← Back
Two family converted from one family
87 16 STREET
BROOKLYN · BIN 3023880
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
900 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,340 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction12p · 1 filing · 6 docs
Floor 1Under Construction13p · 2 filings · 13 docs
Basement1p · 1 filing · 7 docs
Sub-BasementUnder Construction4p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S & J CONSTRUCTION SERVIC303/22/2026
S J CONSTRUCTION SERVIC203/21/2026
AH PROPERTY MANAGEMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/27/2025$1.6M—— → —$1,778/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO VURAL201/20/2026
SUPERIOR HOME INSPECTION SERVICES205/09/2025
ENTHINK ENGINEERS LLC107/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KIMCO PAINTING AND CONSTRGeneral Contractor303/21/2026
S & J CONSTRUCTION SVCGeneral Contractor303/21/2026
LCM CONSTRUCTION SVCS INCGeneral Contractor107/25/2026
A.D.S. PLBG AND HTG INCPlumbing107/08/2026
JADA PLUMBING & HTG LLCPlumbing107/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010201/20/2026
SUPERIOR - HOME INSPECTIO1804205/09/2025
Building Lifecycle
All (49)Filed (5)Permit Issued (5)Signed Off (3)Violation (9)Inspection (3)Objection (14)Special Inspection (10)
07/30/2026
Permit issued — Plumbing
B01347274-S1-PL
07/23/2026
Permit issued — General Construction
B01347274-I1-GC
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/09/2026
Objection raised — Cost
03/03/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
03/03/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
03/02/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Plumbing
02/09/2026
Objection raised — Plumbing
02/09/2026
Objection raised — Mechanical
02/09/2026
Objection raised — Other
02/09/2026
Objection raised — Plumbing
01/20/2026
Filed — Alteration
PROPOSE PLUMBING WORK OF UNIT#2 IN EXISTING TWO FAMILY TOWNHOUSE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01347274-S1
01/20/2026
Filed — Alteration
PROPOSE PLUMBING WORK OF UNIT#2 IN EXISTING TWO FAMILY TOWNHOUSE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01347274-I1
01/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/15/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
01/15/2026
Special inspection requirement — Final
XIUCHENG LI
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/15/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
09/02/2025
Violation issued (ECB, closed)
Construction
07/31/2025
Signed off — Alteration
LEGALIZE FIRST FLOOR SHOWER. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B01213813-I1
07/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/16/2025
Permit issued — General Construction
B01213813-I1-GC
07/09/2025
Signed off — Alteration
LEGALIZE FIRST FLOOR SHOWER. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B01213813-S1
07/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — Plumbing
B01213813-S1-PL
06/13/2025
Objection resolved — Addressed
06/02/2025
Signed off — Alteration
B00368213-I1
05/21/2025
Objection raised — Admin
05/09/2025
Filed — Alteration
LEGALIZE FIRST FLOOR SHOWER. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B01213813-I1
05/09/2025
Filed — Alteration
LEGALIZE FIRST FLOOR SHOWER. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY. NO EXISTING BUILDING MATERIALS TO BE DISTURBED UNDER THIS APPLICATION.
B01213813-S1
04/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Steven Williams
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
12/04/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
04/21/2021
Violation issued (HPD, closed)
I
07/17/2020
Permit issued — Sidewalk Shed
B00368213-I1-SH
07/09/2020
Filed — Alteration
B00368213-I1
11/08/2019
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
01/12/2018
Violation issued (HPD, closed)
I
10/02/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJADA PLUMBING & HTG LLC07/30/2026
DOB NOWGeneral ConstructionPermit IssuedLCM CONSTRUCTION SVCS INC07/23/2026
DOB NOWGeneral ConstructionSigned-offKIMCO PAINTING AND CONSTR07/16/2025
DOB NOWPlumbingSigned-offA.D.S. PLBG AND HTG INC06/25/2025
DOB NOWSidewalk ShedSigned-offS & J CONSTRUCTION SVC07/17/2020
BISPLISSUEDPLUMBING & HTG DOCTOR INC09/18/1998
BIS—ISSUEDTHE APPLE GROUP INC04/20/1998
1 project · most recent 01/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/20/2026Permit IssuedJADA PLUMBING & HTG LLCGas, Water/Sanitary
2 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
07/15/2020CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/03/2026Permanent certificateXIUCHENG LIenergy_progress
03/03/2026Interior lighting powerXIUCHENG LIenergy_progress
01/15/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
01/15/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
01/15/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
01/15/2026FinalXIUCHENG LIprogress
01/15/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
01/15/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/25/2025Tenant Protection Plan ComplianceSteven Williamsspecial
04/22/2025Fire-Resistant Penetrations and JointsSteven Williamsspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/21/2026B01213813-I1Request digital key ↗
08/21/2026B01213813-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00368213-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B01347274-S1Open ↗
08/25/2026B01347274-S1Open ↗
08/22/2026B01347274-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/16/2026B01213813-I1Open ↗
09/16/2026B01213813-I1Open ↗
08/25/2026B01347274-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00368213-I1Open ↗
08/13/2026B01213813-I1Open ↗
08/13/2026B01213813-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00368213-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01213813-I1Open ↗