Miscellaneous one family
263 15 STREET
BROOKLYN · BIN 3023730
💬 Discuss this project
1899Year Built
2Stories
A9Building Class
R6BZoning
1,100 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous one family · 1,523 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2017$1.8M—— → —$1,614/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROMIT GAJJAR303/11/2022
KCE CONSULTING ENGINEERING PLLC511/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NO LIMIT CONTRACTING INCGeneral Contractor807/08/2026
ARCO PLBG AND HTG INCPlumbing507/08/2026
WCK ELECTRIC CORP 002413General Contractor203/22/2026
FRANCIS CAPORALEElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712511/10/2021
Building Lifecycle
All (83)Filed (8)Permit Issued (5)Signed Off (4)Violation (4)Inspection (4)Objection (52)Special Inspection (6)
03/24/2022
Signed off — Alteration
PLUMBING WORK FOR A ONE-FAMILY BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00530116-I1
03/15/2022
Signed off — Alteration
B00530082-I1
03/11/2022
Filed — Alteration
PLUMBING WORK FOR A ONE-FAMILY BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00530116-P1
03/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/15/2021
Signed off — Alteration
STRUCTURAL RENOVATION WORK ONLY AT AN EXISTING 2 STORY RESIDENTIAL BUILDING WITH ATTIC AND CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00569370-I1
12/15/2021
Signed off — Alteration
STRUCTURAL RENOVATION WORK ONLY AT AN EXISTING 2 STORY RESIDENTIAL BUILDING WITH ATTIC AND CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00569370-S1
11/10/2021
Filed — Alteration
STRUCTURAL RENOVATION WORK ONLY AT AN EXISTING 2 STORY RESIDENTIAL BUILDING WITH ATTIC AND CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00569370-P3
11/04/2021
Special inspection requirement — Post-installed Anchors
Kemba Walcott
11/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
11/04/2021
Special inspection requirement — Structural Steel - Details
Kemba Walcott
11/04/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Kemba Walcott
11/04/2021
Special inspection requirement — Final
Kemba Walcott
11/04/2021
Special inspection requirement — Structural Wood Frame
Kemba Walcott
11/01/2021
Permit issued — General Construction
B00530082-I1-GC
10/25/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2021
Permit issued — Plumbing
B00530116-I1-PL
09/10/2021
Permit issued — Foundation
B00569370-S1-FO
09/10/2021
Permit issued — Structural
B00569370-I1-ST
09/03/2021
Filed — Alteration
STRUCTURAL RENOVATION WORK ONLY AT AN EXISTING 2 STORY RESIDENTIAL BUILDING WITH ATTIC AND CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00569370-P2
09/03/2021
Filed — Alteration
STRUCTURAL RENOVATION WORK ONLY AT AN EXISTING 2 STORY RESIDENTIAL BUILDING WITH ATTIC AND CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00569370-P1
08/25/2021
Objection raised — Admin
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Structural
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Inspections
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Inspections
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Inspections
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Structural
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Structural
08/25/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Other
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Inspections
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Admin
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Admin
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
08/14/2021
Objection raised — Structural
08/14/2021
Objection resolved — Addressed
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNO LIMIT CONTRACTING INC11/01/2021
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC10/20/2021
DOB NOWFoundationSigned-offNO LIMIT CONTRACTING INC09/10/2021
DOB NOWStructuralSigned-offNO LIMIT CONTRACTING INC09/10/2021
DOB NOWGeneral ConstructionSigned-offNO LIMIT CONTRACTING INC07/12/2021
BISPLISSUEDSTEVE BELSITO SONS, INC02/08/2011
BISOTISSUEDN/A01/08/2004
BISPLISSUEDC T A PLBG & HTG01/08/2004
BISOTISSUEDN/A02/20/2001
1 project · most recent 02/08/2022
General Wiring
FiledStatusContractorScope
02/08/2022CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/04/2021Post-installed AnchorsKemba Walcottspecial
11/04/2021Structural Stability – Alterations of existing buildingsKemba Walcottspecial
11/04/2021Structural Steel - DetailsKemba Walcottspecial
11/04/2021Structural Steel - High Strength BoltingKemba Walcottspecial
11/04/2021FinalKemba Walcottprogress
11/04/2021Structural Wood FrameKemba Walcottprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00530082-I1Request digital key ↗
09/01/2026B00530116-P1Request digital key ↗
09/01/2026B00569370-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00530082-I1Open ↗
09/01/2026B00530116-P1Open ↗
09/01/2026B00530116-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00569370-P3Open ↗
09/01/2026B00569370-P3Open ↗
09/01/2026B00569370-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00569370-P3Open ↗
09/01/2026B00569370-P3Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00530082-I1Open ↗
09/01/2026B00530116-P1Open ↗
09/01/2026B00569370-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00530082-I1Open ↗
▸Filing & Intake Forms2
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026B00569370-P3Open ↗
08/16/2026B00569370-I1Open ↗