Condo, residential unit, 1-3 unit building (orig. class 1)
838 PRESIDENT STREET
BROOKLYN · BIN 3024742
💬 Discuss this project
1887Year Built
—Stories
R6Building Class
R7BZoning
5,012 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · 2,000 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 4 filings · 20 docs
Floor 4Under Construction12p · 2 filings · 20 docs
Floor 3Under Construction13p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VENTURES LL PRESIDENT103/22/2026
PRESIDENT VENTURES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD308/20/2026
CELIN MUNOZ CONSULTING ENGINEER, PC111/18/2025
NOT APPLICABLE211/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FILLER CONSTRUCTION MANGeneral Contractor306/28/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727308/20/2026
CELIN MUNOZ CONSULTING EN1064211/18/2025
Building Lifecycle
All (56)Filed (6)Permit Issued (4)Violation (3)Inspection (1)Objection (12)Special Inspection (30)
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/20/2026
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES
B01265156-P1
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Permit issued — Plumbing
B01265156-I1-PL
06/08/2026
Permit issued — Mechanical Systems
B01264749-I1-MS
06/02/2026
Permit issued — Structural
B01310801-S1-ST
05/28/2026
Permit issued — General Construction
B01310801-I1-GC
12/19/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
11/26/2025
Objection raised — Other
11/18/2025
Filed — Alteration
PROPOSED REINFORCEMENT / REPLACEMENT OF SKYLIGHT AND JOIST FRAMING AT ROOF LEVEL. PROPOSED COLD FORMED STEEL FRAMING AT ROOF DECK LEVEL.
B01310801-S1
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Structural
11/13/2025
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
11/13/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Celin Munoz
11/13/2025
Special inspection requirement — Post-installed Anchors
Celin Munoz
11/13/2025
Special inspection requirement — Structural Wood Frame
Celin Munoz
11/04/2025
Filed — Alteration
PROPOSED REINFORCEMENT / REPLACEMENT OF SKYLIGHT AND JOIST FRAMING AT ROOF LEVEL. PROPOSED COLD FORMED STEEL FRAMING AT ROOF DECK LEVEL.
B01310801-I1
10/30/2025
Special inspection requirement — Final
Celin Munoz
10/30/2025
Special inspection requirement — Wood – Seismic Resistance
Celin Munoz
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
10/30/2025
Special inspection requirement — Structural Steel - Details
Celin Munoz
10/10/2025
Filed — Alteration
installation of mechanical systems
B01264749-I1
10/10/2025
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES
B01265156-I1
09/19/2025
Filed — Alteration
B01280381-I1
09/15/2025
Special inspection requirement — Wood – Seismic Resistance
09/15/2025
Special inspection requirement — Structural Steel - Details
09/09/2025
Special inspection requirement — Post-installed Anchors
09/09/2025
Special inspection requirement — Structural Cold-Formed Steel
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/09/2025
Special inspection requirement — Structural Wood Frame
09/02/2025
Special inspection requirement — Final
07/31/2025
Special inspection requirement — Duct leakage testing, insulation and design
NICHOLAS AZADIAN
07/31/2025
Special inspection requirement — Shutoff dampers
NICHOLAS AZADIAN
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
07/31/2025
Special inspection requirement — Final
NICHOLAS AZADIAN
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
06/12/2002
Violation issued (ECB, closed)
Construction
06/24/1999
Violation issued (ECB, closed)
Construction
12/24/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedASPECT PLBNG&HTNG CO LLC06/08/2026
DOB NOWMechanical SystemsPermit IssuedFILLER CONSTRUCTION MAN06/08/2026
DOB NOWStructuralPermit IssuedFILLER CONSTRUCTION MAN06/02/2026
DOB NOWGeneral ConstructionPermit IssuedFILLER CONSTRUCTION MAN05/28/2026
BIS—ISSUEDA B DESIGN BUILD CORP08/24/2009
BIS—ISSUEDAB DESIGN BUILD CORP.02/06/2008
BISPLISSUEDAMM GEN'L CONTRACTING INC08/31/2007
BISOTISSUEDA B DESIGN BUILD CORP06/05/2007
BIS—ISSUEDAB DESIGN BUILD CORP.06/05/2007
BIS—ISSUEDPRESIDENT VENTURES, LLPY03/01/2001
BISPLISSUEDL.RICHARDS PLBG & HTG06/22/2000
BIS—ISSUEDPRESIDENT VENTURES, LLPY06/20/2000
BISEQISSUEDPRESIDENT VENTURES, L.L.P11/19/1999
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025Permit IssuedFILLER CONSTRUCTION MANHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Lg ZRUM048GSS0 48,000 BTU · Vrf Outdoor ×1
Heating
Vulcan LB-3188 1,914 BTU · Radiant ×2
1 project · most recent 08/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedASPECT PLBNG&HTNG CO LLCGas, Storm, Water/Sanitary
1 project · most recent 11/18/2025
Steel Wood
FiledStatusContractorScope
11/18/2025Permit IssuedFILLER CONSTRUCTION MANSteel, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/21/2026Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/21/2026HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/21/2026HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/21/2026HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
08/21/2026Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/11/2026Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
08/11/2026Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
08/11/2026HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
08/11/2026HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
08/11/2026HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
11/13/2025Structural Cold-Formed SteelCelin Munozspecial
11/13/2025Structural Steel - High Strength BoltingCelin Munozspecial
11/13/2025Post-installed AnchorsCelin Munozspecial
11/13/2025Structural Wood FrameCelin Munozprogress
10/30/2025FinalCelin Munozprogress
10/30/2025Wood – Seismic ResistanceCelin Munozspecial
10/30/2025Structural Stability – Alterations of existing buildingsCelin Munozspecial
10/30/2025Structural Steel - DetailsCelin Munozspecial
09/15/2025Wood – Seismic Resistance—special
09/15/2025Structural Steel - Details—special
09/09/2025Post-installed Anchors—special
09/09/2025Structural Cold-Formed Steel—special
09/09/2025Structural Stability – Alterations of existing buildings—special
09/09/2025Structural Wood Frame—progress
09/02/2025Final—progress
Latest 25 of 34.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01280381-I1Request digital key ↗
08/20/2026B01264749-I1Request digital key ↗
08/20/2026B01265156-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/20/2026B01265156-P1Open ↗
08/14/2026B01310801-S1Open ↗
08/13/2026B01310801-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01265156-P1Open ↗
09/01/2026B01265156-P1Open ↗
08/25/2026B01264749-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B01265156-P1Open ↗
08/25/2026B01264749-I1Open ↗
08/25/2026B01264749-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01280381-I1Open ↗
08/20/2026B01264749-I1Open ↗
08/20/2026B01265156-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/20/2026B01264749-I1Open ↗
08/20/2026B01265156-I1Open ↗
08/15/2026B01310801-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProof of Historic Building2
08/13/2026B01310801-I1Open ↗
08/13/2026B01280381-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/14/2026B01310801-S1Open ↗