← Back
Walk-up cooperative
202 8 AVENUE
BROOKLYN · BIN 3025199
💬 Discuss this project
1890Year Built
3.75Stories
C6Building Class
R7BZoning
4,900 sfGross Floor Area
5Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 202 8TH AVE HOUSING CORP · 2,000 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
202 8TH AVE HOUSING CORP203/22/2026
202 HOUSING CORP103/22/2026
202 EIGHTH AVENUE HOUSING CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB104/29/2026
JOHN PATRICK CUNNINGHAM211/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VERTEX ELECTRIC CORP.Electrical103/22/2026
AJAF CONSTRUCTION CORPGeneral Contractor107/08/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor107/01/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
Building Lifecycle
All (34)Filed (3)Permit Issued (3)Signed Off (3)Violation (20)Inspection (2)Special Inspection (3)
06/29/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01394791-I1
04/30/2026
Permit issued — Supported Scaffold
B01394791-I1-SF
04/29/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01394791-I1
05/14/2025
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION AND RELOCATION OF FIXTURES IN UNIT #2 LOCATED ON THE FIRST FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01128871-S1
05/14/2025
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION AND RELOCATION OF FIXTURES IN UNIT #2 LOCATED ON THE FIRST FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01128871-I1
03/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Permit issued — Plumbing
B01128871-S1-PL
11/18/2024
Permit issued — General Construction
B01128871-I1-GC
11/01/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION AND RELOCATION OF FIXTURES IN UNIT #2 LOCATED ON THE FIRST FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01128871-S1
11/01/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION AND RELOCATION OF FIXTURES IN UNIT #2 LOCATED ON THE FIRST FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01128871-I1
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
John Cunningham
10/17/2024
Special inspection requirement — Final
John Cunningham
10/17/2024
Special inspection requirement — Lighting in dwelling units
John Cunningham
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
03/27/2021
Violation issued (HPD, open)
C
03/27/2021
Violation issued (HPD, open)
B
03/27/2021
Violation issued (HPD, open)
B
07/15/2019
Violation issued (HPD, open)
B
07/15/2019
Violation issued (HPD, closed)
C
07/15/2019
Violation issued (HPD, closed)
B
07/15/2019
Violation issued (HPD, closed)
B
07/15/2019
Violation issued (HPD, closed)
C
04/19/2019
Violation issued (HPD, open)
B
05/30/2018
Violation issued (HPD, open)
B
11/15/2017
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
09/09/2015
Violation issued (HPD, closed)
B
09/04/2015
Violation issued (ECB, closed)
Construction
11/05/1987
Violation issued (FDNY_NOV, closed)
10/04/1985
Violation issued (HPD, closed)
A
10/04/1985
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION04/30/2026
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC12/20/2024
DOB NOWGeneral ConstructionSigned-offAJAF CONSTRUCTION CORP11/18/2024
3 projects · most recent 12/16/2024
General Wiring
FiledStatusContractorScope
12/16/2024CompletePAUL M. & SON'S ELECL CONGeneral Wiring
03/22/2024CompleteVERTEX ELECTRIC CORP.—
12/03/2019CompleteVERTEX ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/17/2024Energy Code Compliance InspectionsJohn Cunninghamprogress
10/17/2024FinalJohn Cunninghamprogress
10/17/2024Lighting in dwelling unitsJohn Cunninghamenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B01128871-I1Request digital key ↗
08/23/2026B01128871-S1Request digital key ↗
08/17/2026B01394791-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026B01128871-I1Open ↗
08/13/2026B01128871-S1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01128871-I1Open ↗
08/23/2026B01128871-S1Open ↗
08/17/2026B01394791-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01128871-I1Open ↗
08/23/2026B01128871-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026B01128871-I1Open ↗
08/23/2026B01128871-S1Open ↗