← Back
Five to six families
167 15 STREET
BROOKLYN · BIN 3023686
💬 Discuss this project
1925Year Built
3Stories
C2Building Class
R6BZoning
4,950 sfGross Floor Area
6Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Five to six families · 2,517 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (28)Filed (2)Permit Issued (2)Signed Off (2)Violation (17)Inspection (3)Special Inspection (2)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
07/17/2024
Signed off — Alteration
CONNECT REPLACEMENT BOILER TO GAS LINE AND NEW GAS METER AND REGISTER 2 HWHS. REPLACEMENT BOILER FILED UNDER SEPARATE APPLICATION. PROVIDE GAS TEST TO BOILER, HOT WATER HEATERS AND GAS COOKING ON 1ST FL. NO CHANGE IN USE EGRESS OR OCCUP.
B01003828-I1
07/16/2024
Signed off — Alteration
B01003827-I1
07/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2024
Permit issued — Boiler Equipment
B01003827-I1-BE
04/18/2024
Permit issued — Plumbing
B01003828-I1-PL
04/03/2024
Violation issued (HPD, closed)
A
04/02/2024
Filed — Alteration
CONNECT REPLACEMENT BOILER TO GAS LINE AND NEW GAS METER AND REGISTER 2 HWHS. REPLACEMENT BOILER FILED UNDER SEPARATE APPLICATION. PROVIDE GAS TEST TO BOILER, HOT WATER HEATERS AND GAS COOKING ON 1ST FL. NO CHANGE IN USE EGRESS OR OCCUP.
B01003828-I1
04/02/2024
Filed — Alteration
B01003827-I1
02/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
03/20/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2016
Violation issued (HPD, closed)
I
11/14/2015
Violation issued (HPD, open)
B
10/06/2015
Violation issued (HPD, closed)
I
04/24/2014
Violation issued (HPD, open)
B
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/1993
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.204/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JERRY'S PLBG & HVAC INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947204/02/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJERRY'S PLBG & HVAC INC04/18/2024
DOB NOWPlumbingSigned-offJERRY'S PLBG & HVAC INC04/18/2024
BISPLISSUEDPAT MCCANN P&H INC09/07/2010
BISOTISSUEDDLM CONTRACTORS INC02/01/2010
BISBLISSUEDPAT MCCANN P&H INC03/19/2009
BISPLISSUEDPAT MCCANN P&H INC03/19/2009
BISOTISSUEDUNITED INDUSTRIES & CONST02/13/2009
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/10/2024Fire-Resistant Penetrations and JointsGregory Perottospecial
02/10/2024Tenant Protection Plan ComplianceGregory Perottospecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01003827-I1Request digital key ↗
08/25/2026B01003828-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION5
09/10/2010310154070Open ↗
02/01/2010310154070Open ↗
03/19/2009310154070Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/24/2009310154070Open ↗
06/18/2008310154070Open ↗
▸Seals & Professional Certifications6
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/18/2008310154070Open ↗
06/18/2008310154070Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B01003827-I1Open ↗
08/13/2026B01003828-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01003828-I1Open ↗
08/23/2026B01003828-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
06/26/2009310154070Open ↗
06/18/2008310154070Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/18/2008310154070Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B01003827-I1Open ↗
08/13/2026B01003828-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/18/2008310154070Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
06/18/2008310154070Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/18/2008310154070Open ↗