01/09/2024
Special inspection requirement — Concrete - Cast-In-Place
Harry Hong
01/09/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Harry Hong
01/09/2024
Special inspection requirement — Masonry
Harry Hong
01/09/2024
Special inspection requirement — Structural Cold-Formed Steel
Harry Hong
01/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
01/09/2024
Special inspection requirement — Structural Steel - Details
Harry Hong
01/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Harry Hong
01/09/2024
Special inspection requirement — Structural Steel - Welding
Harry Hong
01/09/2024
Special inspection requirement — Subgrade Inspections
Harry Hong
01/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Harry Hong
01/09/2024
Special inspection requirement — Final
Harry Hong
01/08/2024
Signed off — Alteration
B00818692-I1
11/21/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00834297-I1
06/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2023
Permit issued — Plumbing
B00820632-I1-PL
04/11/2023
Filed — Alteration
RELOCATE TOILET, INSTALL FLOOR DRAINS, ROOF DRAINS FOR AN EXISTING MANUFACTURER. NO CHANGE IN USE AND OCCUPANCY.
B00820632-I1
03/06/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00834297-I1
03/06/2023
Permit issued — Sidewalk Shed
B00834297-I1-SH
02/07/2023
Permit issued — Foundation
B00820687-I1-GC
02/06/2023
Permit issued — Construction Fence
B00818692-I1-FN
02/02/2023
Filed — Alteration
REINFORCE/REPAIR FRONT WALL. RELOCATE TOILET. RAISE ROOF WITH STEEL BEAMS AND CONCRETE SLAB ON METAL DECK. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00820687-I1
01/27/2023
Filed — Alteration
B00818692-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H2 CONSULTING PE PC401/10/2024
FL&M ENGINEERING DESIGN &INSPECTION103/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H2 CONSULTING PE PC803/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SALVATORE BASILE II INCGeneral Contractor803/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
JOHN'S PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H2 CONSULTING PE PC835201/10/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSALVATORE BASILE II INC01/11/2024
DOB NOWStructuralSigned-offSALVATORE BASILE II INC01/11/2024
DOB NOWPlumbingSigned-offG.A. PLBG & HTG INC04/13/2023
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP03/06/2023
DOB NOWFoundationSigned-offSALVATORE BASILE II INC02/07/2023
DOB NOWConstruction FenceSigned-offSALVATORE BASILE II INC02/06/2023
BISOTISSUEDBROOKLYN SOLARWORKS LLC08/31/2023
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/09/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
01/10/2024Fenestration air leakageHarry Hongenergy_progress
01/10/2024Concrete - Cast-In-PlaceHarry Hongspecial
01/10/2024Construction Operations Influencing Adjacent StructuresHarry Hongspecial
01/10/2024Structural Steel - WeldingHarry Hongspecial
01/10/2024Structural Steel - High Strength BoltingHarry Hongspecial
01/10/2024Structural Stability – Alterations of existing buildingsHarry Hongspecial
01/10/2024Structural Cold-Formed SteelHarry Hongspecial
01/10/2024Structural Steel - DetailsHarry Hongspecial
01/10/2024Subgrade InspectionsHarry Hongspecial
01/10/2024MasonryHarry Hongspecial
01/10/2024Footing and FoundationHarry Hongprogress
01/10/2024FinalHarry Hongprogress
01/10/2024Energy Code Compliance InspectionsHarry Hongprogress
01/10/2024Insulation placement and R valuesHarry Hongenergy_progress
01/10/2024Fenestration and door U-factor and product ratingsHarry Hongenergy_progress
01/10/2024MeteringHarry Hongenergy_progress
01/10/2024Fenestration areasHarry Hongenergy_progress
01/10/2024Lighting controlsHarry Hongenergy_progress
01/10/2024Interior lighting powerHarry Hongenergy_progress
01/09/2024Concrete - Cast-In-PlaceHarry Hongspecial
01/09/2024Construction Operations Influencing Adjacent StructuresHarry Hongspecial
01/09/2024MasonryHarry Hongspecial
01/09/2024Structural Cold-Formed SteelHarry Hongspecial
01/09/2024Structural Stability – Alterations of existing buildingsHarry Hongspecial
01/09/2024Structural Steel - DetailsHarry Hongspecial
Latest 25 of 38.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00818692-I1Request digital key ↗
08/27/2026B00820687-P2Request digital key ↗
08/27/2026B00820687-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/27/2023340894205Open ↗
▸BISWORK PERMIT APPLICATION1
08/31/2023340894205Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature20
08/26/2026B00820687-P2Open ↗
08/26/2026B00820687-P2Open ↗
08/26/2026B00820687-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
08/26/2026B00820687-P2Open ↗
08/26/2026B00820687-P2Open ↗
08/26/2026B00820687-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00818692-I1Open ↗
08/27/2026B00820687-P2Open ↗
08/27/2026B00820687-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/27/2023340894205Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/29/2023340894205Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
08/30/2023340894205Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00820687-I1Open ↗
08/27/2026B00820687-P2Open ↗
08/27/2026B00820632-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/27/2023340894205Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/27/2024340894205Open ↗
08/30/2023340894205Open ↗
08/30/2023340894205Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/29/2023340894205Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/27/2024340894205Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
02/29/2024340894205Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/27/2023340894205Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/27/2024340894205Open ↗
08/30/2023340894205Open ↗
08/30/2023340894205Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/29/2024340894205Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/29/2024340894205Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/27/2024340894205Open ↗
07/27/2023340894205Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/29/2023340894205Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/27/2023340894205Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00820687-P2Open ↗
08/13/2026B00820687-I1Open ↗