← Back
Walk-up cooperative
938 PRESIDENT STREET
BROOKLYN · BIN 3024816
💬 Discuss this project
1888Year Built
3.5Stories
C6Building Class
R7BZoning
5,780 sfGross Floor Area
12Units
2 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 111-115 APT CORP · 2,520 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026CompleteSUPER CHARGED ELEC. INC.General Wiring
1 job · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026——2 scope_items
Building Lifecycle
All (37)Filed (2)Violation (15)Objection (10)Special Inspection (10)
08/25/2026
Filed — Alteration
Combination of apartments #7 & #8 on the 4th floor of existing multiple dwelling as per TPPN 03/97. Remove kitchens and renovate bathrooms, New non-loadbearing partitions, fixtures, finishes and millwork.
B01431330-S3
08/25/2026
Special inspection requirement — Wood – Seismic Resistance
08/24/2026
Objection resolved — Resolved
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/19/2026
Special inspection requirement — Structural Steel - Details
08/19/2026
Special inspection requirement — Post-installed Anchors
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Cost
08/05/2026
Objection raised — Other
07/29/2026
Filed — Alteration
Combination of apartments #7 & #8 on the 4th floor of existing multiple dwelling as per TPPN 03/97. Remove kitchens and renovate bathrooms, New non-loadbearing partitions, fixtures, finishes and millwork.
B01431330-I1
07/22/2026
Special inspection requirement — Final
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/15/2026
Special inspection requirement — Final
07/15/2026
Special inspection requirement — Lighting controls
07/15/2026
Special inspection requirement — Lighting in dwelling units
04/11/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
06/23/2009
Violation issued (FDNY_NOV, closed)
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
938 PRESIDENT CORP103/22/2026
PJB CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GASBARRO STRUCTURAL ENGINEERING108/25/2026
BAXT INGUI ARCHITECTS107/29/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISEQISSUEDP.J.B. CONTRACTING CORP10/26/2011
BISEQISSUEDP.J.B. CONTRACTING CORP08/15/2011
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/25/2026Wood – Seismic Resistance—special
08/19/2026Structural Stability – Alterations of existing buildings—special
08/19/2026Structural Steel - Details—special
08/19/2026Post-installed Anchors—special
07/22/2026Final—progress
07/15/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Fire-Resistance Rated Construction—progress
07/15/2026Final—progress
07/15/2026Lighting controls—energy_progress
07/15/2026Lighting in dwelling units—energy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B01431330-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
10/28/2011320348469Open ↗
08/17/2011320348469Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2011320348469Open ↗
▸Seals & Professional Certifications4
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/17/2011320348469Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/13/2011320348469Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/17/2011320348469Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01431330-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/13/2011320348469Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2011320348469Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/13/2011320348469Open ↗