← Back
Two family brick
499 1 STREET
BROOKLYN · BIN 3025086
💬 Discuss this project
1889Year Built
3Stories
B1Building Class
R6BZoning
2,516 sfGross Floor Area
2Units
Two family brick · 1,800 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 1 filing · 10 docs
Floor 25p · 1 filing · 10 docs
Floor 1
Cellar4p · 1 filing · 10 docs
1 job · most recent 04/06/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/06/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 04/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/06/2026——Gas, Storm, Water/Sanitary
2 jobs · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
06/15/2020CompleteRICHARD NEU—
1 job · most recent 04/06/2026
Steel
FiledStatusContractorScope
04/06/2026——Steel
Building Lifecycle
All (32)Filed (6)Permit Issued (2)Signed Off (2)Objection (12)Special Inspection (10)
06/05/2026
Objection raised — Scope
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Scope
04/17/2026
Objection raised — Scope
04/06/2026
Filed — Alteration
STRUCTURAL WORK FOR 2-FAMILY RENOVATIONS AS PER PLANS FILED HEREWITH.
B01372746-S3
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Other
04/03/2026
Objection raised — Scope
03/24/2026
Filed — Alteration
STRUCTURAL WORK FOR 2-FAMILY RENOVATIONS AS PER PLANS FILED HEREWITH.
B01372746-I1
03/24/2026
Filed — Alteration
STRUCTURAL WORK FOR 2-FAMILY RENOVATIONS AS PER PLANS FILED HEREWITH.
B01372746-S1
03/24/2026
Filed — Alteration
STRUCTURAL WORK FOR 2-FAMILY RENOVATIONS AS PER PLANS FILED HEREWITH.
B01372746-S2
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Special inspection requirement — Structural Steel - Welding
03/18/2026
Special inspection requirement — Structural Wood Frame
03/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/18/2026
Special inspection requirement — Structural Steel - Details
03/17/2026
Special inspection requirement — Final
03/16/2026
Special inspection requirement — Mechanical Systems
03/16/2026
Special inspection requirement — Final
10/21/2020
Signed off — Alteration
B00355329-I1
10/21/2020
Signed off — Alteration
B00355339-I1
06/10/2020
Permit issued — Sidewalk Shed
B00355339-I1-SH
06/10/2020
Permit issued — Supported Scaffold
B00355329-I1-SF
06/09/2020
Filed — Alteration
B00355329-I1
06/09/2020
Filed — Alteration
B00355339-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHA CONSULTING INC.104/06/2026
RJD ENGINEERING LLC203/24/2026
STAPLE DESIGN103/24/2026
ENTHINK ENGINEERS LLC206/09/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS06/10/2020
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS06/10/2020
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/24/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Structural Stability – Alterations of existing buildings—special
03/18/2026Structural Steel - Welding—special
03/18/2026Structural Wood Frame—progress
03/18/2026Structural Steel - High Strength Bolting—special
03/18/2026Structural Steel - Details—special
03/17/2026Final—progress
03/16/2026Mechanical Systems—special
03/16/2026Final—progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/17/2026B01372746-S3Request digital key ↗
08/17/2026B01372746-S2Request digital key ↗
08/17/2026B01372746-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00355329-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00355339-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026B01372746-S2Open ↗
08/17/2026B01372746-S1Open ↗
08/17/2026B01372746-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00355329-I1Open ↗
08/13/2026B00355339-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026B01372746-I1Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/17/2026B01372746-I1Open ↗