← Back
Four families
947 PRESIDENT STREET
BROOKLYN · BIN 3024708
💬 Discuss this project
1900Year Built
4Stories
C3Building Class
R7BZoning
7,200 sfGross Floor Area
4Units
Rent Stabilized29 Open Violations ▸FDNY Report ↗
Four families · 2,312 sf lot · 3.11 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 3 docs
Floor 4Under Construction11p · 2 filings · 10 docs
Floor 3Under Construction13p · 2 filings · 10 docs
Floor 2Under Construction11p · 2 filings · 10 docs
Floor 1Under Construction11p · 2 filings · 10 docs
Basement2p · 1 filing · 3 docs
Nothing on file for this building.
Building Lifecycle
All (79)Filed (2)Permit Issued (2)Violation (31)Inspection (3)Objection (25)Special Inspection (16)
09/09/2026
Permit issued — Construction Fence
B01453682-I1-FN
08/25/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/18/2026
Permit issued — General Construction
B01414048-I1-GC
07/30/2026
Filed — Alteration
Interior alteration of floors one through four
B01414048-I1
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/09/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
05/05/2026
Violation issued (HPD, open)
A
03/10/2026
Special inspection requirement — Maintenance information
03/10/2026
Special inspection requirement — Exterior lighting power
03/10/2026
Special inspection requirement — Lighting controls
03/10/2026
Special inspection requirement — Metering
11/19/2025
Violation issued (HPD, open)
I
09/05/2025
Objection raised — Fire_Protection
09/05/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Resolved
07/30/2025
Objection resolved — Resolved
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Addressed
07/30/2025
Objection resolved — Resolved
07/30/2025
Objection resolved — Resolved
07/30/2025
Objection resolved — Resolved
07/02/2025
Objection raised — Energy
07/02/2025
Objection raised — Cost
07/02/2025
Objection raised — Ventilation
07/02/2025
Objection raised — Structural
07/02/2025
Objection raised — Structural
07/02/2025
Objection raised — Other
07/02/2025
Objection raised — Structural
07/02/2025
Objection raised — Ventilation
07/02/2025
Objection raised — Admin
07/02/2025
Objection raised — Admin
07/02/2025
Objection raised — Other
07/02/2025
Objection raised — Ventilation
06/23/2025
Filed — Alteration CO
Renovation of existing four family dwelling unit with addition of roof terrace and change of use in basement level
B01244151-I1
06/20/2025
Special inspection requirement — Insulation placement and R values
06/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/20/2025
Special inspection requirement — Fenestration air leakage
06/20/2025
Special inspection requirement — Fenestration areas
06/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/20/2025
Special inspection requirement — Interior lighting power
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/20/2025
Special inspection requirement — Air barrier - visual inspection
06/20/2025
Special inspection requirement — Lighting in dwelling units
06/10/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/24/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
03/01/2022
Violation issued (HPD, open)
I
03/01/2022
Violation issued (HPD, open)
A
04/12/2021
Violation issued (HPD, open)
I
04/12/2021
Violation issued (HPD, open)
A
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UGB CONSTRUCTION109/10/2026
350 BERGEN ST309/01/2026
350 BERGEN ST OF NY LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OPERA STUDIO ARCHITECTURE, LLC207/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGB CONSTRUCTION INCGeneral Contractor209/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616107/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUGB CONSTRUCTION INC09/09/2026
DOB NOWGeneral ConstructionPermit IssuedUGB CONSTRUCTION INC08/18/2026
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/25/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
06/09/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/09/2026FinalSHAHRIAR QUAYYUMprogress
06/09/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
03/10/2026Maintenance information—energy_progress
03/10/2026Exterior lighting power—energy_progress
03/10/2026Lighting controls—energy_progress
03/10/2026Metering—energy_progress
06/20/2025Insulation placement and R values—energy_progress
06/20/2025Fenestration and door U-factor and product ratings—energy_progress
06/20/2025Fenestration air leakage—energy_progress
06/20/2025Fenestration areas—energy_progress
06/20/2025Structural Stability – Alterations of existing buildings—special
06/20/2025Interior lighting power—energy_progress
06/20/2025Fire-Resistant Penetrations and Joints—special
06/20/2025Air barrier - visual inspection—energy_progress
06/20/2025Lighting in dwelling units—energy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01244151-I1Request digital key ↗
08/16/2026B01414048-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/16/2026B01414048-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01244151-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01414048-I1Open ↗
09/01/2026B01414048-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01244151-I1Open ↗
08/16/2026B01414048-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01414048-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01414048-I1Open ↗