← Back
Walk-up cooperative
291 GARFIELD PLACE
BROOKLYN · BIN 3025034
💬 Discuss this project
1899Year Built
4Stories
C6Building Class
R7BZoning
—Gross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Walk-up cooperative · 2.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
291 GARFIELD PLACE OWNERS CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSH MANES ARCHITECTURE, DPC207/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VMC PLUMBING & HEATING INPlumbing207/08/2026
ROBIN ELECTRICAL CO., INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRENT M. PORTER, ARCHITEC4140207/24/2023
Building Lifecycle
All (18)Filed (2)Permit Issued (2)Violation (10)Inspection (3)Special Inspection (1)
06/09/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
04/10/2024
Violation issued (HPD, closed)
A
07/24/2023
Filed — Alteration
RENOVATION OF EXISTING MULTI- FAMILY TOWNHOUSE RESIDENCE TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES. REPLACE AND RELOCATE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE, ETC.
B00462949-P1
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brent Porter
06/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Violation issued (HPD, closed)
A
03/01/2023
Permit issued — Plumbing
B00462949-I1-PL
11/09/2022
Violation issued (HPD, closed)
I
03/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2022
Violation issued (HPD, closed)
A
06/04/2021
Permit issued — Plumbing
B00462949-I1-PL
04/09/2021
Violation issued (HPD, closed)
A
03/08/2021
Filed — Alteration
RENOVATION OF EXISTING MULTI- FAMILY TOWNHOUSE RESIDENCE TO INCLUDE MINOR REMOVAL AND INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS AND FINISHES. REPLACE AND RELOCATE PLUMBING FIXTURES AS PER SCHEDULE B AND PLANS FILED HEREWITH. NO CHANGE, ETC.
B00462949-I1
10/17/2018
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC03/01/2023
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC06/04/2021
BISOTISSUEDVBDB INC04/27/2022
BISOTISSUEDVBDB INC03/10/2021
BISPLISSUEDORBIT PLBG & HTG INC11/17/2015
BISOTISSUEDMODERN CONCEPT RENOV INC11/12/2015
1 project · most recent 05/11/2023
General Wiring
FiledStatusContractorScope
05/11/2023CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/10/2023Fire-Resistant Penetrations and JointsBrent Porterspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00462949-I1Request digital key ↗
08/15/2026B00462949-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION3
03/06/2021340804525Open ↗
10/06/2015321204665Open ↗
08/18/2015321204665Open ↗
▸BISWORK PERMIT APPLICATION3
03/10/2021340804525Open ↗
12/10/2015321204665Open ↗
11/17/2015321204665Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026B00462949-P1Open ↗
08/13/2026B00462949-I1Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/18/2015321204665Open ↗
12/10/2015321204665Open ↗
08/18/2015321204665Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/06/2021340804525Open ↗
08/18/2015321204665Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00462949-I1Open ↗
08/13/2026B00462949-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/06/2021340804525Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/18/2015321204665Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/26/2026B00462949-P1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/06/2015321204665Open ↗
08/18/2015321204665Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
03/10/2021340804525Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/06/2021340804525Open ↗
08/18/2015321204665Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00462949-I1Open ↗
08/13/2026B00462949-P1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/18/2015321204665Open ↗
12/10/2015321204665Open ↗
08/18/2015321204665Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/18/2015321204665Open ↗
12/10/2015321204665Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/06/2021340804525Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/06/2021340804525Open ↗
03/06/2021340804525Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/18/2015321204665Open ↗
12/10/2015321204665Open ↗
▸BISLANDMARKS APPROVAL1
03/06/2021340804525Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/06/2021340804525Open ↗
12/18/2015321204665Open ↗
08/18/2015321204665Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
03/06/2021340804525Open ↗
▸BISADDITIONAL INFORMATION1
10/08/2015321204665Open ↗
▸BISEFILING COVER SHEET1
08/18/2015321204665Open ↗